Chapter 22.400
PLATS OF SURVEY

Sections:

22.400.005    Requirements.

22.400.010    Filing a plat of survey.

22.400.005 Requirements.

A plat of survey may be filed whenever a survey establishes or marks on the ground one (1) or more corners, angle points or lines which do not appear on any map previously recorded or filed and which disclose any of the matters described in subdivisions (a) through (d) of Section 8762 of the Business and Professions Code. The plat shall conform to the requirements of Chapter 15 of Division 3 of the Business and Professions Code and this chapter, and shall be filed within ninety (90) days after the establishment or marking of the corners, angle points or lines. No plat of survey need be filed if the engineer or surveyor files a final map of a subdivision, a record of survey, or a final parcel map. [Ord. 7-2009 §3, eff. 5-1-2009; Ord. 2000-14A §1, eff. 10-25-2000; Ord. 2000-1 §1, eff. 7-1-2000]

22.400.010 Filing a plat of survey.

An engineer or surveyor who wishes to file a plat of survey shall submit the plat to the Director for review. The plat shall be neatly and legibly drawn, printed or reproduced on a transparency which will provide a legible print. The form and content of a plat shall be to the satisfaction of the Director, except that the engineer or surveyor shall be the sole judge of the technical form and content of a plat of survey and the Director may not impose requirements with regard to the interpretation of data, surveying methods, or accuracy. Any plat or survey submitted to the Director after being examined by him and found to comply with the requirements of this chapter shall be placed in the Department’s files as a permanent record. [Ord. 7-2009 §3, eff. 5-1-2009; Ord. 2000-14A §1, eff. 10-25-2000; Ord. 2000-1 §1, eff. 7-1-2000]