GLEN COVE WATER & WASTEWATER NEEDS

A Summary of the Approach and Assumptions Used

Introduction

The purpose of the water and wastewater infrastructure analysis which follows is to assist the Joint Growth Management Committee in identifying a "preferred "growth alternative for the Glen Cove Special Study Area. The analysis provides estimates of the demand created and the cost to supply water and wastewater services to the two expanded UGA alternatives for Glen Cove (i.e.. Alternative #2 - "Community Serving UGA", and Alternative #3 - "County-wide/Regional Retail & Manufacturing UGA"). The estimates are for general planning rather than engineering purposes. Nevertheless, the analysis provides a credible range of estimated needs and costs upon which to base long range planning decisions.

Water

Determining Water Needs

Water needs for the two expanded UGA alternatives were calculated for each of the different land use designations anticipated (i.e., single family and multi-family residential, community serving commercial, regional commercial, and light manufacturing and commercial). A summary of projected water needs is found on the tables labeled "Water Demand Analysis." The approach and assumptions for this analysis were as follows:

1. Determine the approximate amount of land available for each land use category (for example, 57 acres for Regional Commercial development under Alternative #3). From this figure, subtract 30% for roads and rights of way.

2. Apply reasonable minimum and maximum densities for each residential designation (for example, a minimum of 4 and a maximum of 8 units per acre for single family residential areas).

3. Assume that 800 gallons per day/per connection will be needed for each residence (this is the figure used by the State Department of Health for maximum daily use).

4. Use actual City of Pon Townsend water use data to determine water needs for areas designated for Community Commercial and Light Manufacturing/Commercial development (see the "Water Demand Analysis" and "Water Use Estimates" tables). Multiply the average daily use figure by 3 to estimate maximum daily use.

5. Use actual City of Sequim water use data to determine water needs for areas designated for Regional Commercial development (no regional retail development currently exists in our area). Again, multiply the average daily use figure by 3 to estimate maximum daily use.

Determining Water Infrastructure Needs

The cost estimates for providing water system infrastructure are detailed on the tables labeled "Water System Infrastructure" for each of the expanded UGA alternatives. The estimated costs have also been detailed for each separate land use category. The approach and assumptions used for this analysis were as follows:

1. Estimate water storage requirements based on State Department of Health requirements. To determine the water storage requirements for commercial, manufacturing and residential land use designations, assume that 3,450 gallons per minute for 4 hours would be needed for fire flow (bydrologic modeling suggests that this is the amount available with an upgraded infrastructure). To further clarify the requirements for residential water storage assume reasonable minimum and maximum densities for residential designations (for example, a minimum of 4 and a maximum of 8 units an acre for single family residential areas).

2. Next, estimate the water infrastructure costs for:

a. Supply and treatment (use average daily demand);

b. Storage (use the approach outlined in ffl, above);

c. Installing a new 16" diameter transmission pipeline (costs to be borne by commercial and manufacturing development);

d. Installing new 8" diameter distribution pipelines (calculated using an average spacing of 500' for commercial and manufacturing areas, and 300' for residential areas); and

e. Installing new fire hydrants (calculated using an average spacing of 300* for commercial and manufacturing areas, and 500' for residential areas).

Costs estimates for this infrastructure were based on information for the same facilities contained in Port Townsend's draft Capital Facilities Plan, with a 25% markup for engineering, design, legal, and administrative costs.

3. Finally, the cost per connection was determined by dividing the total cost for each land use category by the estimated number of units at build-out for each land use category.

Wastewater

Determining Wastewater Infrastructure Needs

The cost estimates for providing wastewater system infrastructure are detailed on the tables labeled "Wastewater System Infrastructure" for each of the expanded UGA alternatives. The estimated costs have also been detailed for each separate land use category. The approach and assumptions used for this analysis were as follows:

1. Determine the population to be served by multiplying the estimated number of residential units (both minimum and maximum) by 2.16 (the average household size figure used for the Tri-Area Water System Plan).

2. Calculate the amount of wastewater generated per person by using the recommended level of service from Port Townsend's draft Capital Facilities Plan (i.e., 120 gallons per day per person).

3. Calculate the amount of wastewater generated by commercial and manufacturing areas assuming that all water usage goes to wastewater.

4. Determine the costs for three separate options:

a. Use of the Port Townsend Paper Mill outfall to dispose of treated wastewater;

b. Pumping treated water across the Quimper Peninsula to a new outfall near Port Townsend's existing outfall; or

c. Reuse of the treated wastewater.

5. Calculate the costs for a new treatment plant, 20" trunk line, and 8" collection pipe based on the per unit costs contained within Port Townsend's draft Capital Facilities Plan (split the cost of the new trunk line equally between residential and commercial and manufacturing development; assume that the length of collection line is equal to the length of the water distribution line).

6. For the option which assumes that the treated water will be pumped to the City's existing outfall, add the costs for a new transmission pipe, a new pump station, and a new outfall pipe.

7. For the option which assumes that the treated wastewater will be reused, add an additional per unit cost per gallon per day to cover the costs of additional treatment and storage.

8. Finally, add a 25% markup for engineering, design, legal, and administrative costs.

SUMMARY TABLE
GLEN COVE STUDY AREA

WATER INFRASTRUCTURE

ALTERNATIVE #2

ALTERNATIVE #3

 

Community Serving UGA

County-wide Retail/Mfg UGA

Minimum Density

Commercial/Mfg

$4,626,952

$4,574,906

Residential

$2,700,975

$8,249,550

 

TOTAL

$7,327,927

$12,824,456

 

 

Maximum Density

Commercial/Mfg

$4,626,952

$4,574,906

Residential

$4,450,275

$14,116,688

 

TOTAL

$9,077,227

$18,691,594

 

 

 

WASTEWATER INFRASTRUCTURE

ALTERNATIVE #2

ALTERNATIVE #3

 

Community Serving UGA

County-wide Retail/Mfg UGA

Minimum Density

Option 1 - Use Mill Outfall

Commercial/Mfg

$2,614,560

$2,586,500

Residential

$2,881,608

$8,131,892

 

TOTAL - Option 1

$5,496,168

$10,718,392

TOTAL - Option 2 - Pump across town

$8,396,168

$13,618,392

TOTAL - Option 3 - Reuse

$6,348,335

$12,586,740

 

Maximum Density

Option 1 - Use Mill Outfall

Commercial/Mfg

$2,614,560

$2,586,500

Residential

$4,607,880

$13,927,604

 

TOTAL - Option 1

$7,222,440

$16,514,104

TOTAL - Option 2 - Pump across town

$10,122,440

$19,414,104

TOTAL - Option 3 - Reuse

$8,506,175

$19,831,380

Typical Use

Meter readings

Average Annual Use

Average Daily Use

(gallons x 100)

(gallons)

(gallons)

Rounded

 

5/1/92

5/1/95

 

Supermarket

153157

204970

1,727,100

4732

4800

Laundromat

2,627,800

7199

7200

Barber/beauty shop

estimated

500

Bank

14862

15833

32,367

89

100

Auto Supply

estimated

300

Outpatient clinic

5723

10538

160,500

440

500

Day Care

1570

4322

91,733

251

300

Variety Store

110,300

302

300

Deli/Bakery

18446

30993

418,233

1146

1200

Florist

estimated

400

Jewelry store

estimated

200

Pharmacy

8929

12345

113,867

312

400

Shoe repair

estimated

200

Fast Food

31243

47910

555,567

1522

1600

Hardware store

estimated

300

Printing shop

3189

4230

34,700

95

100

Photographer

4156

6203

68,233

187

200

Post office/offices

294534

299931

179,900

493

500

Hotel

200392

258489

1,936,567

5306

5300

Dental office

3189

5692

83,433

229

300

Cinema

35435

36430

33,167

91

100

Church

8610

13333

157,433

431

400

 

Large Wholesale

1500

Large Hardware

300

Gas Station

659

4905

141,533

388

400

Small Mfg

15001

23346

278,167

762

800

GLEN COVE STUDY AREA

Water System Infrastructure

Alternative #2 Community Serving UGA

Cost Estimate

Storage Requirements

Residential

Commercial/Manufacturing

Total

 

Minimum

Maximum

Minimum

Maximum

standby storage (MDD)

579,040

1,112,160

459,617

1,038,657

1,571,777

fire flow

3450

gpm for

4 Hours

828,000

828,000

828,000

equalizing storage (25% MDD)

144,760

278,040

114,904

259,664

392,944

TOTAL

723,800

1,390,200

1,402,521

gallons

2,126,321

2,792,721

gallons

 

Minimum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Supply & Treatment

459,617

gallons

579,040

gallons @

$1

/gallon

$ 459,617

$ 579,040

$ 1,038,657

Storage

1,402,521

gallons

723,800

gallons @

$1.30

/gallon

$ 1,823,278

$ 940,940

$ 2,764,218

New 16" pipe

13,000

feet

-

feet @

$48

/foot

$ 624,000

$

$ 624,000

New 8" pipe

29,800

feet

26,700

feet @

$20

/foot

$ 596,000

$ 534,000

$ 1,130,000

Hydrants every

300

feel

500

feet @

$2,000

each

$ 198,667

$ 106,800

$ 305,467

# units

152

724

 

$

Subtotal

$3,701,561

$2,160,780

$ 5,862,341

Eng/Des/Legal/
Admin

25%

$ 925,390

$ 540,195

$ 1,465,585

MINIMUM TOTAL

$ 4,626,952

$ 2,700,975

$ 7,327,927

Cost per connection

$ 30,440

$ 3,731

$ 8,365

 

Maximum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Supply &. Treatment

459,617

gallons

1,112,160

gallons @

$1

/gallon

$ 459,617

$ 1,112,160

$ 1,571,777

Storage

1,402,521

gallons

1,390,200

gallons @

$1.30

/gallon

$ 1,823,278

$ 1,807,260

$ 3,630,538

New 16" pipe

13,000

feet

feet @

$48

/foot

$ 624,000

$

$ 624,000

New 8" pipe

29,800

feet

26,700

feet @

$20

/foot

$ 596,000

$ 534,000

$ 1,130,000

Hydrants every

300

feet

500

feet @

$2,000

each

$ 198,667

$ 106,800

$ 305,467

# units

152

1.390

 

$

Subtotal

$3,701,561

$ 3,560,220

$ 7,261,781

Eng/Des/Legal/
Admin

25%

$ 925,390

$ 890,055

$ 1,815,445

MAXIMUM TOTAL

$ 4,626,952

$ 4,450,275

$ 9,077,227

Cost per connection

$ 30,440

$ 3,202

$ 5,887

GLEN COVE STUDY AREA

Wastewater System Infrastructure

Alternative #2 Community Serving UGA

Cost Estimate

Assumptions

 

Minimum

Maximum

Residential Units

724

1,390

2.16 people /residential unit

1,564

3,002

people

120 gpd/capita

187,661

360,288

gpd average flow wastcwater

Commercial/Manufacturing

153,206

153,206

gpd average flow wastewater

TOTAL

152 comm/mfg units

340,867

513,494

gpd wastewater

Minimum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Option 1 - Use Mill Outfall

Treatment Plant

153,206

gpd

187,661

gpd @

$8

/gpd

$ 1,225,648

$ 1,501,286

$ 2,726,934

New Trunk Liri'e (20")

4,500

feet

4,500

feet @

$60

/foot

$ 270,000

$ 270,000

$ 540,000

New Collection Pipe

29,800

feet

26,700

feet @

$20

/fool

$ 596,000

$ 534,000

$ 1,130,000

Subtotal

$2,091,648

$ 2,305,286

$ 4,396,934

Studies/Eng/Des/Lcgal/ Admin/Permits

25%

$ 522,912

$ 576,322

$ 1,099,234

TOTAL OPTION 1

$2,614,560

$2,881,608

$ 5,496,168

Cost per connection

$ 17,201

$ 3,980

$ 6,274

 

Option 2 - Pump across town to new outfall at existing outfall location

 

2000

feet of outfall pipe @

$ 700

/foot

$ 1,400,000

 

20,000

feet of 12" transmission pipe @

$36

/foot

$ 720,000

 

1

pump station @

$ 200,000

each

$ 200,000

Option 2 Outfall Total

$ 2,320,000

Treatment/Trunk Line/Collection Pipe

$ 4,396,934

Studies/Eng/Des/
Legal/Admin/
Permits

25%

$ 1,679,234

TOTAL OPTION 2

$ 8,396,168

Cost per connection

$ 9,585

 

 

Option 3 - Reuse at mill w/tertiary treatment ofwastewater

 

340,867

Gpd@

$2.00

/gpd

$ 681,734

Treatment/Trupk Line/Collection Pipe

$ 4,396,934

Sludies/Eng/Des/Lcgal
/Admin/Permits

25%

$ 1,269,667

TOTAL OPTION 3

$ 6,348,335

Cost per connection

$7,247

Wastewater System Infrastructure

Alternative #2 Community Serving UGA

Cost Estimate

Maximum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Option 1 - Use Mill Outfall

Treatment Plant

153,206

gpd

360,288

gpd @

$8

/gpd

$ 1,225,648

$ 2,882,304

$ 4,107,952

New Trunk Line (20")

4,500

feet

4,500

feet @

$60

/foot

$ 270,000

$ 270,000

$ 540,000

New Collection Pipe

29,800

feet

26,700

feel @

$20

/foot

$ 596,000

$ 534,000

$ 1,130,000

Subtotal

$2,091,648

$ 3,686,304

$ 5,777,952

Studies/Eng/Des/Legal
/Admin/Permits

25%

$ 522,912

$ 921,576

$ 1,444,488

TOTAL OPTION 1

$2,614,560

$4,607,880

$ 7,222,440

Cost per connection

$ 17,201

$ 3,315

$ 4,684

 

Option 2 - Pump across town to new outfall at existing outfall location

 

2000

feet of outfall pipe @

$ 700

/foot

$ 1,400,000

 

20,000

feet of 12" transmission pipe @

$36

/foot

$ 720,000

 

1

pump station @

$ 200,000

each

$ 200,000

Option 2 Oulfall Total

$ 2,320,000

Treatment/Trunk Line/Collection Pipe

$ 5,777,952

Studies/Eng/Dcs/Legal/ Admin/Permits

25%

$ 2,024,488

TOTAL OPTION 2

$ 10,122,440

Cost per conncction

$ 6,564

 

 

Option 3 - Reuse at mill w/tertiary treatment ofwastewater

 

513,494

gpd @

$2.00

/gpd

$ 1,026,988

Treatment/Trunk Line/Collection Pipe

$ 5,777,952

Studies/Eng/Des/Legal/ Admin/Permits

25%

$ 1,701,235

TOTAL OPTION 3

$ 8,506,175

Cost per connection

$ 5,516

ALTERNATIVE #2

COMMUNITY SERVING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

TOTAL

AVAILABLE

# UNITS/ACRE

# UNITS

WATER NEEDS (RESIDENTIAL)

 

ACREAGE

ACREAGE

(RESIDENTIAL)

(RESIDENTIAL)

(MDD - 800 gallons/connection/day)

 

(minus roads)

Minimum

Maximum

Minimum

Maximum

Minimum

Maximum

 

Assumes

30%

unavailable for roads

 

R-I

83

58

2

4

116

232

92960

185920

R-IIa

6

4

4

8

17

34

13440

26880

R-IIb

47

33

4

8

132

263

105280

210560

R-III

82

57

8

15

459

861

367360

688800

 

TOTAL

218

153

724

1390

579,040

1,112,160

gpd residences

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMMUNITY SERVING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

 

TOTAL

AVAILABLE

 

WATER USE (gallons/day)

 

 

 

ACREAGE

ACREAGE

 

(rounded to nearest 100 gallons)

 

 

 

 

 

 

Average Daily Demand

Maximum Daily Demand

Assumes

 

 

 

 

 

 

 

= ADDx

3

 

30%

unavailable for roads

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C-I

 

46

32.2

 

 

2

Supermarket

5

22.2

9600

28800

2

Laundry

0.5

21.2

14400

43200

2

Barber/Beauty Shop

0.25

20.7

1000

3000

2

Bank

0.5

19.7

200

600

2

Auto Supply

1

17.7

600

(estimate)

1800

2

Clinic, outpatient

0.5

16.7

1000

3000

2

Nursery/Day Care

0.5

15.7

600

1800

2

Variety Store

1

13.7

600

1

1800

2

Deli/Bakery

0.25

13.2

2400

7200

2

Florist

0.25

12.7

800

(estimate)

2400

2

Jewelry Store

0.25

12.2

400

(estimate)

1200

2

Pharmacy

0.25

11.7

800

2400

2

Shoe Repair

0.25

11.2

400

(estimate)

1200

2

Fast Food

1

9.2

3200

9600

2

Hardware Stoic

1

7.2

600

(estimate)

1800

2

Printing Shop

0.5

6.2

200

600

2

Photograph Developer

0.25

5.7

400

1200

2

Post Office/Offices

0.5

4.7

1000

3000

 

Hotel

2

2.7

5300

15900

1

Dental Office

0.25

2.5

300

900

1

Cinema

1

1.5

100

300

I

Church

1

0.4

400

1200

 

 

Subtotal

 

44,300

gpd

132,900

gpd

 

 

 

 

 

 

1395

gpd/acre

4186

gpd/acre

ALTERNATIVE #2

COMMUNITY SERVING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

TOTAL ACREAGE

AVAILABLE ACREAGE

WATER USE (gallons/day)

Average Daily Demand

Maximum Daily Demand

(Assumes

30%

Unavailable for roads)

= ADD x

3

REGIONAL COMMERCIAL

23

16

 

 

Large Wholesale

10

6

1500

4500

 

Large Hardware

5

1

300

900

 

Gas Station (2)

1

0

800

2400

 

Subtotal

 

2,600

gpd

7,800

gpd

Wastewater System Infrastructure

Alternative #3 County-Wide Retail/Manufacturing UGA

Cost Estimate

Assumptions

 

Minimum

Maximum

Residential Units

2,276

4,512

2.16 people /residential unit

4,916

9,746

people

120 gpd/capita

589,939

1,169,510

gpd average flow wastewater

Commercial/Manufacturing

157,400

157,400

gpd average flow wastewater

 

152 comm/mfg units

TOTAL

747,339

1,326,910

gpd wastwater

 

Minimum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Option 1 - Use Mill Outfall

Treatment Plant

157,400

gpd

589,939

gpd @

$8

/gpd

$ 1,259,200

$ 4,719,514

$ 5,978,714

New Trunk Line (20")

4,500

feet

4,500

fed @

$60

/foot

$ 270,000

$ 270,000

$ 540,000

New Collection Pipe

27,000

feet

75,800

feel @

$20

/foot

$ 540,000

$ 1,516,000

$ 2,056,000

Subtotal

$ 2,069,200

$ 6,505,514

$ 8,574,714

Studies/Eng/Des/Legal
/Admin/Permits

25%

$ 517,300

$ 1,626,378

$ 2,143,678

TOTAL OPTION 1

$ 2,586,500

$ 8,131,892

$ 10,718,392

Cost per connection

$ 17,016

$ 3,573

$ 4,414

 

Option 2 - Pump across town to new outfall at existing outfall location

 

2000

feet of outfall pipe @

$ 700

/foot

$ 1,400,000

 

20,000

feet of 12" transmission pipe @

$36

/foot

$ 720,000

 

1

pump station @

$ 200,000

each

$ 200,000

Option 2 Outfall Total

$ 2,320,000

Treatment/Trunk Line/Collection Pipe

$ 8,574,714

Sludies/Eng/Dcs/Lcgal/ Admin/Permits

25%

$ 2,723,678

TOTAL OPTION 2

$ 13,618,392

Cost per connection

$ 5,609

 

 

Option 3 - Relish at mill w/lertiary treatment of wastewater

 

747,339

gpd @

$2.00

/gpd

$ 1,494,678

Treatment/Trunk Line/Collection Pipe

$ 8,574,714

Studies/Eng/Des/Legal/ Admin/Permits

25%

$ 2,517,348

TOTAL OPTION 3

$ 12,586,740

Cost per connection

$ 5,184

GLEN COVE STUDY AREA

Wastewater System Infrastructure

Alternative #3 County-Wide Retail/Manufacturing UGA

Cost Estimate

Maximum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Option 1 - Use Mill Outfall

Treatment Plant

157,400

gpd

1,169,510

gpd @

$8

/gpd

$ 1.259,200

$ 9,356,083

$ 10,615,283

New Trunk Line (20")

4,500

feet

4,500

feet @

$60

/foot

$ 270,000

$ 270,000

$ 540,000

New Coiled ion Pipe

27,000

feet

75,800

feet @

$S20

/foot

$540,000

$ 1,516,000

$ 2,056,000

Subtotal

$2,069,200

$ 11,142,083

$ 13,211,283

Stiidies/Eng/Des/Lcgal/ Admin/Permits

25%

$ 517,300

$ 2,785,521

$ 3,302,821

TOTAL OPTION 1

$ 2,586,500

$ 13,927,604

$ 16,514,104

Cost per con nation

$ 17,016

$ 3,087

$ 3,541

 

Option 2 - Pump across town to new outfall at existing outfall location

 

2000

feet of outfall pipe @

$ 700

/foot

$ 1,400,000

 

20.000

feet of 12" transmission pipe @

$36

/foot

$ 720,000

 

1

pump station @

$ 200,000

each

$ 200,000

Option 2 Outfall Total

$ 2,320,000

Treatment/Trunk Line/Collection Pipe

$ 13,211,283

Sludies/Eng/Des/Lcgal/ Admin/Permits

25%

$ 3,882,821

TOTAL OPTION 2

$ 19,414,104

Cost per connection

$ 4,163

 

 

Option 3 - Reuse at mill w/lertiary treatment of wastewater

1,326,910

gpd @

$2.00

/gpd

$ 2,653,821

Treatment/Trunk Line/Collection Pipe

$ 13,211,283

Studies/Eng/Des/Legal/ Admin/Permits

25%

$ 3,966,276

TOTAL OPTION 3

$ 19,831,380

Cost per connection

,

$ 4,252

COUNTY-WIDE RETAIL/MANUFACTURING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

TOTAL

AVAILABLE

# UNITS/ACHE

# UNITS

WATER NEEDS (RESIDENTIAL)

 

ACREAGE

ACREAGE

(RESIDENTIAL)

(RESIDENTIAL)

(MD1)= 800 gallons/connection/day)

 

(minus roads)

Minimum

Maximum

Minimum

Maximum

Minimum

Maximum

 

Assumes

30%

unavailable for roads

 

R-Ia

55

39

2

4

77

154

61600

123200

R-Ib

253

177

2

4

354

708

283360

566720

R-IIa

85

60

4

8

238

476

190400

380800

R-IIIa

36

25

8

15

202

378

161280

302400

R-IIIb

23

16

8

15

129

242

103040

193200

R-IVa

82

57

12

24

689

1378

551040

1102080

R-IVb

19

13

12

24

160

319

127680

255360

R-IVc

21

15

12

24

176

353

141120

282240

R-IVd

30

21

12

24

252

504

201600

403200

 

TOTAL

604

423

2276

4512

1,821,120

3,609,200

gpd residences

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ALTERNATIVE #3

COUNTY-WIDE RETAIL/MANUFACTURING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

TOTAL

AVAILABLE

WATER USE (gallons/day)

 

ACREAGE

ACREAGE

Average Daily Demand

Maxium Daily Demand

(Assume

30%

Unavailable for roads)

= ADD x

3

C-1

79

55.3

 

4

Supermarket

5

35.3

19200

57600

3

Laundry

0.5

33.8

21600

64800

3

Barber/Beauty Shop

0.25

33.1

1500

4500

3

Bank

0.5

31.6

300

900

3

Aulo Supply

1

28.6

900

(estimate)

2700

3

Clinic, outpatient

0.5

27.1

1500

4500

3

Nursery/Day Care

0.5

25.6

900

2700

3

Variety Store

1

22.6

900

2700

3

Dcli/Bakcry

0.25

21.8

3600

10800

3

Florist

0.25

21.1

1200

(estimate)

3600

3

Jewelry Store

0.25

20.3

600

(estimate)

1800

3

Pharmacy

0.25

19.6

1200

3600

3

Fast Food

1

16.6

4800

14400

3

Printing Shop

0.5

15.1

300

900

3

Shoe Repair

0.25

14.3

600

1800

3

Photograph Developer

0.25

13.6

600

1800

3

Post Office/Offices

0.5

12.1

1500

4500

3

Hotel/Motel

1

9.1

15900

47700

3

Dental Office

0.25

8.3

900

2700

3

Hardware Store

1

5.3

900

(estimate)

2700

2

Cinema

1

3.3

200

600

3

Churches

1

0.3

1200

3600

 

 

 

80,300

gpd =

240,900

gpd =

 

1,460

gpd/acre

4,380

gpd/acre

ALTERNATIVE #3

COUNTY-WIDE RETAIL/MANUFACTURING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

# UNITS

TOTAL

AVAILABLE

WATER USE (gallons/day)

 

ACREAGE

ACREAGE

Average Daily Demand

Maximum Daily Demand

(Assumes

30%

unavailable for roads

=ADD x

3

 

M/C

154

108

 

Small manufacturer

44

2

acres/unit

20

35200

105600

Retail

10

2

acres/unit

0

29200

87600

 

Subtotal

64,400

gpd

193,200

gpd

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COUNTY-WIDE RETAIL/MANUFACTURING UGA

WATER DEMAND ANALYSIS

Glen Cove Study Area

ZONE

TOTAL

AVAILABLE

WATER USE (gallons/day)

 

ACREAGE

ACREAGE

Average Daily Demand

Maximum Daily Demand

(Assumes

30%

unavailble for roads)

= ADDx

3

 

REGIONAL COMMERCIAL

57

40

 

 

Large Wholesale

10

30

1500

4500

 

Mall

25

5

10000

(estimate)

30000

 

Gas Station (3)

3

2

1200

3600

 

 

Subtotal

12,700

gpd

38,100

gpd

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GLEN COVE STUDY AREA
Water System Infrastructure
Alternative #3 County-Wide Retail/Manufacturing UGA
Cost Estimate

Storage Requirements

Residential

Commercial/Manufacturing

Total

 

Minimum

Maximum

Minimum

Maximum

standby storage (MDD)

1,821,120

3,609,200

472,200

2,293,320

4,081,400

fire flow 3450 gpm for

4 hours

828.000

828,000

828,000

equalizing storage (25% MDD)

-455,280

902.300

118.050

573,330

1,020,350

TOTAL

2,276,400

4,511,500

1,418,250

gallons

3,694,650

5,929,750

gallons

 

Minimum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Supply & Treatment

472,200

gallons

1,821,120

gallons @

$1

/gallon

$ 472,200

$ 1,821,120

$ 2,293,320

Storage

1,418,250

gallons

2,276,400

gallons @

$1.30

/gallon

$ 1,843,725

$ 2,959,320

$ 4,803,040

New 16" pipe

13,000

feet

-

feet @

$48

/foot

$ 624,000

$-

$ 624,000

New 8" pipe

27,000

feet

75,800

feet @

$20

/foot

$ 540,000

$ 1,516,000

$ 2,056,000

Hydrants every

300

feet

500

feet @

$2,000

each

$ 180,000

$ 303,200

$ 483,200

# units

125

2,276

 

$-

Subtotal

$ 3,659,925

$ 6,599,640

$ 10,259,565

Eng/Dcs/Legal/Admin

25%

$ 914,981

$ 1,649,910

$ 2,564,891

MINIMUM TOTAL

$ 4,574,906

$ 8,249,550

$ 12,824,450

Cost per connection

$ 36,599

$ 3,625

$ 5,342

Maximum Density

 

Comm/Mfg

Residential

Comm/Mfg

Residential

Total

Supply &. Treatment

472,200

gallons

3.609,200

gallons @

$1

/gallon

$ 472,200

$ 3,609,200

$ 4,081,400

Storage

1,418,250

gallons

4,511,500

gallons @

$1.30

/gallon

$ 1,843,725

$ 5,864,950

$ 7,708,675

New 16" pipe

13,000

feet

-

feet @

$48

/foot

$ 624,000

$

$ 624,000

New 8" pipe

27,000

feet

75,800

feet @

$20

/foot

$ 540,000

$ 1,516,000

$ 2,056,000

Hydrants every

300

feet

500

feet @

$2,000

each

$ 180,000

$ 303,200

$ 483.200

# units

125

4,512

 

$ -

Subtotal

$ 3,659,925

$ 11,293,350

$ 14,953,275

Eng/Des/Legal/Admin

25%

$ 914,981

$ 2,823,338

$ 3,738,319

MAXIMUM TOTAL

$4,574,906

$ 14,116,688

$ 18,691,594

Cost per connection

$ 36,599

$ 3,129

$ 4,031

COMMUNITY SERVING UGA
WATER DEMAND ANALYSIS
Glen Cove Study Area

ZONE

# UNITS

TOTAL

AVAILABLE

WATER USE (gallons/day)

 

ACREAGE

ACREAGE

Average Daily Demand

Maximum Daily Demand

(Assumes

30%

unavailable for roads)

= ADDx

3

 

M/C

310

217

 

Small manufacturer

98

2

acres/unit

21

78400

235200

Retail/Commercial

10

2

acres/unit

27906

83716.535

 

Subtotal

106,306

gpd

318,917

gpd

 

 

 

 

 

 

 

 

 

 


TOCPREVNEXT