Chapter 13.12
SEPTIC TANKS1

Sections:

13.12.010    Requirements generally.

13.12.020    Design and construction.

13.12.030    Permit fees.

13.12.010 Requirements generally.

A. All new septic systems to be installed in the city of Brier shall require a conditional use permit.

B. Any failed septic system that requires rebuilding or replacement requires a conditional use permit. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)

13.12.020 Design and construction.

All design criteria and construction of septic systems shall meet the requirements of and be approved by the Snohomish County health district. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)

13.12.030 Permit fees.

A. Application shall be made to Snohomish County health district. All fees and charges shall be paid to the health district.

B. A city of Brier side sewer connection permit shall be obtained prior to connecting to a septic system. The fee for a side sewer permit is established in BMC Title 3. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)


1

    Prior legislation: Ords. 24 and 24A.