FEE SCHEDULE
FLOODPLAIN REGULATION
for
Pinal County, ARIZONA
The following administrative fees shall be charged for the processing of Appeals, Floodplain Use Permits, Floodplain Variances, plans review and performance bonds with no provision for refund:
|
Category 1: Permits which require a minimum of technical review. |
|
|
PERMIT FEE: $40.00 |
|
|
Single Family Residence |
|
|
Mobile/Manufactured Buildings |
|
|
Commercial/Industrial |
|
|
$150.00 - When site inspection is required |
|
|
Category 2: Permits which require technical hydrologic or engineering review. |
|
|
PERMIT FEE: The fee will be no less than $2800 for Category 2 review or amendment to submittal. If the Floodplain administrator needs to send the review to an outside reviewer, the fee will be the quoted fee of the outside reviewer for the project, plus an additional 15% administration fee. |
|
|
Residential Subdivisions |
|
|
Commercial including strips and centers |
|
|
Industrial including parks |
|
|
Sand and Gravel operations |
|
|
Floodplain Delineation Review (LOMRs) |
|
|
OTHER FEES |
|
|
Floodplain Clearance |
$ 20.00 |
|
Sand and Gravel Renewal (Five Year) |
$500.00 |
|
Appeals/Variances (Floodplain Board of Review or Board of Directors) |
|
|
Residential, Commercial, Industrial(posting required) |
$ 400.00 |
|
Site Inspection of lot grading including PAD, Category 1 Amendment, each lot |
|
|
(requires minimum of 2 site visits) |
$75.00/ visit |
|
Continuance of Hearing - Applicant’s Request |
$ 50.00 |
|
(If new posting is required) |
$160.00 |
|
Regulation (per copy) |
$ 7.50 |
|
Performance Bond: 100% cost of required improvement or cost to abate violation, or 50% of value at risk, whichever is higher. |
|