6.110A.030 Development inspection fees.

Fees for those development inspection activities contained in Table 6.110A.030 shall be collected prior to inspection:

Table 6.110A.030—Development Inspection Fees 

Section

Activity

Fee

1

 

 

 

Engineering Inspection Fees

 

 

A

 

 

Critical Aquifer Recharge Area Permit (CARA) Category I Only

 

 

 

 

 

 

All types site plan inspection

754

 

B

 

 

Drainage Project

 

 

 

 

 

 

Stormwater inspection fee

1,400

 

C

 

 

Grading Permit Inspection

 

 

 

I

 

 

100 c.y. or less

697

 

 

II

 

 

over 100 to 10,000 c.y.

1,386

 

 

III

 

 

over 10,000 c.y.

2,640

 

D

 

 

Grading Permit Surcharge

 

 

 

I

 

 

Activity lasts 6 to 12 months beyond issuance date

16%

 

 

II

 

 

Activity lasts 12 or more months beyond issuance date

32%

 

 

III

 

 

Activity lasts months beyond permit time, surcharge in A or B above as applicable, plus

8%

 

 

IV

 

 

Work without permit

Double fee

 

E

 

 

Inspection Stormwater and Transportation

 

 

 

 

 

 

Inspection per hour after normal work hours and any reinspection (regardless of time of day)1

Actual salary and benefits for employees performing work plus overhead rate

 

F

 

 

Shoreline Inspection

665

 

G

 

 

Short Plat

 

 

 

I

 

 

Inspection Stormwater

2,772

 

 

II

 

 

Inspection Transportation

2,772

 

 

III

 

 

Rural driveways

348

 

H

 

 

Site Plan

 

 

 

 

 

 

Transportation and stormwater

 

 

 

I

a

 

Base fee – Small projects (less than 1.0 acre of impervious surface2)

3,253

 

 

 

b

 

Per sq. ft. fee – Small projects (less than 1.0 acre of impervious surface2)

0.0204

 

 

II

a

 

Base fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2)

5,312

 

 

 

b

 

Per sq. ft. fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2)

0.0100

 

 

III

a

 

Base fee – Large projects (5.0 acres or greater of impervious surface2)

9,367

 

 

 

b

 

Per sq. ft. fee – Large projects (5.0 acres or greater of impervious surface2)

0.0039

 

 

IV

 

 

Unoccupied commercial and utility structures Base fee

1,097

 

 

V

 

 

Tenant improvements

911

 

 

VI

 

 

Final site plan inspection

1,097

 

I

 

 

Subdivision (all sizes)

 

 

 

 

 

 

Stormwater

 

 

 

I

 

 

Base fee

2,466

 

 

II

 

 

Per lot fee

140

 

 

 

 

 

Transportation

 

 

 

III

 

 

Base fee

4,667

 

 

IV

 

 

Per lot fee

39

 

J

 

 

System Integrity Review

 

 

 

 

 

 

Maintenance warranty

1,164

 

 

 

 

 

Stormwater system failure Engineering review

1,552

Notes:

1    Cost recovery—Contractor will be required to sign an agreement that they will pay actual costs of the inspection. Actual costs will be salary and benefits for employees performing work plus overhead rate. The contractor will be sent an itemized billing.

2    Impervious surface is defined in Sections 40.100.070 and 40.385.010(D), Clark County Code.

(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-07-06)