Chapter 15.20
PLUMBING CODE

Sections:

15.20.010    Adoption of International Plumbing Code.

15.20.020    Amendments to International Plumbing Code.

15.20.010 Adoption of International Plumbing Code.

The International Plumbing Code, and applicable chapters of the International Residential Code as published by the International Code Council, and as amended and adopted by the State of Colorado Plumbing Board pursuant to Title 12, Article 58, C.R.S. (hereafter “IPC” or “International Plumbing Code”), is hereby adopted to regulate the design, construction, quality of materials, erection, installation, alteration, repair, location, relocation, replacement, addition to, use, and maintenance of plumbing systems.

(Ord. 4829, 1-16-19; Ord. 4499, 2-13-12; Ord. 4013, 1-3-07; Ord. 3318, 12-6-00. Code 1994 § 8-54)

State law reference(s) – Plumbers, § 12-58-101, C.R.S. et seq.; copies to be kept in office of the clerk, § 31-16-206, C.R.S.

15.20.020 Amendments to International Plumbing Code.

The plumbing code adopted in GJMC 15.20.010 is hereby amended as follows:

(a)    Section 106: 106.6.2, Fee schedule, is amended by the addition of the following:

A fee for each permit shall be as determined by City Council and set forth in a Resolution.

(b)    Section 106: 106.6.3, Fee refunds, is deleted as written and replaced with the following:

Building permit fees may be refunded at the rate of 85% of the building permit fee provided the project for which the permit was issued has not commenced and/or inspections have not been conducted. No refunds will be made after work has commenced or after 180 days of issuance.

(c)    Section 109: 109, Means of appeal, is amended by deleting as written and replacing with the following:

The Colorado State Plumbing Board serves as the Board of Appeals for the International Plumbing Code.

(Ord. 4829, 1-16-19; Ord. 4499, 2-13-12; Ord. 4013, 1-3-07; Ord. 3318, 12-6-00; Ord. 2812, 2-15-95. Code 1994 § 8-55; Code 1965 § 7-81(c))