6.110A.020 Development engineering plan review fees.
Fees for those final construction plan review activities included in Table 6.110A.020 shall be collected prior to processing the application:
|
Section |
Activity |
Fee |
Issuance Fee |
||||
|---|---|---|---|---|---|---|---|
|
1 |
|
|
|
Preliminary Engineering Fees2 |
|
|
|
|
|
A |
|
|
Appeals to Hearing Examiner3 |
414 |
53 |
|
|
|
B |
|
|
Columbia River Gorge10 |
Hourly rate; initial deposit $2009 |
53 |
|
|
|
C |
|
|
Conditional Use Permit4 |
|
|
|
|
|
|
I |
|
|
Stormwater |
1,554 |
5311 |
|
|
|
II |
|
|
Transportation |
1,554 |
5311 |
|
|
D |
|
|
Continuance of Hearing – Applicant Initiated for Stormwater and/or Transportation Issues (in addition to planning fee) |
912 |
n/a |
|
|
|
E |
|
|
Critical Aquifer Recharge Area Permit (CARA) – Type 1, 2, and 3 Site Plan Review |
1,378 |
53 |
|
|
|
F |
|
|
Floodplain Inquiry |
291 |
53 |
|
|
|
G |
|
|
Geological Hazard |
|
|
|
|
|
|
I |
|
|
Predetermination review |
303 |
53 |
|
|
|
II |
|
|
Predetermination decision |
554 |
53 |
|
|
|
III |
|
|
Hazard area study review |
483 |
53 |
|
|
H |
|
|
Home Business – All Major and Minor Types3,10 |
Hourly rate; initial deposit $2009 |
53 |
|
|
|
I |
|
|
Legal Lot Determination10 |
Hourly rate; initial deposit $2009 |
53 |
|
|
|
J |
|
|
Planned Unit Development or Master Plan3,4 |
|
|
|
|
|
|
I |
|
|
Stormwater |
756 |
5311 |
|
|
|
II |
|
|
Transportation |
756 |
5311 |
|
|
K |
|
|
Plat Alterations3,10 |
Hourly rate; initial deposit $2009 |
53 |
|
|
|
L |
|
|
Post Decision Reviews (Type 1, 2, and 3)3 |
|
|
|
|
|
|
I |
|
|
Stormwater |
530 |
5311 |
|
|
|
II |
|
|
Transportation |
530 |
5311 |
|
|
|
III |
|
|
Major change to technical design |
1/2 regular fee |
53 |
|
|
M |
|
|
Pre-Application Conference (All Types)3 |
|
|
|
|
|
|
I |
|
|
Pre-application conference |
1,405 |
94 |
|
|
|
II |
|
|
Pre-application waiver request |
38 |
n/a |
|
|
N |
|
|
Road Modification – Transportation7 |
|
|
|
|
|
|
I |
|
|
Technical road modification |
1,200 |
53 |
|
|
|
II |
|
|
Major road modification |
1,559 |
53 |
|
|
|
III |
|
|
Minor road deviation – Stand alone only8 |
250 |
53 |
|
|
O |
|
|
Short Plat |
|
|
|
|
|
|
I |
|
|
Stormwater plan |
1,054 |
9411 |
|
|
|
II |
|
|
Downstream conveyance and disposal report review |
1/2 stormwater plan |
9411 |
|
|
|
III |
|
|
Transportation |
1,054 |
9411 |
|
|
P |
|
|
Site Plan |
|
|
|
|
|
|
I |
|
|
Stormwater plan review – All types |
1,280 |
9411 |
|
|
|
II |
|
|
Transportation plan review – All types |
1,463 |
9411 |
|
|
|
III |
|
|
Unoccupied commercial and utility structures5 |
601 |
94 |
|
|
|
IV |
|
|
Highway 99 sub-area reviews |
Standard preliminary engineering fees plus 25% |
n/a |
|
|
Q |
|
|
Site Plan Review – Fast Lane Permitting |
|
|
|
|
|
|
I |
|
|
Program for reduced timelines for site plan review |
Site plan review fee plus 25% |
n/a |
|
|
R |
|
|
60-Day Review |
Standard preliminary and final engineering fees plus 25% |
n/a |
|
|
|
S |
|
|
Subdivision (all sizes) |
|
|
|
|
|
|
I |
|
|
Stormwater plan review |
1,792 |
9411 |
|
|
|
II |
|
|
Downstream conveyance and disposal report review |
1/2 stormwater plan |
9411 |
|
|
|
III |
|
|
Transportation plan review |
1,965 |
9411 |
|
|
T |
|
|
Variance |
|
|
|
|
|
|
I |
|
|
Stormwater |
1,207 |
53 |
|
|
|
II |
|
|
Administrative variance Type I – When considered with a development application3 |
211 |
53 |
|
|
|
III |
|
|
Administrative variance Type II – When considered with a development application3 |
281 |
53 |
|
|
|
IV |
|
|
Administrative variance Type III3 |
915 |
53 |
|
|
|
V |
|
|
Type III – When considered with a development application3 |
563 |
53 |
|
2 |
|
|
|
Final Engineering Fees |
|
|
|
|
|
A |
|
|
Drainage Project |
|
|
|
|
|
|
I |
|
|
Stormwater plan review |
828 |
94 |
|
|
|
II |
|
|
Fees resulting from working without permit |
Double regular fee |
94 |
|
|
B |
|
|
Final Plat Review |
|
|
|
|
|
|
I |
|
|
Short plat |
1,733 |
94 |
|
|
|
II |
|
|
Subdivision |
2,437 |
94 |
|
|
|
III |
|
|
Digital plat submissions |
|
|
|
|
|
|
a |
|
County digital plat preparation – Base fee |
165 |
n/a |
|
|
|
|
b |
|
County digital plat preparation – Per lot |
5 |
n/a |
|
|
C |
|
|
Final Site Plan Review |
|
|
|
|
|
|
I |
|
|
Type I |
2,338 |
94 |
|
|
|
II |
|
|
Other Types |
3,071 |
94 |
|
|
D |
|
|
Floodplain Review |
1,370 |
53 |
|
|
|
E |
|
|
Grading Permit – Plan Check |
|
|
|
|
|
|
I |
|
|
100 c.y. or less |
216 |
53 |
|
|
|
II |
|
|
Over 100 to 10,000 c.y. |
718 |
94 |
|
|
|
III |
|
|
Over 10,000 c.y. |
1,739 |
94 |
|
|
F |
|
|
Post Plan Approval – Plan Revisions |
|
|
|
|
|
|
|
|
|
Change design after construction approval |
1/2 regular fee |
94 |
|
|
G |
|
|
Roof Drain Review for SFR |
345 |
n/a |
|
|
|
H |
|
|
Short Plat |
|
|
|
|
|
|
I |
|
|
Stormwater plan review |
|
|
|
|
|
|
a |
|
Final stormwater plan review |
1,222 |
9411 |
|
|
|
|
b |
|
Downstream conveyance and disposal report review |
1/2 stormwater plan |
9411 |
|
|
|
II |
|
|
Final transportation plan review |
1,222 |
9411 |
|
|
I |
|
|
Site Plan |
|
|
|
|
|
|
I |
|
|
Final engineering plans – Transportation and stormwater review (maximum $1,500 for private roads not submitted as part of another development application) |
|
|
|
|
|
|
a |
|
Base fee – Small projects (less than 1.0 acre of impervious surface6) |
2,189 |
94 |
|
|
|
|
|
|
Per sq. ft. fee – Small projects (less than 1.0 acre of impervious surface6) |
0.0706 |
n/a |
|
|
|
|
b |
|
Base fee – Medium projects (1.0 acre to 4.99 acres of impervious surface6) |
6,570 |
94 |
|
|
|
|
|
|
Per sq. ft. fee – Medium projects (1.0 acre to 4.99 acres of impervious surface6) |
0.0242 |
n/a |
|
|
|
|
c |
|
Base fee – Large projects (5.0 acres or greater of impervious surface6) |
10,947 |
94 |
|
|
|
|
|
|
Per sq. ft. fee – Large projects (5.0 acres or greater of impervious surface6) |
0.0131 |
n/a |
|
|
|
II |
|
|
Unoccupied commercial and utility structures – Base fee |
1,863 |
94 |
|
|
|
III |
|
|
Tenant improvements |
303 |
53 |
|
|
J |
|
|
Subdivision (all sizes) |
|
|
|
|
|
|
I |
|
|
Stormwater plan review |
|
|
|
|
|
|
a |
|
Final stormwater plan review |
2,385 |
9411 |
|
|
|
|
b |
|
Downstream conveyance and disposal report review |
1/2 stormwater plan |
9411 |
|
|
|
II |
|
|
Final transportation plan review |
2,460 |
9411 |
|
|
K |
|
|
Additional Final Engineering Plan Reviews – Fee Required for Each Review After Third Submittal |
745 |
94 |
|
Notes:
1 Cost recovery—Applicant is required to pay consultant’s fees to review specialized designs, including but not limited to structural walls and bridges. County will send the consultant’s bill to the applicant; total amount must be paid before the project is approved or finalized.
2 The preliminary engineering fees section was previously part of Table 6.110A.010.
3 Previously combined with planning fees.
4 Fee is in addition to stormwater and transportation fees associated with a land division and/or site plan.
5 Includes stormwater and transportation fees.
6 “Impervious surface” is defined in Section 40.385.010(D).
7 Fees reflect changes to Section 40.550.010, Modifications to Road Standards, per Ordinance 2011-01-01.
8 There is no fee for minor road deviations requested at the same time as a related land use or engineering application. This minor road deviation stand alone fee applies to applications not associated with a land use or engineering permit.
9 The hourly rate fee is calculated using a standard annual hourly rate schedule (by job classification) multiplied by actual staff hours spent on the project. The hourly rate includes salary, benefits, and program overhead. County will send a final itemized billing, less any initial deposit, that must be paid before the project is approved or finalized.
10 This fee only applies when development engineering review is requested by community development.
11 When the application requires both a transportation and stormwater review, only one (1) issuance fee is required.
(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1(Exh. A) of Ord. 2002-03-12; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Sec. 24 of Ord. 2004-06-11; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-06-08; amended by Sec. 1 of Ord. 2011-01-20; amended by Sec. 3 (Exh. C) of Ord. 2011-07-03)