6.110A.030 Development inspection fees.
Fees for those development inspection activities contained in Table 6.110A.030 shall be collected prior to inspection:
|
Section |
Activity |
Fee |
||||
|
1 |
|
|
|
Engineering Inspection Fees |
|
|
|
|
A |
|
|
Critical Aquifer Recharge Area Permit (CARA) Category I Only |
|
|
|
|
|
|
|
|
All types site plan inspection |
754 |
|
|
B |
|
|
Drainage Project |
|
|
|
|
|
|
|
|
Stormwater inspection fee |
1,400 |
|
|
C |
|
|
Grading Permit – Inspection |
|
|
|
|
|
I |
|
|
100 c.y. or less |
697 |
|
|
|
II |
|
|
over 100 to 10,000 c.y. |
1,386 |
|
|
|
III |
|
|
over 10,000 c.y. |
2,640 |
|
|
D |
|
|
Grading Permit – Surcharge |
|
|
|
|
|
I |
|
|
Activity lasts 6 to 12 months beyond issuance date |
16% |
|
|
|
II |
|
|
Activity lasts 12 or more months beyond issuance date |
32% |
|
|
|
III |
|
|
Activity lasts months beyond permit time, surcharge in A or B above as applicable, plus |
8% |
|
|
|
IV |
|
|
Work without permit |
Double fee |
|
|
E |
|
|
Inspection – Stormwater and Transportation |
|
|
|
|
|
|
|
|
Inspection per hour after normal work hours and any reinspection (regardless of time of day)1 |
Actual salary and benefits for employees performing work plus overhead rate |
|
|
F |
|
|
Shoreline Inspection |
665 |
|
|
|
G |
|
|
Short Plat |
|
|
|
|
|
I |
|
|
Inspection – Stormwater |
2,772 |
|
|
|
II |
|
|
Inspection – Transportation |
2,772 |
|
|
|
III |
|
|
Rural driveways |
348 |
|
|
H |
|
|
Site Plan |
|
|
|
|
|
|
|
|
Transportation and stormwater |
|
|
|
|
I |
a |
|
Base fee – Small projects (less than 1.0 acre of impervious surface2) |
3,253 |
|
|
|
|
b |
|
Per sq. ft. fee – Small projects (less than 1.0 acre of impervious surface2) |
0.0204 |
|
|
|
II |
a |
|
Base fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2) |
5,312 |
|
|
|
|
b |
|
Per sq. ft. fee – Medium projects (1.0 acre to 4.99 acres of impervious surface2) |
0.0100 |
|
|
|
III |
a |
|
Base fee – Large projects (5.0 acres or greater of impervious surface2) |
9,367 |
|
|
|
|
b |
|
Per sq. ft. fee – Large projects (5.0 acres or greater of impervious surface2) |
0.0039 |
|
|
|
IV |
|
|
Unoccupied commercial and utility structures – Base fee |
1,097 |
|
|
|
V |
|
|
Tenant improvements |
911 |
|
|
|
VI |
|
|
Final site plan inspection |
1,097 |
|
|
I |
|
|
Subdivision (all sizes) |
|
|
|
|
|
|
|
|
Stormwater |
|
|
|
|
I |
|
|
Base fee |
2,466 |
|
|
|
II |
|
|
Per lot fee |
140 |
|
|
|
|
|
|
Transportation |
|
|
|
|
III |
|
|
Base fee |
4,667 |
|
|
|
IV |
|
|
Per lot fee |
39 |
|
|
J |
|
|
System Integrity Review |
|
|
|
|
|
|
|
|
Maintenance warranty |
1,164 |
|
|
|
|
|
|
Stormwater system failure – Engineering review |
1,552 |
Notes:
1 Cost recovery—Contractor will be required to sign an agreement that they will pay actual costs of the inspection. Actual costs will be salary and benefits for employees performing work plus overhead rate. The contractor will be sent an itemized billing.
2 Impervious surface is defined in Sections 40.100.070 and 40.385.010(D), Clark County Code.
(Sec. 3 (Exh. A) of Ord. 2001-12-09; amended by Sec. 1 (Exh. A) of Ord. 2002-11-07; amended by Sec. 1 (Exh. A) of Ord. 2004-02-09; amended by Ord. 2004-12-02; amended by Ord. 2005-12-01; amended by Sec. 2 of Ord. 2006-05-27; amended by Sec. 1 of Ord. 2007-04-17; amended by Sec. 1 of Ord. 2007-11-13; amended by Sec. 1 of Ord. 2008-02-01; amended by Sec. 1 (Exh. A) of Ord. 2009-07-06)