6.110A.030 Development inspection fees.

Fees for those development inspection activities contained in Table 6.110A.030 shall be collected prior to inspection:

Table 6.110A.030—Development Inspection Fees 

Section

Activity

Fee

Issuance Fee

1

 

 

 

Engineering Inspection Fees

 

 

 

A

 

 

Critical Aquifer Recharge Area Permit (CARA) Category I Only

 

 

 

 

 

 

 

All types site plan inspection

754

53

 

B

 

 

Drainage Project

 

 

 

 

 

 

 

Stormwater inspection fee

1,400

94

 

C

 

 

Grading Permit Inspection

 

 

 

 

I

 

 

100 c.y. or less

697

94

 

 

II

 

 

Over 100 to 10,000 c.y.

1,386

94

 

 

III

 

 

Over 10,000 c.y.

2,640

94

 

D

 

 

Grading Permit Surcharge

 

 

 

 

I

 

 

Activity lasts 6 to 12 months beyond issuance date

16%

n/a

 

 

II

 

 

Activity lasts 12 or more months beyond issuance date

32%

n/a

 

 

III

 

 

Activity lasts months beyond permit time, surcharge in A or B above as applicable, plus

8%

n/a

 

 

IV

 

 

Work without permit

Double fee

n/a

 

E

 

 

Inspection Stormwater and Transportation

 

 

 

 

 

 

 

Inspection per hour after normal work hours and any reinspection (regardless of time of day)

Hourly rate1

n/a

 

F

 

 

Shoreline Inspection

665

53

 

G

 

 

Short Plat

 

 

 

 

I

 

 

Inspection – Stormwater

2,772

944

 

 

II

 

 

Inspection – Transportation

2,772

944

 

 

III

 

 

Rural driveways

348

53

 

H

 

 

Site Plan

 

 

 

 

 

 

 

Transportation and stormwater

 

 

 

 

I

a

 

Base fee – Small projects (less than 1.0 acre of impervious surface2)

3,253

94

 

 

 

b

 

Per sq. ft. fee – Small projects (less than 1.0 acre of impervious surface2)

0.0204

n/a

 

 

II

a

 

Base fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2)

5,312

94

 

 

 

b

 

Per sq. ft. fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2)

0.01

n/a

 

 

III

a

 

Base fee – Large projects (5.0 acres or greater of impervious surface2)

9,367

94

 

 

 

b

 

Per sq. ft. fee – Large projects (5.0 acres or greater of impervious surface2)

0.0039

n/a

 

 

IV

 

 

Unoccupied commercial and utility structures – Base fee

1,097

94

 

 

V

 

 

Tenant improvements

911

94

 

 

VI

 

 

Final site plan inspection

1,097

53

 

I

 

 

Subdivision (all sizes)

 

 

 

 

I

 

 

Stormwater

 

 

 

 

 

a

 

Base fee

2,466

944

 

 

 

b

 

Per lot fee

140

n/a

 

 

II

 

 

Transportation

 

 

 

 

 

a

 

Base fee

4,667

944

 

 

 

b

 

Per lot fee

39

n/a

 

J

 

 

System Integrity Review

 

 

 

 

I

 

 

Maintenance warranty

1,164

53

 

 

II

 

 

Performance bond3

Hourly rate; initial deposit $2001

53

 

 

III

 

 

Stormwater system failure – Engineering review

1,552

94

Notes:

1    The hourly rate fee is calculated using a standard annual hourly rate schedule (by job classification) multiplied by actual staff hours spent on the project. The hourly rate includes salary, benefits, and program overhead. Inspection time outside normal work hours is calculated at one and one-half (1.5) times the standard hourly rate. County will send a final itemized billing, less any initial deposit, that must be paid before the project is approved or finalized.

2    “Impervious surface” is defined in Sections 40.100.070 and 40.385.010(D).

3    Fee applies to requests to use a performance bond (or similar legal instrument) to delay constructing public facilities or landscaping, The fee also applies when obtaining traffic impact fee credits, under certain circumstances. Fee is for staff costs for activities including, but not limited to, negotiating the terms of the bond, reviewing cost estimates and legal documents, and releasing the bond when completed. Field inspection time is not included in this fee.

4    When the application requires both a transportation and stormwater inspection, only one (1) issuance fee is required.

(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-07-06; amended by Sec. 4 (Exh. D) of Ord. 2011-07-03)