Skip to main content
Loading…
This section is included in your selections.

The design and construction of all clearing, grading, and stormwater management systems and facilities shall comply with the requirements and design standards contained in Chapter 16.26 IMC, Clearing, Grading, and Stormwater Management. (Ord. 2783 § 2 (Exh. A2), 2016; Ord. 2560 § 2 (Exh. A1), 2009; Ord. 2288 § 2, 2000).