Chapter 12.40
TRANSPORTATION IMPACT FEES

Sections

12.40.010    Title.

12.40.020    Application.

12.40.030    Purpose and intent.

12.40.040    Authority.

12.40.050    Findings and authority.

12.40.060    Adopted by reference.

12.40.070    Definitions – Use of words and phrases.

12.40.080    Transportation impact fees established.

12.40.090    Establishment of service area.

12.40.100    Imposition of transportation impact fees on development activity.

12.40.110    Independent calculations.

12.40.120    Exemptions.

12.40.130    Credits for dedications and construction of improvements.

12.40.140    Disposition of transportation impact fee revenues.

12.40.150    Refunds.

12.40.155    Deferred payment of impact fees.

12.40.160    Appeals.

12.40.170    Existing authority unimpaired.

12.40.180    Administrative guidelines.

12.40.010 Title.

This chapter shall be entitled “Transportation Impact Fees.” [Ord. 1578 § 114, 2013.]

12.40.020 Application.

This chapter shall apply to all transportation impact fees. [Ord. 1578 § 115, 2013.]

12.40.030 Purpose and intent.

The purpose and intent of this chapter is for the collection of transportation impact fees for streets, and providing for certain other matters in connection therewith. [Ord. 1578 § 116, 2013.]

12.40.040 Authority.

This chapter is created pursuant to RCW 82.02.050 through 82.02.090. [Ord. 1578 § 117, 2013.]

12.40.050 Findings and authority.

The City Council hereby finds and determines that development activities, including but not limited to new residential, commercial, retail, office, and industrial development in the City will create additional transportation demand and need for public facilities in the City, and the City Council finds that such new growth and development should pay a proportionate share of the cost of new transportation facilities needed to serve the new growth and development. The City has conducted extensive research and analysis documenting the procedures for measuring the impact of new developments on public facilities, and has prepared a “Rate Study for Transportation Impact Fees, City of Des Moines,” dated August 17, 2009 (“rate study”). The rate study utilizes a methodology for calculating impact fees that fulfills all of the requirements of RCW 82.02.060(1). A copy of the rate study shall be kept on file with the City Clerk and is available to the public for review. Therefore, pursuant to chapter 82.02 RCW, the Council adopts this chapter to assess transportation impact fees for streets and roads. The provisions of this chapter shall be liberally construed in order to carry out the purposes of the Council in establishing the transportation impact fee program. [Ord. 1578 § 118, 2013.]

12.40.060 Adopted by reference.

The “Transportation Impact Fee Rate Study, Update, City of Des Moines,” dated February 2016, is hereby adopted as set forth in Exhibit A1, which is attached to the ordinance codified in this chapter, and incorporated herein by reference. [Ord. 1659 § 1, 2016: Ord. 1578 § 119, 2013.]

12.40.070 Definitions – Use of words and phrases.

As used in this chapter, unless the context or subject matter clearly requires otherwise, the words or phrases defined in this section shall have the indicated meanings. Terms otherwise not defined herein shall be defined pursuant to RCW 82.02.090, or given their usual and customary meaning.

“Accessory living quarters” is as defined in DMMC 18.01.050.

“Building permit” means an official document or certification which is issued by the Planning, Building and Public Works Director and which authorizes the construction, alteration, enlargement, conversion, reconstruction, remodeling, rehabilitation, erection, demolition, moving, or repair of a building or structure.

“Capital facilities plan” means the capital facilities element of the City Comprehensive Plan.

“City Comprehensive Plan” means the City of Des Moines Comprehensive Plan, adopted pursuant to chapter 36.70A RCW, and such plan as subsequently amended or revised.

“Department” means the City’s Planning, Building, and Public Works Department.

“Development activity” means any construction or expansion of a building, structure, or use, any change in use of a building or structure, or any change in the use of land, that generates at least one p.m. peak hour trip.

“Development approval” means any written authorization from the City which authorizes the commencement of a development activity.

“Dwelling” is as defined in DMMC 18.01.050.

“Encumbered” means to reserve, set aside, or otherwise earmark the transportation impact fees in order to pay for commitments, contractual obligations, or other liabilities incurred for public facilities.

“Feepayer” is a person, corporation, partnership, an incorporated association, or any other similar entity, or department or bureau of any governmental entity or municipal corporation commencing a development activity which creates the demand for additional system improvements and which requires the issuance of a permit for a given development activity. “Feepayer” includes an applicant for a transportation impact fee credit.

“GMA” means the Washington State Growth Management Act, codified as chapter 36.70A RCW, as now in existence, or as hereinafter amended.

“Hearing Examiner” means the Hearing Examiner of the City, pursuant to chapter 18.240 DMMC.

“Impact fee” means a payment of money imposed by the City upon development approval pursuant to this chapter as a condition of issuance of a permit for a given development activity to pay for public facilities needed to serve new growth and development, and to mitigate the impacts of the development activity on the transportation facilities of the City. “Impact fee” does not include a reasonable permit or application fee, an administrative fee for collecting and handling impact fees, or the cost of reviewing independent calculations.

“Independent calculation” means the street and road impact calculation, and/or economic documentation prepared by a feepayer, to support the assessment of a transportation impact fee other than by the rate listed in DMMC 12.40.100, the rate study, or the Department’s fee schedule; or the calculations prepared by the Planning, Building and Public Works Director where none of the land use categories or fee amounts in the rate study or the Department’s fee schedule accurately describe or capture the impacts of the development activity on public facilities.

“ITE Land Use Code” means the classification code number assigned to a type of land use by the Institute of Transportation Engineers in the most recent edition of the Trip Generation Manual, unless otherwise noted.

“Owner” means the owner of record of real property. If real property is being purchased under a real estate contract, the purchaser shall be considered the owner of the real property if the contract is recorded.

“Permit for change in land use” means an official document which is issued by the Planning, Building and Public Works Director which authorizes a change in use of an existing building, structure, or land that does not require a building permit.

“Planning, Building and Public Works Director” means the Planning, Building, and Public Works Director, or the Planning, Building and Public Works Director’s designee.

“P.M. peak hour” means the 60-minute period generally between 4:00 p.m. and 6:00 p.m. which experiences the highest volume of traffic on a road or street or passing through a road or street intersection.

“P.M. peak hour trips” means the total vehicular trips entering and leaving a place of development activity on the adjacent public road or street during the p.m. peak hour.

“Project improvements” means site improvements and facilities that are planned and designed to provide service for a particular development project and are necessary for the use and convenience of the occupants or users of the project, and are not system improvements. No improvement or facility included in a capital facilities plan adopted by the council shall be considered a project improvement.

“Public facilities,” as used in this chapter, refers to public streets, roads and rights-of-way owned or operated by the City or other governmental entities, including trails, paths, bikeways, other transportation facilities and all attendant improvements.

“Rate study” means the rate study identified in DMMC 12.40.060.

“Service area” means the transportation impact fee service area of the City identified in DMMC 12.40.090.

“System improvements” means public facilities that are included in the City’s capital facilities plan, and such plan as amended, and are designed to provide service to service areas within the community at large.

“Transportation facilities” means and refers to streets and roads, but includes all publicly owned streets, roads, alleys and rights-of-way within the City and street services, traffic control devices, curbs, gutters, sidewalks and related facilities and improvements. [Ord. 1578 § 120, 2013.]

12.40.080 Transportation impact fees established.

There is established, subject to the provisions of this chapter, a transportation impact fee program. [Ord. 1578 § 121, 2013.]

12.40.090 Establishment of service area.

(1) The City hereby establishes, as the service area for transportation impact fees, the City, including all property located within the corporate limits of the City.

(2) The scope of the service area is hereby found to be reasonable and established on the basis of sound planning and engineering principles, and consistent with RCW 82.02.060. [Ord. 1578 § 122, 2013.]

12.40.100 Imposition of transportation impact fees on development activity.

(1) The City hereby authorizes the assessment and collection of transportation impact fees on development activity within the City, based on the methodology described in the rate study. The maximum allowable transportation impact fee rate established by the rate study is $6,380. Instead of setting the base rate at this level, the base rate for the calendar year 2016 is established at $5,151.21 per new p.m. peak hour trip. The base transportation impact fee rate is subject to annual adjustment in accordance with subsection (5) of this section. Accordingly, using the methodology described in the rate study, the Department will annually update the fee schedule identified in the rate study, and make the fee schedule available for public use.

(2) The collection of transportation impact fees will be modified for those subareas of the Pacific Ridge Zone that are also subject to SEPA mitigation fees pursuant to Exhibit B of Ordinance No. 1298, as presently written or as subsequently amended or revised.2

(3) Transportation impact fee rates are based upon the formula for calculating the proportionate share of the cost of the system improvements, including the costs of previously constructed system improvements, necessitated by new development to be borne by transportation impact fees, which formulas are described in the rate study.

(4) The City Council may review the base transportation impact fee rate set forth in subsection (1) of this section at any time the City Council deems appropriate, including, but not limited to, the update of the capital facilities element of the City’s Comprehensive Plan, and the Council may adjust the transportation impact fee base rate as the Council deems just and appropriate, up to the maximum rate identified in the rate study.

(5) The Planning, Building and Public Works Department will annually adjust the transportation impact fee base rate based on the construction cost index for the Seattle area as reported in the Engineering News Record periodical, typically in March.

(6) For a change in use of an existing building or dwelling, including any alteration, expansion, replacement or new accessory living quarters, the net transportation impact fees shall be the applicable transportation impact fees calculated for the land use category of the new use, reduced by an amount equal to the current transportation impact fees calculated for the prior use.

(7) No reduction based on prior use shall be made for a vacant structure or a vacant property that once contained a structure if the structure or property had been vacant for more than 10 years.

(8) For mixed use developments, transportation impact fees shall be imposed for the proportionate share of each applicable land use.

(9) The transportation impact fees imposed pursuant to this chapter shall be assessed by the City. A preliminary assessment will be provided by the Department during the review and approval of a given development activity, typically a building permit application or a permit for a change in land use. A final assessment, based upon the transportation impact fee rate in effect as of the date the actual permit is issued, shall be made by the Department, and the fee shall be due and payable in full at the time of issuance of the permit. Failure to pay the transportation impact fees for a given development activity at the time that such transportation impact fees are due and payable shall result in denial of the permit for which the applicant has applied.

(10) Development activities that have been allowed credits prior to the submittal of the complete building permit application or an application for a permit for a change in land use shall submit, along with the complete application, a copy of the letter or certificate issued by the Planning, Building and Public Works Director pursuant to DMMC 12.40.130 setting forth the dollar amount and basis of the approved credit. The net transportation impact fees, as determined after the reduction of appropriate credits, shall be collected from the applicant in accordance with subsection (9) of this section.

(11) Where the transportation impact fees imposed are determined by the square footage of the development, the Department may at its discretion or at the written request of the feepayer review the constructed development prior to the issuance of a certificate of occupancy or an occupancy permit to confirm that the square footage of the constructed development is consistent with the square footage used to determine the final assessment and payment of the transportation impact fee. If the final square footage of the development is in excess of the square footage used to determine the final assessment and payment of the transportation impact fee, any difference will be due prior to the issuance of a certificate of occupancy or an occupancy permit, using the transportation impact fee rate in effect at that time. If the final square footage is less than the square footage used to determine the final assessment and payment of the transportation impact fee, the Department shall give a refund for the difference. [Ord. 1659 § 2, 2016: Ord. 1588 § 1, 2013: Ord. 1578 § 123, 2013.]

12.40.110 Independent calculations.

(1) If in the judgment of the Planning, Building and Public Works Director none of the land use categories or fee amounts set forth in the rate study or the Department’s fee schedule accurately describes or captures the impacts of a new development on roads, the Department may conduct independent calculations and the Planning, Building and Public Works Director may impose alternative fees on a specific development based on those calculations. The alternative fees and the calculations shall be set forth in writing and shall be mailed to the feepayer.

(2) A feepayer may opt not to have the impact fees determined according to the Department’s fee schedule identified in DMMC 12.40.100(1), in which case the feepayer shall prepare and submit to the Planning, Building and Public Works Director an independent calculation for the development activity for which a permit is being sought. The documentation submitted shall show the basis upon which the independent calculation was made. An independent calculation shall use the same methodology used to establish the transportation impact fee set forth in the rate study, shall be limited to adjustments in trip generation rates and lengths used in the rate study, and shall not include travel demand forecasts, trip distribution, transportation service areas, costs of road projects, or cost allocation procedures.

(3) Any feepayer submitting an independent calculation will be required to pay the City a fee to cover the cost of reviewing the independent calculation. The fee required by the City for conducting the review of the independent calculation shall be $500.00, unless otherwise established by the City Manager or the City Manager’s designee, and shall be paid by the feepayer prior to initiation of review.

(4) There is a rebuttable presumption that the calculations set forth in the rate study and the fees set forth in the Department’s fee schedule are valid. The Planning, Building and Public Works Director shall consider the documentation submitted by the feepayer, but is not required to accept such documentation or analysis which the Planning, Building and Public Works Director reasonably deems to be inapplicable, inaccurate, or not reliable. The Planning, Building and Public Works Director may require the feepayer to submit additional or different documentation for consideration. The Planning, Building and Public Works Director is authorized to adjust the transportation impact fees on a case-by-case basis based on the independent calculation, the specific characteristics of the development, and/or principles of fairness. The fees or alternative fees and the calculations shall be set forth in writing and shall be mailed to the feepayer.

(5) Determinations made by the Planning, Building and Public Works Director pursuant to this section shall be subject to the appeal procedures set forth in DMMC 12.40.160. [Ord. 1578 § 124, 2013.]

12.40.120 Exemptions.

(1) Except as provided for below, the following shall be exempted from the payment of transportation impact fees:

(a) Alteration or replacement of an existing structure that does not expand the usable space, add any residential units or generate any additional p.m. peak trips.

(b) Miscellaneous improvements which do not generate increased p.m. peak trips, including, but not limited to, fences, decks, walls, residential swimming pools, and signs.

(c) Demolition or moving of a structure when additional p.m. peak hour trips are not generated.

(d) A change of use that does not generate one or more p.m. peak hour trips.

(2) The Planning, Building and Public Works Director shall be authorized to determine whether a particular development activity falls within an exemption identified in this section or under other applicable law. Determinations of the Planning, Building and Public Works Director shall be in writing and shall be subject to the appeals procedures set forth in DMMC 12.40.160. [Ord. 1578 § 125, 2013.]

12.40.130 Credits for dedications and construction of improvements.

(1) A feepayer can request that a credit or credits for the value of system improvements, including dedications of land, improvements and/or construction provided by the feepayer, be applied toward the calculated transportation impact fee. The application for credits shall be presented by the feepayer on forms to be provided by the Department and shall include the content designated in such forms. Credits will be given only if the land, improvements, and/or the facility constructed are:

(a) Included within the capital facilities plan or would serve the goals and objectives of the capital facilities plan; and

(b) Are at suitable sites and constructed at acceptable quality as determined by the Planning, Building and Public Works Director; and

(c) Serve to offset impacts of the feepayer’s development activity; and

(d) Are for one or more of the transportation projects listed in the rate study as the basis for calculating the transportation impact fee.

(2) The transportation impact fee program shall provide credits for mitigation fees imposed under the State Environmental Policy Act (RCW 43.21C.060) and chapter 16.05 DMMC for system improvements identified in the comprehensive transportation plan as “intersection and roadway capacity improvement projects for the traffic impact fee program.”

(3) The Planning, Building and Public Works Director shall determine if requests for credits meet the criteria in subsection (1) or (2) of this section, or under other applicable law. Determinations of the Planning, Building and Public Works Director may be appealed pursuant to DMMC 12.40.160.

(4) Each request for a credit or credits shall include a legal description of the dedicated land, a detailed description of improvements or construction provided, and a legal description or other adequate description of the development to which the credit will be applied.

(5) For each request for a credit or credits, the Planning, Building and Public Works Director shall determine the value of the dedicated land, improvements, or construction on a case-by-case basis.

(6) In the event that the feepayer disagrees with the Planning, Building and Public Works Director’s valuation of the dedicated land, the feepayer may submit an appraisal for the Planning, Building and Public Works Director’s consideration, prepared by a state certified MAI (member of the American Institute of Appraisers) in accordance with the most recent version of the Uniform Standards of Professional Appraisal Practice. In the event that that feepayer disagrees with the Planning, Building and Public Works Director’s valuation of improvements or construction provided, the feepayer may submit a valuation for the Planning, Building and Public Works Director’s consideration, prepared by a licensed engineer. The appraiser and/or engineer must be licensed and in good standing pursuant to chapter 18.43 RCW et seq., in the category for the property and/or improvements to be appraised/valued, and shall not have a fiduciary or personal interest in the property being appraised.

(7) Appraisals and/or engineering valuations submitted by the feepayer shall be subject to review by the Planning, Building and Public Works Director and, at the Planning, Building and Public Works Director’s discretion, an independent review appraiser/engineer selected by the Planning, Building and Public Works Director. The feepayer shall pay for the actual costs for the appraisal/valuation and the independent review. An estimate of the appraisal and review costs will be prepared by the Department, and the feepayer shall pay the estimated costs prior to commencement of the appraisal and review. If the final cost of the appraisal and review is in excess of the initial estimate and payment, any difference will be due prior to the issuance of a letter or certificate from the Planning, Building and Public Works Director. If the final cost of the appraisal and review is less than the initial estimate and payment, the Department shall give a refund for the difference.

(8) After receiving and reviewing the appraisal, the Planning, Building and Public Works Director shall provide the applicant with a letter or certificate setting forth the dollar amount of any credit, the reason for the credit, the legal description of the real property dedicated where applicable, and the legal description or other adequate description of the project or development to which the credit may be applied. The feepayer must sign and date a duplicate copy of such letter or certificate indicating his/her agreement to the terms of the letter or certificate, and return such signed document to the Planning, Building and Public Works Director before the impact fee credit will be applied. The failure of the feepayer to sign, date, and return such document within 60 calendar days shall nullify the credit. If credit is denied, the feepayer shall be notified in a letter that includes the reasons.

(9) If the total value of any credit for such dedication, improvement or construction costs exceeds the amount of the transportation impact fee obligation, the developer will not be entitled to reimbursement of the difference.

(10) No credit shall be given for project improvements.

(11) Any claim for credit must be made no later than 14 calendar days after the submission of an application for a building permit or an application for a permit for a change in use. The failure to timely file such a claim shall constitute a final bar to later request any such credit.

(12) Determinations made by the Planning, Building and Public Works Director pursuant to this section shall be subject to the appeals procedures set forth in DMMC 12.40.160. [Ord. 1578 § 126, 2013.]

12.40.140 Disposition of transportation impact fee revenues.

(1) The transportation impact fees collected pursuant to the provisions of this chapter shall be deposited into a transportation impact fee fund. Pending application as provided in this chapter, the moneys deposited in the transportation impact fee fund shall be invested in any investment authorized for the investment of City funds. All interest and profits derived from the investment of moneys in each account in the transportation impact fee fund shall be retained in such account.

(2) The transportation impact fees deposited in each account in the transportation impact fee fund and the interest and profit received from the investments therefrom shall be expended only for system improvements for which such transportation impact fees were collected, in conformity with the City Comprehensive Plan and comprehensive transportation plan, and expended or encumbered within six years of receipt by the City, unless written findings by the City Council identify an extraordinary and compelling reason for the City to hold the fees for a longer time. The City shall account for annual expenditures and shall comply with this section in successive comprehensive plans, transportation plans and capital facilities plans as appropriate.

(3) The transportation impact fees may also be used to recoup system improvement costs previously incurred by the City to the extent that new growth and development will be served by the previously constructed improvements or incurred costs.

(4) In the event that bonds or similar debt instruments are or have been issued for the advanced provision of system improvements for which transportation impact fees may be expended, transportation impact fees may be used to pay debt service on such bonds or similar debt instruments to the extent that the facilities or improvements provided are consistent with the requirements of this section and are used to serve the new development.

(5) The City shall prepare an annual report on the transportation impact fee fund which shows the source and amount of all moneys collected, earned or received and the public facilities that were financed in whole or in part by impact fees. [Ord. 1578 § 127, 2013.]

12.40.150 Refunds.

(1) The City shall, in accordance with RCW 82.02.080, refund to the current owners of property on which a transportation impact fee has been paid any transportation impact fees paid with respect to such property that has not been expended or encumbered for public facilities of the type of which such transportation impact fees were collected.

(2) The City shall also refund to the current owner of property on which a transportation impact fee has been paid all transportation impact fees paid with respect to such property if the development activity for which the transportation impact fee was imposed did not occur and no impact has resulted.

(3) If some, but not all, of the development activity for which the transportation impact fee was imposed occurred, the transportation impact will be deemed to have occurred, and no refund will be payable; provided, however, that the property on which the transportation impact fee was paid shall be eligible to receive a credit toward any subsequent development activity on the property up to the full amount of the payment.

(4) Owners seeking a refund of transportation impact fees must submit a written request for a refund of transportation impact fees to the Planning, Building and Public Works Director or designee within one year of the date the right to claim the refund arises, which, for purposes of refund claims authorized pursuant to subsection (2) of this section only, shall be the date of voluntary or involuntary abandonment of the permit, or the date that notice is given as provided in subsection (1) of this section, whichever occurs later. Refunds of transportation impact fees shall not include interest or any profits earned on the transportation impact fees from the date of their receipt to the date of refund. Any transportation impact fees not expended within the time limitations, and for which no application for a refund has been made within the one-year claim period, shall be retained by the City and expended on system improvements for which such transportation impact fees were initially collected, without further limitation as to the time of expenditure. [Ord. 1578 § 128, 2013.]

12.40.155 Deferred payment of impact fees.

Impact fees required in this chapter may be deferred as provided in Title 3 DMMC. [Ord. 1657 § 2, 2016.]

12.40.160 Appeals.

(1) The determination of the Planning, Building and Public Works Director or designee regarding the applicability of the transportation impact fee to a given development activity within the service area shall be final; however, an owner may pay a transportation impact fee imposed pursuant to this chapter under protest in order to obtain a permit and, after such payment, file an appeal regarding the amount of the transportation impact fee or a determination made pursuant to DMMC 12.40.110, 12.40.120 or 12.40.140 to the Hearing Examiner pursuant to DMMC 18.20.150 and 18.20.160 and chapter 18.240 DMMC.

(2) Appeal regarding the amount of the transportation impact fee imposed on any development activity may only be made by the owner of the property where such development activity shall occur. [Ord. 1578 § 129, 2013.]

12.40.170 Existing authority unimpaired.

Nothing in this chapter shall preclude the City from requiring the applicant to mitigate adverse environmental impacts of a specific development pursuant to the State Environmental Policy Act, chapter 43.21C RCW, based on the environmental documents accompanying the underlying development approval process, and/or chapter 58.17 RCW governing plats and subdivisions; provided, that the exercise of this authority is consistent with the provisions of chapters 43.21C and 82.02 RCW. [Ord. 1578 § 130, 2013.]

12.40.180 Administrative guidelines.

The Planning, Building and Public Works Director shall be authorized to adopt internal guidelines for the administration of transportation impact fees, which may include the adoption of standard operating procedures and administrative policy for transportation impact fees. [Ord. 1578 § 131, 2013.]


1

Code reviser’s note: The exhibit is on file with the City Clerk.


2

Code reviser’s note: The exhibit is on file with the City Clerk.