Chapter 9.25
GAS EXPLORATION AND DEVELOPMENT
Sections:
9.25.010 General provisions.
9.25.010 General provisions.
A. Setbacks.
1. The operator will construct drill pads at least 500 feet and compressor stations at least 1,500 feet from any recorded private property line.
2. A variance may be granted from the setback requirement if the operator obtains written consent of the landowner/landowners with the adjoining property line and has obtained approval from the Denali Borough assembly following at least one public hearing. [Ord. 08-07 § 2; Ord. 05-21 § 2.]