6.110A.010 Preliminary/final planning and environmental review fees.

Fees for review activities included in Table 6.110A.010 shall be collected prior to processing the application:

Table 6.110A.010—Preliminary/Final Planning and Environmental Review Fees 

Section

Activity

Fee

1

 

 

 

Appeals

 

 

A

 

 

Appeals to Hearings Examiner

 

 

 

 

 

 

Planning portion only See engineering fees for additional charges

4,826

 

B

 

 

Appeals to Board of Commissioners

 

 

 

 

 

 

Fees paid to board of county commissioners

716

2

 

 

 

Planning Fees9

 

 

A

 

 

Address Change

105

 

B

 

 

Applicant Initiated Hold/Open Record for Hearing

450

 

C

 

 

Annual Reviews Initiated by Property Owners

 

 

 

 

 

 

Fee includes rezones in conjunction with annual review

8,113

 

D

 

 

Boundary Line Adjustments1

 

 

 

I

 

 

Base fee

838

 

 

II

 

 

Fee per adjustment over 2

124

 

E

 

 

Columbia River Gorge

4,667

 

F

 

 

Conditional Use Permit2

 

 

 

I

 

 

Minor Includes day care centers, roadside stands, utility substations, kennels, veterinary clinics, additions of up to 10% of additional square feet beyond the existing building and structures, and similar uses as determined by the planning director2

7,442

 

 

II

 

 

Major All uses not indicated above2

7,442

 

G

 

 

Continuance of Hearing3

 

 

 

 

 

 

For any hearing postponed or continued, as requested by the applicant after legal notice has been given; provided, that this requirement shall not apply (1) where the request is based upon new information presented at the hearing other than from the applicant or (2) when renoticing of the hearing is requested and approved.3

1,579

 

H

 

 

Covenant Release Full and Partial

1,266

 

I

 

 

Design Standard Review Mixed Use/Commercial/

Performance Based Zoning

Site plan review fee plus 300% increase

 

J

 

 

Forest Practice

 

 

 

I

 

 

Conversion option harvest plan (COHP) with approved current use timber management plan

648

 

 

II

 

 

COHP without approved current use timber management plan

1,226

 

 

III

 

 

Class IV G

 

 

 

 

a

 

Including SEPA

3,166

 

 

 

b

 

Without SEPA

1,638

 

 

IV

 

 

Open space/current use taxation

1,963

 

 

V

 

 

Type I, single-family dwelling moratorium waiver and field reviews of nonexempt Class I forest practices

2,067

 

 

VI

 

 

Type III, all other moratorium waivers

2,838

 

 

VII

 

 

Hazard tree removal determination, stand alone

554

 

K

 

 

Habitat Conservation

 

 

 

I

 

 

Clearing permit Type I

849

 

 

 

 

 

Clearing permit Type II and III

1,467

 

 

II

 

 

Habitat predetermination

625

 

 

III

 

 

Stewardship plan

849

 

 

IV

 

 

Habitat only programmatic permit Type I

1,358

 

 

V

 

 

Habitat only programmatic permit Type II

2,552

 

 

VI

 

 

Habitat only programmatic permit Re-authorization

783

 

 

VII

 

 

Habitat portion of combined habitat/wetland programmatic permit Type I

1,222

 

 

VIII

 

 

Habitat portion of combined habitat/wetland programmatic permit Type II

2,297

 

 

IX

 

 

Habitat portion of combined habitat/wetland programmatic permit Re-authorization

705

 

 

X

 

 

Agricultural management plan

0

 

 

XI

 

 

Habitat permit Type III Public interest exception

3,445

 

 

XII

 

 

Residential building permit review

288

 

 

 

a

 

Plus: field visit

230

 

 

XIII

 

 

Habitat ordinance applicability review for site plan or land division

115

 

 

 

a

 

Plus: field visit

230

 

 

XIV

 

 

Habitat conservation covenant alteration

 

 

 

 

a

 

Type I with any other review

394

 

 

 

b

 

Type I “stand alone”

668

 

 

 

c

 

Type II or III with any other review

625

 

 

 

d

 

Type II or III “stand alone”

1,969

 

 

XV

 

 

Monitoring inspection/permit10, 11

 

 

 

 

a

 

First year

604

 

 

 

b

 

Subsequent years

316

 

 

 

c

 

Additional inspections

230

 

L

 

 

Home Business4 – Planning Portion Only – See Engineering Fees for Additional Charges

 

 

 

I

 

 

Minor Urban and Rural Type I Review without private road access

106

 

 

II

 

 

Minor Urban and Rural Type I Review with private road access/neighborhood agreement

159

 

 

III

 

 

Minor Urban and Rural Type II Review with private road access/no neighborhood agreement

2,058

 

 

IV

 

 

Major Urban Type II Review without private road access (base fee)

2,696

 

 

 

a

 

Plus: private road access

532

 

 

V

 

 

Major Rural Type II Review (base fee):

2,696

 

 

 

a

 

Plus: private road access

532

 

 

 

b

 

Plus: activity area screening

532

 

M

 

 

Land Use Compliance Fact Sheet

53

 

N

 

 

Legal Lot Determination

 

 

 

I

a

 

Base fee

1,193

 

 

 

b

 

Fee per lot over 2 lots

372

 

 

II

 

 

For individual single-family or manufactured home

527

 

 

III

 

 

Innocent purchaser

1,020

 

 

IV

 

 

Public interest exception

3,765

 

O

 

 

Lot Reconfiguration

 

 

 

I

 

 

Base fee

838

 

 

II

 

 

Fee per adjustment over 2

124

 

P

 

 

Mining7, 12

Cost recovery7, 12

 

Q

 

 

Planned Unit Development or Master Plan2

 

 

 

I

 

 

P.U.D. Any type

4,632

 

R

 

 

Planning Director Review

 

 

 

I

 

 

Nonconforming use determination

3,066

 

 

II

 

 

Similar use determination

1,170

 

 

III

 

 

Temporary use Type I

1,584

 

 

IV

 

 

All other reviews5

2,650

 

S

 

 

Plat Alterations Planning Portion Only See Engineering Fees for Additional Charges

 

 

 

I

 

 

Plat alteration

3,468

 

 

II

 

 

Additional fee charged to applicant if hearing is requested pursuant to Section 40.540.120(B).

1,882

 

T

 

 

Post Decision Review

 

 

 

I

 

 

Post decision review/Type I (includes deadline extensions requests for phased developments)

2,103

 

 

II

 

 

Post decision review/Type II

3,436

 

 

III

 

 

Post decision review/Type III

5,965

 

U

 

 

Pre-Application Conference Planning Portion Only See Engineering Fees for Additional Charges

 

 

 

I

 

 

Pre-application conference

1,288

 

 

II

 

 

Pre-application waiver request6

694

 

V

 

 

Renoticing3

 

 

 

I

 

 

Base fee

184

 

W

 

 

Reporting Application and Permit Information7

 

 

 

 

 

 

Cost recovery Applicant will be required to sign an agreement that they will pay the billable hourly rate of the program. The applicant will be sent an itemized billing.

Cost recovery7

 

X

 

 

SEPA Review

 

 

 

I

 

 

Project reviews any type

1,528

 

 

II

 

 

Non-projects (includes annual review applications)

1,987

 

 

III

 

Appeals

1,493

 

 

IV

 

 

EIS review7

Cost recovery7

 

Y

 

 

Sewer Waiver

990

 

Z

 

 

Shoreline Permit

 

 

 

I

 

 

Shoreline permit

2,899

 

 

II

 

 

Shoreline conditional use permit

3,431

 

 

III

 

 

Shoreline permit when considered with a variance request

3,431

 

 

IV

 

 

Shoreline exemption determination

421

 

AA

 

 

Short Plat

4,802

 

AB

 

 

Sign

 

 

 

I

 

 

Sign

210

 

AC

 

 

Site Plan Review Fast Lane Permitting

 

 

 

I

 

 

Program for reduced timelines for site plan review

Site plan review fee plus 50% increase

 

AD

 

 

Site Plan Review Preliminary All Types Planning Portion Only See Engineering Fees for Additional Charges

 

 

 

I

 

 

Site plan review/Type I

2,163

 

 

II

 

 

Site plan review/Type II or commercial pad within a previously approved site plan which was not reviewed for the specific use or structure under the original site plan review

5,589

 

 

III

 

 

Unoccupied commercial and utility structures

2,429

 

 

IV

 

 

Binding site plan review Stand alone is full price; if combined with PSR, this fee is reduced 50%

3,927

 

AE

 

 

Site Plan Review Final Inspection by Planner7

Cost recovery7

 

AF

 

 

Special Study Review7, 12

Cost recovery7

 

AG

 

 

Special Valuation Historic Preservation

303

 

AH

 

 

Subdivision

8,364

 

AI

 

 

Variance

 

 

 

I

 

 

Administrative variance/Type I

1,561

 

 

II

 

 

Administrative variance/Type I When considered with a development application Planning portion only See engineering fees for additional charges

1,611

 

 

III

 

 

Administrative variance/Type II

3,348

 

 

IV

 

 

Administrative variance/Type II When considered with a development application Planning portion only See engineering fees for additional charges

1,910

 

 

V

 

 

Type III Planning portion only See engineering fees for additional charges

6,531

 

 

VI

 

 

Type III When considered with a development application Planning portion only See engineering fees for additional charges

5,564

 

AJ

 

 

Wetland Protection8

 

 

 

I

 

 

Predetermination

740

 

 

 

a

 

With stormwater review

855

 

 

II

 

 

Wetland permit/Type I

892

 

 

III

 

 

Wetland permit/Type II and III

1,928

 

 

IV

 

 

Wetland permit/Type III reasonable use Stand alone

3,445

 

 

V

 

 

Wetland delineation digital preparation

273

 

 

VI

 

 

Wetland only programmatic permit Type I

1,358

 

 

VII

 

 

Wetland only programmatic permit Type II

2,552

 

 

VIII

 

 

Wetland only programmatic permit Re-authorization

783

 

 

IX

 

 

Wetland portion of combined wetland/habitat programmatic permit Type I

1,222

 

 

X

 

 

Wetland portion of combined wetland/habitat programmatic permit Type II

2,297

 

 

XI

 

 

Wetland portion of combined wetland/habitat programmatic permit Re-authorization

705

 

 

XII

 

 

Wetland protection covenant alteration

 

 

 

 

a

 

Type I with any other review

394