Chapter 13.12
SEPTIC TANKS1
Sections:
13.12.010 Requirements generally.
13.12.020 Design and construction.
13.12.010 Requirements generally.
A. All new septic systems to be installed in the city of Brier shall require a conditional use permit.
B. Any failed septic system that requires rebuilding or replacement requires a conditional use permit. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)
13.12.020 Design and construction.
All design criteria and construction of septic systems shall meet the requirements of and be approved by the Snohomish County health district. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)
13.12.030 Permit fees.
A. Application shall be made to Snohomish County health district. All fees and charges shall be paid to the health district.
B. A city of Brier side sewer connection permit shall be obtained prior to connecting to a septic system. The fee for a side sewer permit is established in BMC Title 3. (Ord. 16.B § 1(part), 2000; Ord. 16.A § 2(part), 2000)
Prior legislation: Ords. 24 and 24A.