Chapter 14.10
ENVIRONMENTAL IMPACT STATEMENT (EIS)
Sections:
14.10.010 Purpose of this chapter--Adoption by reference.
14.10.020 Preparation of EIS--Additional considerations.
14.10.030 Additional elements to be covered in an EIS.
14.10.010 Purpose of this chapter--Adoption by reference.
This chapter contains the rules for preparing environmental impact statements. The city adopts the following sections by reference, as supplemented by this chapter:
WAC 197-11-400 Purpose of EIS.
402 General requirements.
405 EIS types.
406 EIS timing.
408 Scoping.
410 Expanded scoping.
420 EIS preparation.
425 Style and size.
430 Format.
435 Cover letter or memo.
440 EIS contents.
442 Contents of EIS on nonproject proposals.
443 EIS contents when prior nonproject EIS.
444 Elements of the environment.
448 Relationship of EIS to other considerations.
450 Cost-benefit analysis.
455 Issuance of DEIS.
460 Issuance of FEIS.
(Ord. 778(part), 1984).
14.10.020 Preparation of EIS--Additional Considerations.
A. Preparation of draft and final EIS’s (DEIS and FEIS) and draft and final supplemental EIS’s (SEIS) is the responsibility of the responsible official. Before the city issues an EIS, the responsible official shall be satisfied that it complies with this ordinance and WAC Chapter 197-11.
B. The DEIS and FEIS or draft and final SEIS shall be prepared by city staff, the applicant, or by a consultant selected by the city or the applicant. If the responsible official requires an EIS for a proposal and determines that someone other than the city will prepare the EIS, the responsible official shall notify the applicant immediately after the completion of the threshold determination. The responsible official shall also notify the applicant of the city’s procedure for EIS preparation, including approval of the DEIS and FEIS prior to distribution.
C. The city may require an applicant to provide information the city does not possess, including specific investigations. However, the applicant is not required to supply information that is not required under this title or that is being requested from another agency. This does not apply to information the city may request under another ordinance or statute.) (Ord. 778(part), 1984).
14.10.030 Additional elements to be covered in an EIS.
The following additional elements are part of the environment for the purpose of EIS content, but do not add to the criteria for threshold determinations or perform any other function or purpose under this title.
A. Economy;
B. Social policy analysis;
C. Cost-benefit analysis. (Ord. 778(part), 1984).