6.110A.030 Development inspection fees.
Fees for those development inspection activities contained in Table 6.110A.030 shall be collected prior to inspection:
|
Section |
Activity |
Fee |
Issuance Fee |
||||
|---|---|---|---|---|---|---|---|
|
1 |
|
|
|
Engineering Inspection Fees |
|
|
|
|
|
A |
|
|
Critical Aquifer Recharge Area Permit (CARA) Category I Only |
|
|
|
|
|
|
|
|
|
All types site plan inspection |
754 |
53 |
|
|
B |
|
|
Drainage Project |
|
|
|
|
|
|
|
|
|
Stormwater inspection fee |
1,400 |
94 |
|
|
C |
|
|
Grading Permit – Inspection |
|
|
|
|
|
|
I |
|
|
100 c.y. or less |
697 |
94 |
|
|
|
II |
|
|
Over 100 to 10,000 c.y. |
1,386 |
94 |
|
|
|
III |
|
|
Over 10,000 c.y. |
2,640 |
94 |
|
|
D |
|
|
Grading Permit – Surcharge |
|
|
|
|
|
|
I |
|
|
Activity lasts 6 to 12 months beyond issuance date |
16% |
n/a |
|
|
|
II |
|
|
Activity lasts 12 or more months beyond issuance date |
32% |
n/a |
|
|
|
III |
|
|
Activity lasts months beyond permit time, surcharge in A or B above as applicable, plus |
8% |
n/a |
|
|
|
IV |
|
|
Work without permit |
Double fee |
n/a |
|
|
E |
|
|
Inspection – Stormwater and Transportation |
|
|
|
|
|
|
|
|
|
Inspection per hour after normal work hours and any reinspection (regardless of time of day) |
Hourly rate1 |
n/a |
|
|
F |
|
|
Shoreline Inspection |
665 |
53 |
|
|
|
G |
|
|
Short Plat |
|
|
|
|
|
|
I |
|
|
Inspection – Stormwater |
2,772 |
944 |
|
|
|
II |
|
|
Inspection – Transportation |
2,772 |
944 |
|
|
|
III |
|
|
Rural driveways |
348 |
53 |
|
|
H |
|
|
Site Plan |
|
|
|
|
|
|
|
|
|
Transportation and stormwater |
|
|
|
|
|
I |
a |
|
Base fee – Small projects (less than 1.0 acre of impervious surface2) |
3,253 |
94 |
|
|
|
|
b |
|
Per sq. ft. fee – Small projects (less than 1.0 acre of impervious surface2) |
0.0204 |
n/a |
|
|
|
II |
a |
|
Base fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2) |
5,312 |
94 |
|
|
|
|
b |
|
Per sq. ft. fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2) |
0.01 |
n/a |
|
|
|
III |
a |
|
Base fee – Large projects (5.0 acres or greater of impervious surface2) |
9,367 |
94 |
|
|
|
|
b |
|
Per sq. ft. fee – Large projects (5.0 acres or greater of impervious surface2) |
0.0039 |
n/a |
|
|
|
IV |
|
|
Unoccupied commercial and utility structures – Base fee |
1,097 |
94 |
|
|
|
V |
|
|
Tenant improvements |
911 |
94 |
|
|
|
VI |
|
|
Final site plan inspection |
1,097 |
53 |
|
|
I |
|
|
Subdivision (all sizes) |
|
|
|
|
|
|
I |
|
|
Stormwater |
|
|
|
|
|
|
a |
|
Base fee |
2,466 |
944 |
|
|
|
|
b |
|
Per lot fee |
140 |
n/a |
|
|
|
II |
|
|
Transportation |
|
|
|
|
|
|
a |
|
Base fee |
4,667 |
944 |
|
|
|
|
b |
|
Per lot fee |
39 |
n/a |
|
|
J |
|
|
System Integrity Review |
|
|
|
|
|
|
I |
|
|
Maintenance warranty |
1,164 |
53 |
|
|
|
II |
|
|
Performance bond3 |
Hourly rate; initial deposit $2001 |
53 |
|
|
|
III |
|
|
Stormwater system failure – Engineering review |
1,552 |
94 |
Notes:
1 The hourly rate fee is calculated using a standard annual hourly rate schedule (by job classification) multiplied by actual staff hours spent on the project. The hourly rate includes salary, benefits, and program overhead. Inspection time outside normal work hours is calculated at one and one-half (1.5) times the standard hourly rate. County will send a final itemized billing, less any initial deposit, that must be paid before the project is approved or finalized.
2 “Impervious surface” is defined in Sections 40.100.070 and 40.385.010(D).
3 Fee applies to requests to use a performance bond (or similar legal instrument) to delay constructing public facilities or landscaping, The fee also applies when obtaining traffic impact fee credits, under certain circumstances. Fee is for staff costs for activities including, but not limited to, negotiating the terms of the bond, reviewing cost estimates and legal documents, and releasing the bond when completed. Field inspection time is not included in this fee.
4 When the application requires both a transportation and stormwater inspection, only one (1) issuance fee is required.
(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-07-06; amended by Sec. 4 (Exh. D) of Ord. 2011-07-03)