Chapter 13.24
RATES AND CHARGES
Sections:
13.24.010 Additional connection charge.
13.24.020 Repealed.
13.24.030 Repealed.
13.24.040 Collection – Waiver.
13.24.050 Connection charge to City-owned mains.
13.24.060 Connection charge for partial water line extensions.
13.24.070 Hydrant charges.
13.24.080 Service installation fees.
13.24.090 General facility charge – Water.
13.24.110 Water rates – Generally.
13.24.120 Water rates – Delinquent.
13.24.130 Accounts – Billing and delinquency.
13.24.010 Additional connection charge.
In addition to the charges for installing the connection and meter, an owner of property fronting on a main for which the property has neither been assessed nor otherwise paid its pro rata share of the cost of the main shall be required to pay the pro-rata share to the City as a condition to the right to connect to the main. The charges may be collected either for the benefit of the City Water System or for private persons who have paid the cost of constructing the main and have entered into a recovery contract with the City. (Ord. 1091 § 5.01, 1971).
13.24.020 Recovery contract – Collection of front footage cost.
Repealed by Ord. 2223. (Ord. 1091 § 5.01(A), 1971).
13.24.030 Collection – Enforcement.
Repealed by Ord. 2223. (Ord. 1091 § 5.01(B), 1971).
13.24.040 Collection – Waiver.
Where mains have been constructed by or for the City without assessment of abutting property and where a water main extension is proposed to serve abutting property, the City may waive collection of all or part of connecting charges due the City. Such waiver shall be for the purpose of encouraging extensions of the distribution system and may be granted only under the following circumstances:
A. Waiver shall be granted in any case where a previous recovery contract would prohibit inclusion of the particular frontage in a second recovery contract.
B. The total length of the proposed extension shall be at least 300 feet or equal to the frontage of the property, on the City’s main, for which waiver is requested, whichever is the greater.
C. Frontage for which waiver is granted shall include the width of newly platted rights-of-way.
D. Wherever the tract being subdivided has a corner with frontage on City mains on 2 sides, waiver shall be granted for 100 feet adjacent to such corner unless the tract being subdivided has a lesser dimension in either direction from the corner, which lesser dimension shall prevail.
E. In order that lots in any new subdivision shall either all be served with water without payment of connection charges or all be subject to payment of connection charges, developers who install water system extensions to serve a new subdivision shall pay the full connection charge for all land platted adjacent to City mains (less amount waived) as a condition to the providing of water service to the extension. (Ord. 1091 § 5.01(C), 1971).
13.24.050 Connection charge to City-owned mains.
A. All connection charges for service from water and sewer mains owned by the City installed after January 1, 1972, and not subject to recovery contracts shall be based on the actual construction cost apportioned according to front footage or any other equitable method of apportionment. These charges are declared to represent a fair pro rata share of the cost of construction of a main with appurtenances, without regard to the actual size of mains constructed.
B. Where the City has participated in a project financed by the method of “Cash Contributions,” the connection charge shall be the fair share of the actual construction costs. The connection charges shall not apply to premises which:
1. Have been previously connected without payment of connection charges;
2. Are served by mains constructed for the purpose of serving the premises and donated to the City; or
3. Are situated on property for which connection charges have been previously paid. (Ord. 1901 § 1, 1991; Ord. 1091 § 5.01(D), 1971).
13.24.060 Connection charge for partial water line extensions.
Under special circumstances, such as at pressure zone separations, the City may permit only a portion of a water extension to be constructed. In such cases, the developer shall deposit a sum of money calculated at a rate established under IMC 13.24.050 for the portion of frontage not covered by the extension but required to be covered under IMC 13.12.010 and 13.16.030. The sum shall be used by the City to pay the developer’s portion of a future extension past the frontage not covered by the partial extension. No refund shall be made if the owner’s fair share of the cost is less than the payment to the City; neither shall the City claim any additional amount due if it incurs a greater cost for construction. (Ord. 1091 § 5.01(E), 1971).
13.24.070 Hydrant charges.
A. Fire Districts. Any fire district having fire hydrants served by the City Water System shall pay the City the sum of $5.00 per annum for each fire hydrant served. The charge is to cover the City’s annual cost of maintaining the hydrants and valves and providing water adequate for fire protection. It is understood that no fire district shall begin paying the sum until such time as the fire district has the service of a fire truck. It also understood that fire district crews shall use discretion in the use of water and the handling of fire hydrants during fire drills. A district will be notified no later than July 31st of the current year as to the number of hydrants within the district for which the $5.00 fee will be charged for the following year.
B. Private Fire Protection, Automatic Sprinkler System, Wet or Dry Standpipes. The rates for water supplied for fire protection of standby service, exclusively, shall be deemed service charges and shall be, for any 1 month or fractional part thereof, equal to the minimum monthly residential charge. (Ord. 1091 § 5.02, 1971).
13.24.080 Service installation fees.
A. No service installation fee shall be levied against any building in which there is an existing water service, including meter and meter box, which was installed by a developer or other agency and meets the requirements of this Code as to location and materials used.
B. Fees for installation of water meters shall be listed in the current Public Works Department Schedule of Charges. These fees shall be paid in cash prior to connection to a City water main and shall include the cost of connection, water meter, meter box, fittings, and shut-off valves. Pressure-reducing devices and check valves shall not be included, but shall be installed, when required, by the customer in his system within the property served. Fixed fees shall include up to 60 feet of service line, beyond which the cost of materials and labor shall be separately billed. (Ord. 1391 § 1, 1979; Ord. 1262 § 1, 1977; Ord. 1091 § 5.03, 1971).
13.24.090 General facility charge – Water.
A. Beginning August 19, 1996, and thereafter in addition to other fees imposed by ordinance or pursuant to agreements, there is imposed upon the owners of property seeking to provide water service to their property by connecting to the City’s water system, a general facility charge. The charge shall be in accordance with the schedule of charges contained in this section entitled “Water General Facility Charge”; provided, however, that when the City requires a fire suppression system (fire sprinkler) in a single-family residence, the City shall not charge that residence a general facility charge rate greater than that established for a meter sized for the same residence but without a fire suppression system, as set forth in this section.
B. The general facility charge for all new connections to Issaquah’s water utility shall be paid in accordance with the table below titled “Water General Facility Charge.” The water general facility charge becomes effective January 1, 2008.
|
Single-Family Residential/Duplexes |
||||||
|
Meter Size |
New Connections Except TALUS and Issaquah Highlands |
New Connections in TALUS and Issaquah Highlands Only |
||||
|
Regional Supply and Treatment* |
City Facilities** |
Total |
Regional Supply and Treatment |
City Facilities |
Total |
|
|
5/8'' / 3/4'' |
$ 5,674 |
$ 4,026 |
$ 9,700 |
$ 5,674 |
$ 0 |
$ 5,674 |
|
1'' |
14,185 |
8,706 |
22,891 |
14,185 |
0 |
14,185 |
|
1.5'' |
28,370 |
16,778 |
45,148 |
28,370 |
0 |
28,370 |
|
2'' |
45,392 |
25,878 |
71,270 |
45,392 |
0 |
45,392 |
|
Commercial/Apartments/Trailer Courts/Public Authority |
||||||
|
Meter Size |
New Connections Except TALUS and Issaquah Highlands |
New Connections in TALUS and Issaquah Highlands Only |
||||
|
Regional Supply and Treatment |
City Facilities |
Total |
Regional Supply and Treatment |
City Facilities |
Total |
|
|
5/8'' / 3/4'' |
$ 5,674 |
$ 7,892 |
$ 13,566 |
$ 5,674 |
$ 0 |
$ 5,674 |
|
1'' |
14,185 |
12,572 |
26,757 |
14,185 |
0 |
14,185 |
|
1.5'' |
28,370 |
30,285 |
58,655 |
28,370 |
0 |
28,370 |
|
2'' |
45,392 |
29,744 |
75,136 |
45,392 |
0 |
45,392 |
|
3'' |
90,784 |
56,673 |
147,457 |
90,784 |
0 |
90,784 |
|
4'' |
141,850 |
84,952 |
226,802 |
141,850 |
0 |
141,850 |
|
6'' |
283,700 |
163,066 |
446,766 |
283,700 |
0 |
283,700 |
|
8'' |
453,920 |
256,671 |
710,591 |
453,920 |
0 |
453,920 |
|
Parks and Private Irrigation |
||||||
|
Meter Size |
New Connections Except TALUS and Issaquah Highlands |
New Connections in TALUS and Issaquah Highlands Only |
||||
|
Regional Supply and Treatment |
City Facilities |
Total |
Regional Supply and Treatment |
City Facilities |
Total |
|
|
5/8'' / 3/4'' |
$ 5,674 |
$ 3,381 |
$ 9,055 |
$ 5,674 |
$ 0 |
$ 5,674 |
|
1'' |
14,185 |
8,061 |
22,246 |
14,185 |
0 |
14,185 |
|
1.5'' |
28,370 |
15,774 |
44,144 |
28,370 |
0 |
28,370 |
|
2'' |
45,392 |
25,233 |
70,625 |
45,392 |
0 |
45,392 |
|
3'' |
90,784 |
52,162 |
142,946 |
90,784 |
0 |
90,784 |
|
4'' |
141,850 |
80,441 |
222,291 |
141,850 |
0 |
141,850 |
|
*Regional Supply and Treatment incorporates the Cascade Water Alliance regional capital facility charge. |
||||||
|
**City Facilities incorporates the following cost components: storage, transmission and delivery, pumping, meters and services, hydrants, and administrative. |
||||||
C. Applicants for water connection shall pay the applicable general facility charge in effect at the time the construction permit authorizing the connection to the water system is issued. (Ord. 2505 §§ 1, 3, 2007; Ord. 2468 § 1, 2006; Ord. 2440 §§ 1, 2, 2005; Ord. 2407 §§ 1, 2, 2004; Ord. 2378 §§ 1, 2, 2003; Ord. 2360 § 2, 2003; Ord. 2337 § 1, 2002; Ord. 2116 § 1, 1996; Ord. 1642 § 1, 1984; Ord. 1529 §§ 2 – 3, 1982; Ord. 1385 § 1, 1979; Ord. 1369 § 1, 1979; Ord. 1262 § 2, 1977; Ord. 1091 § 5.03(a), 1971).
13.24.110 Water rates – Generally.
The consumption and use of all water taken from the City Water System, or from the water system of any water district or association which obtains its water from the City Water System, shall be metered at every connection to the water system. Rates or charges for water use shall be based on the quantity consumed during each billing period as hereinafter defined. The fixed charge for any billing period shall not be less than the amounts set forth in the table of fixed charges based on meter size.
A. Billing Period. The normal billing period shall be 2 months, which for accounting purposes shall be on the first day of the month during which the meters are read. Charges for periods of less than 2 months shall be prorated both as to fixed charge and as to consumption. All meters installed on the system shall pay the fixed bi-monthly charge whether turned on or off.
B. Billing Increments. Charges for water used shall be computed on the nearest 100 cubic feet of consumption.
C. Rates. All water used for domestic and commercial purposes shall be supplied by meter only. The rates for metered water supplied to premises shall be per account (meter) and shall be in accordance with the schedule of charges contained in this section entitled “Water Rates.” These water rates will become effective the first full billing cycle after November 1, 2006.
|
Single-Family Residential |
Fixed Bimonthly |
Block 1 |
Block 2 |
Block 3 |
Block 4 |
Block 5 |
|
|
0 – 4 ccf |
5 – 14 ccf |
15 – 30 ccf |
31 – 50 ccf |
> 50 ccf |
|||
|
3/4" |
meter |
$ 20.87 |
$ 1.35 |
$ 3.21 |
$ 5.96 |
$ 9.71 |
$ 13.96 |
|
1" |
meter |
45.32 |
1.35 |
3.21 |
5.96 |
9.71 |
13.96 |
|
1-1/2" |
meter |
85.02 |
1.35 |
3.21 |
5.96 |
9.71 |
13.96 |
|
2" |
meter |
135.13 |
1.35 |
3.21 |
5.96 |
9.71 |
13.96 |
|
3" |
meter |
289.37 |
1.35 |
3.21 |
5.96 |
9.71 |
13.96 |
|
4" |
meter |
438.50 |
1.35 |
3.21 |
|||