APPENDIX A.2
PLANNING AND DEVELOPMENT DEPARTMENT FEE SCHEDULE1

Part 1. Site Planning Fees

1.     In General.

2.     Time Limitations for Landscape Permits.

3—10.    Reserved.

Part 2. Site Plan Review Fees

11.     Site Plan Conceptual Review Services.

12.     Site Plan Base Review Services.

13.     Master Plan Review Services.

14—20.    Reserved.

Part 3. Environmental Plan Review and Permit Fees

21.     Hillside Development Review and Permits.

22.     Landscape Plan Review.

23.     Optional Landscape Plan Review Services.

24.     Environmentally Sensitive Lands Plan Review and Permits.

25.     Plan Review of Corrections to Environmental Plans.

26—30.    Reserved.

Part 4. Subdivision and Property Division Plan Review Fees

31.     Preliminary Subdivision Plan Review Fees.

32.     Property Division (Parcel Combinations and Lot Splits).

33.     Model Home Complex Review.

34—40.    Reserved.

Part 5. Site Planning Miscellaneous Fees

41.     Miscellaneous Reviews.

42.     Property Dedications.

43.     Plan Review of Corrections to Site Plans.

44.     Amendments to Final Site Plans.

45.     Site Permit on Commercial Buildings.

46.     Appeals.

47—55.    Reserved.

Part 6. Sign Fees

56.     Sign Fees.

57—70.    Reserved.

Part 7. Sign Plan Review Fees

71.     Sign Plan Review.

72.     Optional Plan Review Services.

73.     Comprehensive Sign Plans.

74.     Appeals and Modifications.

75.     Plan Review of Corrections to Plans.

76—80.    Reserved.

Part 8. Sign Permit Fees

81.     Sign Permits.

82.     Re-inspection Fee for Sign Permits.

83.     Permit Time Extension and Reinstatement.

84—90.    Reserved.

Part 9. Signs Miscellaneous Fees

91.     Investigation Fee for Work Done Without a Permit.

92.     Removal of Illegal Sign.

93.     Staff Consultation and Research.

94.     Miscellaneous Inspection Service.

95—100.    Reserved.

Part 10. Civil Engineering Fees

101.    Civil Engineering Fees.

102.    Time Limitations for Civil Engineering Permits.

103—110.    Reserved.

Part 11. Civil Engineering Abandonment Fees

111.    Abandonment Application Fees and Consideration.

112.    Abandonment Appeals and Extensions.

113—120.    Reserved.

Part 12. Civil Engineering Plan Review Fees

121.    Basic Plan Review Services.

122.    Sewer and Water Line Plan Review.

123.    Final Subdivision Plat Review.

124.    Optional Plan Review Services.

125.    Plan Review of Corrections to Plans.

126—135.    Reserved.

Part 13. Civil Engineering Permit Fees

136.    On-Site Improvements.

137.    Grading and Drainage, Stockpile, Engineered Fill, or Storm Water Permits.

138.    Haul Permit.

139.    Landscape Permit.

140.    Permit Time Extension and Reinstatement.

141.    Right-Of-Way Improvements.

142.    Right-of-Way Permits.

143.    Civil Engineering Valuation Based Permits.

144.    Permit Time Extension and Reinstatement.

145—150.    Reserved.

Part 14. Civil Engineering Inspection Fees

151.    Re-inspection Fee for All Construction Permits.

152.    After-Hour Inspection Request.

153—160.    Reserved.

Part 15. Civil Engineering Miscellaneous Fees

161.    Investigation Fee for Work Done Without a Permit.

162.    Civil Engineering Appeals.

163—170.    Reserved.

Part 16. Building Safety Fees

171.    Building Safety Fees.

172.    Project Valuation.

173.    Time Limitations for Building Safety Permits.

174—180.    Reserved.

Part 17. Building Safety Plan Review Fees

181.    Basic Plan Review Services.

182.    Phased, Partial, and Deferred Submittal Plan Review.

183.    Optional Plan Review Services.

184.    Self-Certification Program.

185.    Plan Review of Corrections to Plans.

186—195.    Reserved.

Part 18. Building Safety Permit Fees

196.    New Construction, Additions and Remodel Existing Building Permits.

197.    Phased, Partial, and Deferred Submittal Permits.

198.    Additional Utility Meter Fee.

199.    Manufactured Building.

200.    Demolition Permits and Move-off Permits.

201.    Permit Time Extension.

202.    Permit Reinstatement.

203—211.    Reserved.

Part 19. Building Safety Inspection Fees

211.    Re-inspection Fee for All Construction Permits.

212.    After-Hour Inspection Request.

213.    Conditional Utility Clearances (Non-refundable Fee).

214.    Temporary Power.

215.    Certificate of Occupancy (Non-refundable Fee).

216.    Periodic Safety Inspections—Elevators, Dumbwaiters and Escalators.

217.    Refrigeration System Periodic Inspections.

218.    Annual Facilities Permit.

219.    Building Maintenance Registration Fees.

220.    Journeyman Licenses.

221—230.    Reserved.

Part 20. Building Safety Miscellaneous Fees

231.    Alternative Methods, Materials and Equipment.

232.    Residential Solar Photovoltaic System Permit.

233.    Solar Water Heaters.

234.    Appeals, Modifications, and Formal Interpretations.

235.    Fees for Work Done Without a Permit.

236.    Miscellaneous Inspection Service.

237—245.    Reserved.

Part 21. Planning and Development Miscellaneous Fees

246.    [Generally.]

247.    Letter Agreements.

248.    Extended Construction Work Hours Permit.

249.    General Hourly Rates.

250.    Record Change Fee.

251.    Refund Request Processing Fee.

252.    Copies.

253.    Technical Publications for Sale.

254.    Infill Waivers.

Part 22. Glossary Of Terms


1

Editor's notePrinted herein is the Planning and Development Department Fee Schedule. Amendments subsequent to Ord. No. G-4080 are indicated by parenthetical history notes following the amended section. As part of the 2001 Republication, part and section numbers were added by the editor to facilitate indexing and referencing. Obvious misspellings and punctuation errors have been corrected without notation. Stylistic changes have been made to conform with the Code of Ordinances. Any other changes are indicated by brackets.

The history note for the schedule prior to the 2001 Republication listed the following ordinances: Ord. No. G-3346, § 9; Ord. No. G-3389, § 1; Ord. No. G-3512, § 1; Ord. No. G-3541, § 1; Ord. No. G-3844, § 1; Ord. No. G-3849, § 1; Ord. No. G-3870, § 1; Ord. No. G-3883, § 1; Ord. No. G-3972, passed 12-18-1996, eff. 1-20-1997; Ord. No. G-4046, § 1, passed 10-1-1997, eff. 11-3-1997; Ord. No. G-4080, § 1, passed 4-1-1998, eff. 5-1-1998.

Subsequently, Ord. No. G-4357, passed June 13, 2001, effective August 4, 2001, amended Appendix A.2, in its entirety, to read as herein set out. Again, section numbers were added by the editor to facilitate indexing and referencing. See the Code Comparative Table.

Subsequently, Ord. No. G-4879, adopted March 21, 2007, effective May 1, 2007, amended Appendix A.2, in its entirety, to read as herein set out. Again, section numbers were added by the editor to facilitate indexing and referencing. See the Code Comparative Table.

Subsequently, Ord. No. G-5458, adopted December 16, 2009, effective January 19, 2010, amended Appendix A.2, in its entirety, to read as herein set out. Again, section numbers were added by the editor to facilitate indexing and referencing. See the Code Comparative Table.

Subsequently, Ord. No. G-5472, adopted January 20, 2010, effective March 1, 2010, amended Appendix A.2, in its entirety, to read as herein set out. Again, section numbers were added by the editor to facilitate indexing and referencing. See the Code Comparative Table.

It should be noted the Ord. No. G-5590, § 1, adopted February 23, 2011, effective 3-25-2011 amended the title of Appendix A.2 to read as herein set out. Formerly said Appendix was entitled Development Services Department Fee Schedule.

Cross referenceBuilding regulations, ch. 9; sewers, ch. 28; streets and sidewalks, ch. 31; subdivisions, ch. 32; grading and drainage, ch. 32A; floodplain plan review fees, § 32B-17; zoning, ch. 41; planning and zoning fees, ch. 41A.