6.110A.010 Preliminary/final planning and environmental review fees.
Fees for review activities included in Table 6.110A.010 shall be collected prior to processing the application:
|
Section |
Activity |
Fee |
||||
|
1 |
|
|
|
Appeals |
|
|
|
|
A |
|
|
Appeals to Hearings Examiner |
|
|
|
|
|
|
|
|
Planning portion only – See engineering fees for additional charges |
4,826 |
|
|
B |
|
|
Appeals to Board of Commissioners |
|
|
|
|
|
|
|
|
Fees paid to board of county commissioners |
716 |
|
2 |
|
|
|
Planning Fees9 |
|
|
|
|
A |
|
|
Address Change |
105 |
|
|
|
B |
|
|
Applicant Initiated Hold/Open Record for Hearing |
450 |
|
|
|
C |
|
|
Annual Reviews Initiated by Property Owners |
|
|
|
|
|
|
|
|
Fee includes rezones in conjunction with annual review |
8,113 |
|
|
D |
|
|
Boundary Line Adjustments1 |
|
|
|
|
|
I |
|
|
Base fee |
838 |
|
|
|
II |
|
|
Fee per adjustment over 2 |
124 |
|
|
E |
|
|
Columbia River Gorge |
4,667 |
|
|
|
F |
|
|
Conditional Use Permit2 |
|
|
|
|
|
I |
|
|
Minor – Includes day care centers, roadside stands, utility substations, kennels, veterinary clinics, additions of up to 10% of additional square feet beyond the existing building and structures, and similar uses as determined by the planning director2 |
7,442 |
|
|
|
II |
|
|
Major – All uses not indicated above2 |
7,442 |
|
|
G |
|
|
Continuance of Hearing3 |
|
|
|
|
|
|
|
|
For any hearing postponed or continued, as requested by the applicant after legal notice has been given; provided, that this requirement shall not apply (1) where the request is based upon new information presented at the hearing other than from the applicant or (2) when renoticing of the hearing is requested and approved.3 |
1,579 |
|
|
H |
|
|
Covenant Release – Full and Partial |
1,266 |
|
|
|
I |
|
|
Design Standard Review – Mixed Use/Commercial/ Performance Based Zoning |
Site plan review fee plus 300% increase |
|
|
|
J |
|
|
Forest Practice |
|
|
|
|
|
I |
|
|
Conversion option harvest plan (COHP) with approved current use timber management plan |
648 |
|
|
|
II |
|
|
COHP without approved current use timber management plan |
1,226 |
|
|
|
III |
|
|
Class IV G |
|
|
|
|
|
a |
|
Including SEPA |
3,166 |
|
|
|
|
b |
|
Without SEPA |
1,638 |
|
|
|
IV |
|
|
Open space/current use taxation |
1,963 |
|
|
|
V |
|
|
Type I, single-family dwelling moratorium waiver and field reviews of nonexempt Class I forest practices |
2,067 |
|
|
|
VI |
|
|
Type III, all other moratorium waivers |
2,838 |
|
|
|
VII |
|
|
Hazard tree removal determination, stand alone |
554 |
|
|
K |
|
|
Habitat Conservation |
|
|
|
|
|
I |
|
|
Clearing permit – Type I |
849 |
|
|
|
|
|
|
Clearing permit – Type II and III |
1,467 |
|
|
|
II |
|
|
Habitat predetermination |
625 |
|
|
|
III |
|
|
Stewardship plan |
849 |
|
|
|
IV |
|
|
Habitat only programmatic permit – Type I |
1,358 |
|
|
|
V |
|
|
Habitat only programmatic permit – Type II |
2,552 |
|
|
|
VI |
|
|
Habitat only programmatic permit – Re-authorization |
783 |
|
|
|
VII |
|
|
Habitat portion of combined habitat/wetland programmatic permit – Type I |
1,222 |
|
|
|
VIII |
|
|
Habitat portion of combined habitat/wetland programmatic permit – Type II |
2,297 |
|
|
|
IX |
|
|
Habitat portion of combined habitat/wetland programmatic permit – Re-authorization |
705 |
|
|
|
X |
|
|
Agricultural management plan |
0 |
|
|
|
XI |
|
|
Habitat permit Type III – Public interest exception |
3,445 |
|
|
|
XII |
|
|
Residential building permit review |
288 |
|
|
|
|
a |
|
Plus: field visit |
230 |
|
|
|
XIII |
|
|
Habitat ordinance applicability review for site plan or land division |
115 |
|
|
|
|
a |
|
Plus: field visit |
230 |
|
|
|
XIV |
|
|
Habitat conservation covenant alteration |
|
|
|
|
|
a |
|
Type I with any other review |
394 |
|
|
|
|
b |
|
Type I “stand alone” |
668 |
|
|
|
|
c |
|
Type II or III with any other review |
625 |
|
|
|
|
d |
|
Type II or III “stand alone” |
1,969 |
|
|
|
XV |
|
|
Monitoring inspection/permit10, 11 |
|
|
|
|
|
a |
|
First year |
604 |
|
|
|
|
b |
|
Subsequent years |
316 |
|
|
|
|
c |
|
Additional inspections |
230 |
|
|
L |
|
|
Home Business4 – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
I |
|
|
Minor Urban and Rural Type I Review without private road access |
106 |
|
|
|
II |
|
|
Minor Urban and Rural Type I Review with private road access/neighborhood agreement |
159 |
|
|
|
III |
|
|
Minor Urban and Rural Type II Review with private road access/no neighborhood agreement |
2,058 |
|
|
|
IV |
|
|
Major Urban Type II Review without private road access (base fee) |
2,696 |
|
|
|
|
a |
|
Plus: private road access |
532 |
|
|
|
V |
|
|
Major Rural Type II Review (base fee): |
2,696 |
|
|
|
|
a |
|
Plus: private road access |
532 |
|
|
|
|
b |
|
Plus: activity area screening |
532 |
|
|
M |
|
|
Land Use Compliance Fact Sheet |
53 |
|
|
|
N |
|
|
Legal Lot Determination |
|
|
|
|
|
I |
a |
|
Base fee |
1,193 |
|
|
|
|
b |
|
Fee per lot over 2 lots |
372 |
|
|
|
II |
|
|
For individual single-family or manufactured home |
527 |
|
|
|
III |
|
|
Innocent purchaser |
1,020 |
|
|
|
IV |
|
|
Public interest exception |
3,765 |
|
|
O |
|
|
Lot Reconfiguration |
|
|
|
|
|
I |
|
|
Base fee |
838 |
|
|
|
II |
|
|
Fee per adjustment over 2 |
124 |
|
|
P |
|
|
Mining7, 12 |
Cost recovery7, 12 |
|
|
|
Q |
|
|
Planned Unit Development or Master Plan2 |
|
|
|
|
|
I |
|
|
P.U.D. – Any type |
4,632 |
|
|
R |
|
|
Planning Director Review |
|
|
|
|
|
I |
|
|
Nonconforming use determination |
3,066 |
|
|
|
II |
|
|
Similar use determination |
1,170 |
|
|
|
III |
|
|
Temporary use – Type I |
1,584 |
|
|
|
IV |
|
|
All other reviews5 |
2,650 |
|
|
S |
|
|
Plat Alterations – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
I |
|
|
Plat alteration |
3,468 |
|
|
|
II |
|
|
Additional fee charged to applicant if hearing is requested pursuant to Section 40.540.120(B). |
1,882 |
|
|
T |
|
|
Post Decision Review |
|
|
|
|
|
I |
|
|
Post decision review/Type I (includes deadline extensions requests for phased developments) |
2,103 |
|
|
|
II |
|
|
Post decision review/Type II |
3,436 |
|
|
|
III |
|
|
Post decision review/Type III |
5,965 |
|
|
U |
|
|
Pre-Application Conference – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
I |
|
|
Pre-application conference |
1,288 |
|
|
|
II |
|
|
Pre-application waiver request6 |
694 |
|
|
V |
|
|
Renoticing3 |
|
|
|
|
|
I |
|
|
Base fee |
184 |
|
|
W |
|
|
Reporting – Application and Permit Information7 |
|
|
|
|
|
|
|
|
Cost recovery – Applicant will be required to sign an agreement that they will pay the billable hourly rate of the program. The applicant will be sent an itemized billing. |
Cost recovery7 |
|
|
X |
|
|
SEPA Review |
|
|
|
|
|
I |
|
|
Project reviews – any type |
1,528 |
|
|
|
II |
|
|
Non-projects (includes annual review applications) |
1,987 |
|
|
|
III |
|
|
Appeals |
1,493 |
|
|
|
IV |
|
|
EIS review7 |
Cost recovery7 |
|
|
Y |
|
|
Sewer Waiver |
990 |
|
|
|
Z |
|
|
Shoreline Permit |
|
|
|
|
|
I |
|
|
Shoreline permit |
2,899 |
|
|
|
II |
|
|
Shoreline conditional use permit |
3,431 |
|
|
|
III |
|
|
Shoreline permit when considered with a variance request |
3,431 |
|
|
|
IV |
|
|
Shoreline exemption determination |
421 |
|
|
AA |
|
|
Short Plat |
4,802 |
|
|
|
AB |
|
|
Sign |
|
|
|
|
|
I |
|
|
Sign |
210 |
|
|
AC |
|
|
Site Plan Review – Fast Lane Permitting |
|
|
|
|
|
I |
|
|
Program for reduced timelines for site plan review |
Site plan review fee plus 50% increase |
|
|
AD |
|
|
Site Plan Review – Preliminary All Types – Planning Portion Only – See Engineering Fees for Additional Charges |
|
|
|
|
|
I |
|
|
Site plan review/Type I |
2,163 |
|
|
|
II |
|
|
Site plan review/Type II or commercial pad within a previously approved site plan which was not reviewed for the specific use or structure under the original site plan review |
5,589 |
|
|
|
III |
|
|
Unoccupied commercial and utility structures |
2,429 |
|
|
|
IV |
|
|
Binding site plan review – Stand alone is full price; if combined with PSR, this fee is reduced 50% |
3,927 |
|
|
AE |
|
|
Site Plan Review – Final Inspection by Planner7 |
Cost recovery7 |
|
|
|
AF |
|
|
Special Study Review7, 12 |
Cost recovery7 |
|
|
|
AG |
|
|
Special Valuation – Historic Preservation |
303 |
|
|
|
AH |
|
|
Subdivision |
8,364 |
|
|
|
AI |
|
|
Variance |
|
|
|
|
|
I |
|
|
Administrative variance/Type I |
1,561 |
|
|
|
II |
|
|
Administrative variance/Type I – When considered with a development application – Planning portion only – See engineering fees for additional charges |
1,611 |
|
|
|
III |
|
|
Administrative variance/Type II |
3,348 |
|
|
|
IV |
|
|
Administrative variance/Type II – When considered with a development application – Planning portion only – See engineering fees for additional charges |
1,910 |
|
|
|
V |
|
|
Type III – Planning portion only – See engineering fees for additional charges |
6,531 |
|
|
|
VI |
|
|
Type III – When considered with a development application – Planning portion only – See engineering fees for additional charges |
5,564 |
|
|
AJ |
|
|
Wetland Protection8 |
|
|
|
|
|
I |
|
|
Predetermination |
740 |
|
|
|
|
a |
|
With stormwater review |
855 |
|
|
|
II |
|
|
Wetland permit/Type I |
892 |
|
|
|
III |
|
|
Wetland permit/Type II and III |
1,928 |
|
|
|
IV |
|
|
Wetland permit/Type III reasonable use – Stand alone |
3,445 |
|
|
|
V |
|
|
Wetland delineation digital preparation |
273 |
|
|
|
VI |
|
|
Wetland only programmatic permit – Type I |
1,358 |
|
|
|
VII |
|
|
Wetland only programmatic permit – Type II |
2,552 |
|
|
|
VIII |
|
|
Wetland only programmatic permit – Re-authorization |
783 |
|
|
|
IX |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Type I |
1,222 |
|
|
|
X |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Type II |
2,297 |
|
|
|
XI |
|
|
Wetland portion of combined wetland/habitat programmatic permit – Re-authorization |
705 |
|
|
|
XII |
|
|
Wetland protection covenant alteration |
|
|
|
|
|
a |
|
Type I with any other review |
394 |