Chapter 19.32
IMPROVEMENT PLANS

Sections:

19.32.010    Preparation and Submission of Improvement Plans.

19.32.020    Review and Approval of Improvement Plans (California Government Code 66456.2).

19.32.030    Subdivider’s Responsibility.

19.32.010 Preparation and Submission of Improvement Plans.

A.    Plan Preparation. Plans, profiles and details for proposed subdivision improvements shall be prepared under the direction of and signed by a civil engineer registered in the State. Such improvement plans shall contain information and shall be in a format as specified by the City Engineer. A written listing of required improvement plan information and format shall be provided by the City Engineer on request.

B.    Plan Submission. Improvement plans shall be submitted to the City Engineer prior to submission of a final map. Plan check, inspection and other improvement plan fees shall be paid as required by resolution of the City Council. (Ord. 2023-22 § 829, 2023; Ord. 2001-18 § 2 (Exh. ZA-1) (part), 2001)

19.32.020 Review and Approval of Improvement Plans (California Government Code 66456.2).

The City Engineer shall review and act upon improvement plans in accordance with the time limits specified in California Government Code Section 66456.2. After review of submitted improvement plans, the City Engineer shall indicate any required revisions to the plans. Subsequently, upon finding that all required revisions have been completed and that the improvement plans are consistent with all tentative map conditions of approval, the General Plan, any applicable specific plans and this Subdivision Code, the City Engineer shall sign and date the plans. Upon such signing, improvement plans shall become property of the City. (Ord. 2023-22 § 830, 2023; Ord. 2001-18 §Ord. 2023-22 § 829, 2023; 2 (Exh. ZA-1) (part), 2001)

19.32.030 Subdivider’s Responsibility.

Approval of improvement plans shall in no way relieve the subdivider or the subdivider’s engineer of responsibility for the design of the improvements or from any deficiencies resulting from the design, nor from compliance with any tentative map condition of approval. (Ord. 2001-18 § 2 (Exh. ZA-1) (part), 2001)