Skip to main content
Loading…
This section is included in your selections.

A. A connection charge shall be paid by each new customer connecting to the city’s sewer system within the following described district(s). This special connection charge is based upon the actual cost of constructing improvements which relate directly and exclusively to homes within the district(s) and which are, because of the special nature of the construction, separate and distinct from the overall costs of the system paid by a customer pursuant to ECC 7.30.035. These charges shall be in addition to the charges paid by a new customer pursuant to ECC 7.30.035 and do not duplicate any costs contained in the underlying sewer utility connection charge.

B. 88th Avenue West Sewer Special Connection District.

1. Properties addressed as 21903, 21904, and 21911 88th Avenue West shown on Exhibit A attached to the ordinance codified in this section maintained on file in the city clerk’s office and any subdivision, lot line adjustment or reconfiguration of the lots or the property represented by such addresses shall pay a special connection fee, to be paid in full at the time of connection to the sewer system, of $2,941.39 per lot.

2. Due to the significant additional sewer system construction that will be required at the property owners’ expense to connect these properties to the sewer system after completion of the sewer project by the city, these properties may defer connection and shall not be required to connect to the sewer system within the time limit requirements of ECDC 18.10.010 and ECC 7.30.040.

3. The owner of any of these properties that does not connect to the sewer system within the time limits in accordance with ECDC 18.10.010 shall, upon connection to the sewer system, pay the above established special connection fee, increased based upon the Department of Labor Bureau of Labor Statistics Consumer Price Index for construction for the Seattle-Bellevue-Everett area from the effective date of the ordinance codified in this section to the time of connection to the sewer system.

C. Olympic View Drive Sewer Special Connection Districts.

1. Properties legally described, addressed and identified on the attached Exhibit A (maintained on file in the city clerk’s office) as 7101, 7109, 7115, 7327, and 7333 Olympic View Drive, and 7530 184th Place SW/Olympic View Drive, or any subdivision, lot line adjustment, reconfiguration, or modification (including but not limited to legal description, address and other identification) of the lots or the property represented by those addresses shall pay, in addition to other connection charges and/or permit fees required by ordinance and/or resolution, a special connection fee, to be paid in full at the time of initial connection to the sewer laterals constructed in Olympic View Drive as identified on sheets 72-78 of the city of Lynnwood’s construction drawings for the Olympic View Drive Phase 2 – 76th Ave W to 178th Place SW, as follows:

Address

Special Connection Fee

7101 Olympic View Drive

$4,015.85

7109 Olympic View Drive

$3,720.56

7115 Olympic View Drive

$3,569.45

7327 Olympic View Drive

$3,009.26

7333 Olympic View Drive

$2,939.29

7530 184th Place SW

$3,798.31

Upon declaration by the city that the aforementioned sewer laterals constructed in Olympic View Drive are operational, the properties in Exhibit A shall connect to the sewer system in accordance with the requirements of ECDC 18.10.010 and ECC 7.30.040; provided, that a four-month extension to connect shall be granted to any of said properties that is developed upon payment, before the expiration of the time limit to connect set forth in ECDC 18.10.010, of one-third of the respective special connection fee charged above.

Any of said properties that is undeveloped at the time the sewer laterals are declared operational shall be allowed to defer connection to the public sewer system until the time when the property is developed. The owner of a property with deferred connection shall pay, upon initial connection to sewer laterals in Olympic View Drive, the special connection fee as set forth above, increased by a cumulative multiple, to the extent permitted under RCW 35.92.025, equal to the Department of Labor Bureau of Labor Statistics Consumer Price Index for construction for the Seattle-Bellevue-Everett area from the expiration of the time limits to connect set forth in ECDC 18.10.010, which would then have applied had the property not been undeveloped, to the time of initial connection.

2. Properties legally described, addressed and identified on the attached Exhibit B (maintained on file in the city clerk’s office) as 17632, 17708, 17626, 17806, 17810, 17910, and certain unaddressed property located between 17810 and 17910 Olympic View Drive and any subdivision, lot line adjustment, reconfiguration, or modification (including but not limited to legal description, address and other identification) of the lots or the property represented by such addresses shall pay, in addition to other connection charges and/or permit fees required by ordinance and/or resolution, a special connection fee, to be paid in full at the time of initial connection to the public sewer manhole and stub pipe located at the northwest corner of 180th St. SW and Olympic View Drive as identified on sheet 60 of the city of Lynnwood’s construction drawings for the Olympic View Drive Phase 1 – 178th Place SW to 168th St. SW (public sewer manhole), of $4,932.85 per lot.

Due to the significant additional sewer system construction that will be required at the property owners’ expense to connect to the above referenced public sewer manhole and stub pipe, the properties in Exhibit B, regardless of whether they are developed or not, may, notwithstanding the requirements of ECDC 18.10.010 and ECC 7.30.040, defer connection to the same.

The owner of a property that defers connection shall pay, upon initial connection to the public sewer manhole and stub pipe, the above established special connection fee, increased by a cumulative multiple, to the extent permitted under RCW 35.92.025, equal to the Department of Labor Bureau of Labor Statistics Consumer Price Index for construction for the Seattle-Bellevue-Everett area from the expiration of the time limits to connect set forth in ECDC 18.10.010 to the time of connection; provided, that if the property with deferred connection was undeveloped when the public sewer manhole and stub pipe were declared operational by the city, its owner shall pay, upon initial connection to the same, the above established special connection fee, increased to the extent permitted under RCW 35.92.025 by the aforementioned index from the expiration of the time limits to connect set forth in ECDC 18.10.010, which would then have applied had the property not been undeveloped, to the time of connection. [Ord. 3777 § 1, 2010; Ord. 3657 § 1, 2007].