6.110A.010 Preliminary/final planning and environmental review fees.
Fees for those preliminary plan review activities included in Table 6.110A.010 shall be collected prior to processing the application:
|
Section |
Activity |
Fee |
Issuance Fee |
||||
|---|---|---|---|---|---|---|---|
|
1 |
|
|
|
Appeals |
|
|
|
|
|
A |
|
|
Appeals to Hearings Examiner |
|
|
|
|
|
|
|
|
|
Planning portion only – See engineering fees for additional charges |
1,166 |
94 |
|
|
B |
|
|
Reconsideration by Hearings Examiner |
|
|
|
|
|
|
|
|
|
Reimburse county at hourly rate of examiner |
94 |
|
|
2 |
|
|
|
Planning Fees9 |
|
|
|
|
|
A |
|
|
Address Change |
|
|
|
|
|
|
|
|
|
105 |
N/A |
|
|
|
B |
|
|
Applicant Initiated Hold/Open Record for Hearing |
|
|
|
|
|
|
|
|
|
174 |
N/A |
|
|
|
C |
|
|
Annual Reviews Initiated by Property Owners |
|
|
|
|
|
|
|
|
|
Fee includes rezones in conjunction with annual review |
8,113 |
94 |
|
|
D |
|
|
Boundary Line Adjustments1 |
|
|
|
|
|
|
I |
|
|
Base fee |
355 |
53 |
|
|
|
II |
|
|
Fee per adjustment over 2 |
124 |
|
|
|
E |
|
|
Columbia River Gorge |
|
|
|
|
|
|
|
|
|
Expedited Gorge review |
2,663 |
94 |
|
|
|
|
|
|
Gorge review |
4,667 |
94 |
|
|
F |
|
|
Conditional Use Permit2 |
|
|
|
|
|
|
I |
|
|
Conditional use permit |
5,952 |
53 |
|
|
|
II |
|
|
Conditional use permit submitted concurrently with site plan review application |
2,976 |
53 |
|
|
|
III |
|
|
Additional fee charged to applicant if hearing is requested for conditional use pursuant to Section 40.510.025(C)(4) |
1,490 |
N/A |
|
|
G |
|
|
Continuance of Hearing3 |
|
|
|
|
|
|
|
|
|
For any hearing postponed or continued, as requested by the applicant after legal notice has been given; provided, that this requirement shall not apply (1) where the request is based upon new information presented at the hearing other than from the applicant or (2) when renoticing of the hearing is requested and approved.3 |
1,579 |
N/A |
|
|
H |
|
|
Covenant Release – Full and Partial |
|
|
|
|
|
|
|
|
|
|
1,266 |
94 |
|
|
I |
|
|
Design Standards Review – Mixed Use/Performance Based Zoning Including Hwy 99 |
|
|
|
|
|
|
I |
|
|
Highway 99 sub-area Level I review |
279 |
53 |
|
|
|
II |
|
|
Highway 99 sub-area Level II review |
785 |
53 |
|
|
|
III |
|
|
Highway 99 sub-area Level III review/mixed use design review |
Site plan review fee plus 100% increase |
53 |
|
|
J |
|
|
Forest Practice |
|
|
|
|
|
|
I |
|
|
Conversion option harvest plan (COHP) with approved current use timber management plan |
648 |
53 |
|
|
|
II |
|
|
COHP without approved current use timber management plan |
1,226 |
53 |
|
|
|
III |
|
|
Class IV G |
|
53 |
|
|
|
|
a |
|
including SEPA |
3,166 |
53 |
|
|
|
|
b |
|
without SEPA |
1,638 |
53 |
|
|
|
IV |
|
|
Open space/current use taxation |
1,963 |
53 |
|
|
|
V |
|
|
Type I, single-family dwelling moratorium waiver and field reviews of nonexempt Class I forest practices |
876 |
53 |
|
|
|
VI |
|
|
Type III, all other moratorium waivers |
2,838 |
53 |
|
|
|
VII |
|
|
Hazard tree removal determination, stand alone |
554 |
53 |
|
|
K |
|
|
Habitat Conservation |
|
|
|
|
|
|
I |
|
|
Clearing permit Type I |
849 |
53 |
|
|
|
|
|
|
Clearing permit Types II and III |
1,467 |
53 |
|
|
|
II |
|
|
Habitat predetermination |
625 |
53 |
|
|
|
III |
|
|
Stewardship plan |
849 |
53 |
|
|
|
IV |
|
|
Habitat only programmatic permit – Type I |
1,358 |
53 |
|
|
|
V |
|
|
Habitat only programmatic permit – Type II |
2,552 |
53 |
|
|
|
VI |
|
|
Habitat only programmatic permit – Re-authorization |
783 |
53 |
|
|
|
VII |
|
|
Habitat portion of combined habitat/wetland programmatic permit – Type I |
1,222 |
53 |
|
|
|
VIII |
|
|
Habitat portion of Combined habitat/wetland programmatic permit – Type II |
2,297 |
53 |
|
|
|
IX |
|
|
Habitat portion of combined habitat/wetland programmatic permit – Re-authorization |
705 |
53 |
|
|
|
X |
|
|
Agricultural management plan |
0 |
N/A |
|
|
|
XI |
|
|
Habitat permit Type III – Public interest exception |
3,445 |
53 |
|
|
|
XII |
|
|
Residential building permit review |
288 |
N/A |
|
|
|
|
a |
|
Plus: field visit |
230 |
N/A |
|
|
|
XIII |
|
|
Habitat ordinance applicability review for site plan or land division |
115 |
N/A |
|
|
|
|
a |
|
Plus: field visit |
230 |
N/A |
|
|
|
XIV |
|
|
Habitat conservation covenant alteration |
|
N/A |
|
|
|
|
a |
|
Type I review |
6682 |
53 |
|
|
|
|
b |
|
Type II review |
1,0122 |
53 |
|
|
|
|
c |
|
Type III review |
2,5672 |
53 |
|
|
|
XV |
|
|
Monitoring inspection/permit10,11 |
|
53 |
|
|
|
|
a |
|
First year |
604 |
N/A |
|
|
|
|
b |
|
Subsequent years |
316 |
N/A |
|
|
|
|
c |
|
Additional inspections |
230 |
N/A |
|
|
L |
|
|
Home Business4 – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
|
I |
|
|
Minor urban and rural Type I review without private road access |
106 |
53 |
|
|
|
II |
|
|
Minor urban and rural Type I review with private road access/neighborhood agreement |
159 |
53 |
|
|
|
III |
|
|
Minor urban and rural Type II review with private road access/no neighborhood agreement |
2,058 |
53 |
|
|
|
IV |
|
|
Major urban Type II review without private road access (base fee) |
2,696 |
53 |
|
|
|
|
|
|
Plus: private road access |
532 |
N/A |
|
|
|
V |
|
|
Major rural Type II review (base fee): |
2,696 |
53 |
|
|
|
|
a |
|
Plus: private road access |
532 |
N/A |
|
|
|
|
b |
|
Plus: activity area screening |
532 |
N/A |
|
|
M |
|
|
Land Use Compliance Fact Sheet |
|
|
|
|
|
|
|
|
|
|
53 |
N/A |
|
|
N |
|
|
Legal Lot Determination |
|
|
|
|
|
|
I |
a |
|
Base fee |
838 |
53 |
|
|
|
|
b |
|
Fee per lot over 2 lots |
372 |
N/A |
|
|
|
II |
|
|
For individual single-family or manufactured home |
527 |
53 |
|
|
|
III |
|
|
Innocent purchaser |
1,020 |
53 |
|
|
|
IV |
|
|
Public interest exception |
3,765 |
53 |
|
|
O |
|
|
Lot Reconfiguration |
|
|
|
|
|
|
I |
|
|
Base fee |
838 |
53 |
|
|
|
II |
|
|
Fee per adjustment over 2 |
124 |
N/A |
|
|
P |
|
|
Mining7,12 |
|
|
|
|
|
|
|
|
|
|
Cost recovery7,12 |
94 |
|
|
Q |
|
|
Planned Unit Development or Master Plan2 |
|
|
|
|
|
|
I |
|
|
Planned unit development |
3,142 |
53 |
|
|
|
II |
|
|
Planned unit development submitted concurrently with site plan review or subdivision application |
1,571 |
53 |
|
|
|
III |
|
|
Additional fee charged to applicant if hearing is requested for conditional use pursuant to Section 40.510.025(C)(4) |
1,490 |
N/A |
|
|
R |
|
|
Planning Director Review |
|
|
|
|
|
|
I |
|
|
Code interpretation |
733 |
53 |
|
|
|
II |
|
|
Nonconforming use determination |
3,066 |
53 |
|
|
|
III |
|
|
Similar use determination |
1,170 |
53 |
|
|
|
IV |
|
|
All other reviews5 |
2,650 |
53 |
|
|
S |
|
|
Plat Alterations – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
|
I |
|
|
Plat alteration |
3,468 |
94 |
|
|
|
II |
|
|
Additional fee charged to applicant if hearing is requested for plat alteration pursuant to Section 40.540.120(B) |
1,882 |
N/A |
|
|
|
III |
|
|
Plat declaration |
1,471 |
94 |
|
|
T |
|
|
Post Decision Review |
|
|
|
|
|
|
I |
|
|
Post decision review/Type I (includes deadline extensions requests for phased developments) |
2,103 |
94 |
|
|
|
II |
|
|
Post decision review/Type II |
3,436 |
94 |
|
|
|
III |
|
|
Post decision review/Type III |
5,965 |
94 |
|
|
U |
|
|
Pre-Application Conference – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
|
I |
|
|
Pre-application conference |
1,288 |
94 |
|
|
|
II |
|
|
Pre-application waiver request6 |
342 |
N/A |
|
|
V |
|
|
Renoticing3 |
|
|
|
|
|
|
I |
|
|
Base fee |
184 |
N/A |
|
|
W |
|
|
Reporting – Application and Permit Information7 |
|
|
|
|
|
|
|
|
|
Cost recovery – Applicant will be required to sign an agreement that they will pay billable hourly rate of the program. The applicant will be sent an itemized billing. |
Cost recovery7 |
N/A |
|
|
X |
|
|
SEPA Review |
|
|
|
|
|
|
I |
|
|
Project reviews – Any type |
1,528 |
53 |
|
|
|
II |
|
|
Non-projects (includes annual review applications) |
1,987 |
53 |
|
|
|
IV |
|
|
EIS review7 |
Cost recovery7 |
53 |
|
|
Y |
|
|
Sewer Waiver |
|
|
|
|
|
|
|
|
|
|
222 |
53 |
|
|
Z |
|
|
Shoreline Permit |
|
|
|
|
|
|
I |
|
|
Shoreline permit |
2,899 |
53 |
|
|
|
II |
|
|
Shoreline conditional use permit |
3,431 |
53 |
|
|
|
III |
|
|
Shoreline permit when considered with a variance request |
3,431 |
53 |
|
|
|
IV |
|
|
Shoreline exemption determination |
421 |
53 |
|
|
AA |
|
|
Short Plat |
|
|
|
|
|
|
|
|
|
|
4,802 |
94 |
|
|
AB |
|
|
Sign |
|
|
|
|
|
|
I |
|
|
Sign |
210 |
53 |
|
|
AC |
|
|
Site Plan Review – All Types – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
|
I |
|
|
Site plan review/Type I |
2,163 |
94 |
|
|
|
II |
|
|
Site plan review/Type II or commercial pad within a previously approved site plan which was not reviewed for the specific use or structure under the original site plan review |
5,589 |
94 |
|
|
|
III |
|
|
Unoccupied commercial and utility structures |
2,429 |
94 |
|
|
|
IV |
|
|
Binding site plan review – Stand alone is full price, if combined with PSR, this fee is reduced 50% |
3,927 |
94 |
|
|
|
V |
|
|
Fast lane process |
Site plan review fee plus 25% increase |
N/A |
|
|
|
VI |
|
|
60-day process |
Site plan review fee plus 25% increase |
N/A |
|
|
|
VII |
|
|
Review and Inspection by planner for final site plan process |
Cost recovery7 |
N/A |
|
|
AD |
|
|
Special Study Review7,12 |
|
|
|
|
|
|
|
|
|
|
Cost recovery7 |
N/A |
|
|
AE |
|
|
Special Valuation – Historic Preservation |
|
|
|
|
|
|
|
|
|
|
303 |
N/A |
|
|
AF |
|
|
Subdivision |
|
|
|
|
|
|
|
|
|
|
8,364 |
94 |
|
|
AG |
|
|
Temporary Use |
|
|
|
|
|
|
|
|
|
|
1,584 |
53 |
|
|
AH |
|
|
Variance |
|
|
|
|
|
|
I |
|
|
Administrative variance/Type I |
1,014 |
53 |
|
|
|
II |
|
|
Administrative variance/Type I – When considered with a development application – Planning portion only – See engineering fees for additional charges |
499 |
53 |
|
|
|
III |
|
|
Administrative variance/Type II |
1,780 |
53 |
|
|
|
IV |
|
|
Administrative variance/Type II – When considered with a development application – Planning portion only – See engineering fees for additional charges |
731 |
53 |
|
|
|
V |
|
|
Type III – Planning portion only – See Engineering fees for additional charges |
4,859 |
53 |
|
|
|
VI |
|
|
Type III – When considered with a development application – Planning portion only – See engineering fees for additional charges |
2,928 |
53 |
|
|
AI |
|
|
Wetland Protection8 |
|
|
|
|
|
|
I |
|
|
Predetermination or determination at time of application |
740 |
53 |
|
|
|
|
a |
|
With stormwater review |
855 |
53 |
|
|
|
II |
|
|
Wetland permit/Type I |
892 |
53 |
|
|
|
III |
|
|
Wetland permit/Types II and III |
1,928 |
53 |
|
|
|
IV |
|
|
Wetland permit/Type III reasonable use – Stand alone |
3,445 |
53 |
|
|
|
V |
|
|
Wetland delineation digital preparation |
273 |
53 |
|
|
|
VI |
|
|
Wetland only programmatic permit – Type I |
1,358 |
53 |
|
|
|
VII |
|
|
Wetland only programmatic permit – Type II |
2,552 |
53 |
|
|
|
VIII |
|
|
Wetland only programmatic permit – Re-authorization |
783 |
53 |
|
|
|
IX |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Type I |
1,222 |
53 |
|
|
|
X |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Type II |
2,297 |
53 |
|
|
|
XI |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Re-authorization |
705 |
53 |
|
|
|
XII |
|
|
Wetland protection covenant alteration |
|
53 |
|
|
|
|
a |
|
Type I review |
6682 |
53 |
|
|
|
|
b |
|
Type II review |
1,0122 |
53 |
|
|
|
|
c |
|
Type III review |
2,5672 |
53 |
|
|
|
XIII |
|
|
Stormwater/wetland review |
460 |
53 |
|
|
|
XIV |
|
|
Residential building permit review |
355 |
53 |
|
|
|
|
a |
|
Plus: field visit |
284 |
53 |
|
|
|
XV |
|
|
Final wetland permit – Type I |
1,467 |
53 |
|
|
|
XVI |
|
|
Final wetland permit – Type II |
2,158 |
53 |
|
|
|
XVII |
|
|
Mitigation plan revision |
367 |
53 |
|
|
|
XVIII |
|
|
Final stormwater wetland review |
345 |
53 |
|
|
|
|
a |
|
Request release of performance assurance |
504 |
53 |
|
|
|
|
b |
|
Request release of maintenance assurance |
504 |
53 |
|
|
|
XIX |
|
|
Monitoring inspection/permit10,11 |
|
53 |
|
|
|
|
a |
|
First year |
604 |
53 |
|
|
|
|
b |
|
Subsequent years |
316 |
53 |
|
|
|
|
c |
|
Each additional inspection |
230 |
53 |
|
|
AJ |
|
|
Zone Change |
|
|
|
|
|
|
|
|
|
|
5,403 |
94 |
|
|
AK |
|
|
Wineries |
|
|
|
|
|
|
|
|
|
Winery tasting room/events permit, Type I |
228 |
53 |
|
|
|
|
|
|
Winery tasting room/events permit, Type II |
2,284 |
53 |
Notes:
1 Boundary line adjustment does not include legal lot determination fee.
2 Conditional use permit fee reduced by fifty percent (50%) when submitted concurrently with a site plan review application. Planned unit development fee reduced by fifty percent (50%) when submitted concurrently with a site plan review and/or subdivision application. Covenant alteration fee reduced by fifty percent (50%) when submitted concurrently with another application of the same or greater type as the covenant alteration.
3 Written request for rescheduling and renoticing of the hearing will be accepted by the applicant if filed within fourteen (14) days of the original public hearing notice mailing. After this fourteen (14) day period only requests for a hearing continuance will be accepted.
4 No sign fee required.
5 Review and approval fee not required for single-family homes in multifamily zones, if submitted with land division application.
6 If accepted, paid at time of application for preliminary review. If denied, included with and paid at time of pre-application.
7 Cost recovery—Applicant will be required to sign an agreement that they will pay salary, benefits and overhead for staff or consultant’s fees required to complete the work. The applicant will be sent an itemized billing.
8 The responsible official may waive a part or all of the wetland permit fees for wetland and buffer enhancements, provided (1) the project is not intended to mitigate for wetland buffer impacts, and (2) the project is not the result of an enforcement action.
9 For review of projects authorized for overtime, an additional fifty percent (50%) will be added to the permit fees, as applicable.
10 Where both a habitat and wetland monitoring permit is required for the same parcel, the combined monitoring fee shall be reduced twenty-five percent (25%).
11 Habitat and wetland monitoring permit fees shall be paid prior to issuance of the building permit or final wetland permit. If the monitoring fees change after payment, but during the applicant’s monitoring period, the applicant shall pay or be refunded the difference.
12 Where a special study is required and the county lacks the expertise to review and comment on the study, the applicant shall pay for an independent consultant with the required expertise. The county shall contract with the independent consultant and require them to review the special study and make recommendation to the county as part of the preliminary plan review process.
(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1 (Exh. A) of Ord. 2002-03-12; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 6 of Ord. 2003-02-16; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Secs. 2 and 24 of Ord. 2004-06-11; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 2 of Ord. 2006-06-09; amended by Sec. 1 of Ord. 2006-09-13; amended by Sec. 1 of Ord. 2006-11-07; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 of Ord. 2008-06-02; amended by Sec. 1 (Att. A) of Ord. 2009-03-02; amended by Sec. 1 (Exh. A) of Ord. 2009-06-08; amended by Sec. 11 of Ord. 2009-10-19; amended by Sec. 1 (Att. A § 2) of Ord. 2009-12-01; amended by Sec. 6 of Ord. 2010-10-02; amended by Sec. 1 (Exh. A) of Ord. 2011-07-03)