Chapter 12.26
WASTEWATER PRETREATMENT REGULATIONS

Sections:

12.26.010    Purpose and policy.

12.26.020    Administration.

12.26.030    Abbreviations.

12.26.040    Definitions.

12.26.050    Prohibited discharge standards.

12.26.060    National categorical pretreatment standards.

12.26.070    State pretreatment standards.

12.26.080    Local limits.

12.26.090    City of Othello’s right of revision.

12.26.100    Dilution.

12.26.110    Pretreatment facilities.

12.26.120    Additional pretreatment measures.

12.26.130    Accidental discharge—Slug discharge control plans.

12.26.140    Hauled wastewater.

12.26.150    Industrial user surveys.

12.26.160    Wastewater discharge permit requirement.

12.26.170    Wastewater discharge permitting—Existing connections.

12.26.180    Wastewater discharge permitting—New connections.

12.26.190    Wastewater discharge permit application contents.

12.26.200    General permits.

12.26.210    Application signatories and certifications.

12.26.220    Wastewater discharge permit decisions.

12.26.230    Wastewater discharge permit duration.

12.26.240    Wastewater discharge permit contents.

12.26.250    Permit issuance process.

12.26.260    Wastewater discharge permit modification.

12.26.270    Wastewater discharge permit transfer.

12.26.280    Wastewater discharge permit revocation.

12.26.290    Wastewater discharge permit reissuance.

12.26.300    Regulation of waste received from other jurisdictions.

12.26.310    Baseline monitoring reports.

12.26.320    Compliance schedule progress reports.

12.26.330    Reports on compliance with categorical pretreatment standard deadline.

12.26.340    Periodic compliance reports.

12.26.350    Reports of changed conditions.

12.26.360    Reports of potential problems.

12.26.370    Reports from unpermitted users.

12.26.380    Notice of violation/repeat sampling and reporting.

12.26.390    Notification of the discharge of hazardous waste.

12.26.400    Analytical requirements.

12.26.410    Sample collection.

12.26.420    Date of receipt of reports.

12.26.430    Record keeping.

12.26.440    Certification statements.

12.26.450    Right of entry—Inspection and sampling.

12.26.460    Search warrants.

12.26.470    Confidential information.

12.26.480    Publication of users in significant noncompliance.

12.26.490    Administrative enforcement remedies.

12.26.500    Notification of violation.

12.26.510    Consent orders.

12.26.520    Show cause hearing.

12.26.530    Compliance orders.

12.26.540    Cease and desist orders.

12.26.550    Administrative fines.

12.26.560    Emergency suspensions.

12.26.570    Termination of discharge.

12.26.580    Injunctive relief.

12.26.590    Civil penalties.

12.26.600    Remedies nonexclusive.

12.26.610    Penalties for late reports.

12.26.620    Performance bonds.

12.26.630    Liability insurance.

12.26.640    Payment of outstanding fees and penalties.

12.26.650    Water supply severance.

12.26.660    Public nuisances.

12.26.670    Contractor listing.

12.26.680    Upset.

12.26.690    Prohibited discharge standards.

12.26.700    Bypass.

12.26.710    Charges for strong waste.

12.26.720    Miscellaneous.

12.26.730    Pretreatment charges and fees.

12.26.740    Severability.

12.26.010 Purpose and policy.

This pretreatment sewer chapter sets clear standards and requirements for any person served by the publicly owned treatment works (POTW) of the city of Othello and the means by which such requirements will be imposed and enforced. This chapter is intended to:

(a)    Prevent any discharge to the sanitary sewer which could:

(1)    Damage the transmission or treatment systems,

(2)    Interfere with the POTW’s operation,

(3)    Be incompatible with the POTW’s biological processes,

(4)    Pass through the treatment plant at levels which may harm the environment, and

(5)    Threaten the health and safety of city employees and the public.

(b)    Enable the city of Othello to run a pretreatment program that meets Washington State rules in Chapter 173-216 WAC, federal rules of 40 CFR Part 403, conditions of its national pollutant discharge elimination system (NPDES) permit, sludge use and disposal requirements, and any other federal or state laws to which the POTW is subject.

(c)    Promote reuse and recycling of industrial wastewater and sludge from the POTW.

(d)    Provide for fees for the equitable distribution of the cost of operation, maintenance, and improvement of the POTW.

This chapter shall apply to all persons connected (or believed connected) to the sanitary sewer collection system. This chapter compels the production of information, authorizes the issuance of wastewater discharge permits; provides for monitoring, compliance, and enforcement activities; establishes administrative review procedures; requires user reporting; and provides for the setting of fees for the equitable distribution of costs resulting from the program established herein. (Ord. 1367 § 1 (part), 2012).

12.26.020 Administration.

Except as otherwise provided herein, the public works director shall administer, implement, and enforce the provisions of this chapter. Any powers granted to or duties imposed upon the public works director may be delegated by the public works director to other city of Othello personnel or representatives. (Ord. 1367 § 1 (part), 2012).

12.26.030 Abbreviations.

The following abbreviations, when used in this chapter, shall have the designated meanings:

BOD:

Biochemical Oxygen Demand

BMP:

Best Management Practice

CFR:

Code of Federal Regulations

CIU:

Categorical Industrial User

EPA:

U.S. Environmental Protection Agency

gpd:

gallons per day

mg/l:

milligrams per liter

NPDES:

National Pollutant Discharge Elimination System

NSCIU:

Nonsignificant Categorical Industrial User

POTW:

Publicly Owned Treatment Works

RCRA:

Resource Conservation and Recovery Act

SIU:

Significant Industrial User

TSS:

Total Suspended Solids

U.S.C.:

United States Code

(Ord. 1367 § 1 (part), 2012).

12.26.040 Definitions.

Unless a provision explicitly states otherwise, the following terms and phrases, as used in this chapter, shall have the meanings hereinafter designated.

(a)    “Act” or “the Act” means the Federal Water Pollution Control Act, also known as the Clean Water Act, as amended, 33 U.S.C. Section 1251 on.

(b)    “Approval authority” means the Washington State Department of Ecology, Water Quality Program Manager.

(c)    “Authorized or duly authorized representative of the user” means:

(1)    If the user is a corporation:

(A)    The president, secretary, treasurer, or a vice president of the corporation in charge of a principal business function, or any other person who performs similar policy or decision making functions for the corporation; or

(B)    The manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiate and direct other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; can ensure that the necessary systems are established or actions taken to gather complete and accurate information for control mechanism requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

(2)    If the user is a partnership or sole proprietorship:

(A)    A general partner or proprietor, respectively.

(3)    If the user is a federal, state, or local governmental facility:

(A)    A director or highest official appointed or designated to oversee the operation and performance of the activities of the government facility, or their designee.

(4)    The individuals described in subsections (c)(1) through (3) of this section may designate another authorized representative if the authorization is in writing, the authorization specifies the individual or position responsible for the overall operation of the facility from which the discharge originates or having overall responsibility for environmental matters for the company, and the written authorization is submitted to the city of Othello.

(d)    “Biochemical oxygen demand” or “BOD” means the quantity of oxygen utilized in the biochemical oxidation of organic matter under standard laboratory procedures for five days at twenty degrees centigrade, usually expressed as a concentration (e.g., mg/l).

(e)    “Best management practices” or “BMPs” means schedules of activities, prohibitions of practices, maintenance procedures, and other management practices to implement the prohibitions listed in Section 12.26.050(a) and (b) (40 CFR 403.5(a)(1) and (b)). BMPs may also include treatment requirements, operating procedures, and practices to control plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw materials storage.

(f)    “Categorical pretreatment standard” or “categorical standard” means any regulation containing pollutant discharge limits promulgated by EPA in accordance with Sections 307(b) and (c) of the Act (33 U.S.C. Section 1317) which apply to a specific category of users and which appear in 40 CFR Chapter I, Subchapter N, Parts 405 through 471.

(g)    “Categorical industrial user” means an industrial user subject to a categorical pretreatment standard or categorical standard.

(h)    “City of Othello” means the city of Othello or the city council of the city of Othello.

(i)    “Composite sample” means a representative composite of samples of a wastestream taken throughout the period of a day when discharges are produced by a regulated activity. Composite samplers shall interface with a flow metering device to produce a representative “flow proportionate” composite sample unless the public works director has determined that flow proportionate samples are not required or the analyte is not amenable to composite sampling (pH, temperature, oil, etc.).

(j)    “Daily concentration” means the concentration obtained through analysis of a composite sample of all discharges over a day (or twenty-four-hour period) or the average of all discrete samples taken over such period.

(k)    “Daily limit (maximum daily limit)” means the maximum allowable discharge of a pollutant over a calendar day or equivalent twenty-four-hour period. Where daily limits are expressed in units of mass, compliance is the product of the daily concentration and the flow over the same period.

(l)    “Environmental Protection Agency (EPA)” means the U.S. Environmental Protection Agency or, where appropriate, the regional water management division director, the regional administrator, or other duly authorized official.

(m)    “Existing source” means any source of discharges subject to categorical standards and discharging prior to the promulgation of those standards or otherwise not meeting the definition of a “new source” in this section.

(n)    “Grab sample” means a sample which is taken from a wastestream without regard to the flow in the wastestream and over a period of time not to exceed fifteen minutes.

(o)    “Indirect discharge” or “discharge” means the introduction of pollutants into the POTW from any nondomestic source subject to this chapter or other state or federal regulations.

(p)    “Instantaneous limit” means the maximum concentration of a pollutant allowed to be discharged at any time, determined from the analysis of a discrete sample. For analytes for which users shall take a grab sample for compliance purposes, this standard is the same as the daily maximum standard. For all other pollutants the instantaneous limit shall be twice the daily limit.

(q)    “Interference” means a discharge which causes (either by itself or in combination with other discharges) a violation of the city of Othello’s NPDES permit or prevents the intended sewage sludge use or disposal by inhibiting or disrupting the POTW, including its collection systems, pump stations, and wastewater and sludge treatment processes. For example, a discharge from a user which causes a blockage resulting in a discharge at a point not authorized under the city of Othello’s NPDES permit.

(r)    “Local limits” means effluent limitation developed for users by the public works director to specifically protect the POTW from the potential of pass-through, interference, and intended biosolids uses. Such limits shall be based on the POTW’s site specific flow and loading capacities, receiving water considerations, and reasonable treatment expectations for nondomestic wastewater. See Section 12.26.080 for a full list of local limits.

(s)    “Medical waste” means isolation wastes, infectious agents, human blood and blood products, pathological wastes, sharps, body parts, contaminated bedding, surgical wastes, potentially contaminated laboratory wastes, and dialysis wastes.

(t)    “Monthly average” means the arithmetic mean of the effluent sample results collected during a calendar month or specified thirty-day period. Where the control authority has taken a sample during the period, it shall be included in the monthly average if provided in time. However, where composite samples are required, grab samples taken for process control or by the control authority are not to be included in a monthly average.

(u)    “Monthly average limit” means the limit to be applied to the monthly average to determine compliance with the requirements of this chapter (see Section 12.26.080 for listing).

(v)    “New source” means:

(1)    A facility whose construction began after categorical pretreatment standards applicable to its operations were proposed and with a real or potential discharge provided the facility is: (A) constructed at a site at which no other source is located; (B) totally replaces the process or production equipment that generate regulated process wastestreams at an existing source; or (C) the new processes are substantially independent of an existing source at the same site.

(2)    Construction at an existing source does not make the source a new source if the construction merely alters, partially replaces, or adds to existing process or production equipment.

(3)    Construction of a new source is considered to have begun when the owner or operator either began significant site preparation work including earthwork or removal of structures to allow the new facilities or equipment, began constructing a facility or emplacing equipment, or entered into a binding contract to purchase necessary facilities or equipment within a reasonable time prior to operation.

Users shall provide documentation sufficient to conclusively substantiate any existing source claim with their initial permit application. Once categorized as a new source, users may not assert “existing source” status in subsequent permit renewals.

(w)    “Noncontact cooling water” means water used for cooling which does not come into direct contact with any raw material, intermediate product, waste product, or finished product.

(x)    “Pass-through” means a discharge which exits the POTW into waters of the United States in quantities or concentrations which, alone or in conjunction with a discharge or discharges from other sources, is a cause of a violation of any requirement of the city of Othello’s NPDES permit, including an increase in the magnitude or duration of a violation.

(y)    “Person” means any individual, partnership, co-partnership, firm, company, corporation, association, joint stock company, trust, estate, governmental entity, or any other legal entity; or their legal representatives, agents, or assigns. This definition includes all federal, state, and local governmental entities.

(z)    “pH” means a measure of the acidity or alkalinity of a solution, expressed in standard units.

(aa)    “Pollutant” means dredged spoil, solid waste, incinerator residue, filter backwash, sewage, garbage, sewage sludge, munitions, medical wastes, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand, cellar dirt, municipal, agricultural and industrial wastes, and certain characteristics of wastewater (e.g., pH, temperature, TSS, turbidity, color, BOD, carbonaceous oxygen demand, toxicity, or odor).

(bb)    “Pretreatment” means the reduction of the amount of pollutants, the elimination of pollutants, or the alteration of the nature of pollutant properties in wastewater prior to, or in lieu of, introducing such pollutants into the POTW. Dilution is not considered pretreatment.

(cc)    “Pretreatment requirements” means any substantive or procedural requirement related to pretreatment imposed on a user other than a pretreatment standard such as the proper operation of pretreatment devices, record keeping, and reporting.

(dd)    “Pretreatment standards” or “standards” means discharge prohibitions (Section 12.26.050), categorical pretreatment standards (Section 12.26.060), state pretreatment standards (Section 12.26.070), local limits (Section 12.26.080), and site specific limits based on potential for vapor toxicity, explosion, sewer corrosion, or other detrimental effects to the POTW.

(ee)    “Publicly owned treatment works (POTW)” means a treatment works, as defined by Section 212 of the Act (33 U.S.C. Section 1292), which is owned by the city of Othello. This definition includes any devices or systems used in the collection, storage, treatment, recycling, and reclamation of sewage or industrial wastes of a liquid nature and any conveyances which convey wastewater to a treatment plant.

(ff)    “Septic tank waste” means sewage and typically associated solids from domestic activities pumped from a septic tank serving one or more private residences. The public works director may also consider wastes from other holding tanks such as boat blackwater, bilge water, cesspools, and treatment lagoons to be septic tank waste so long as they are absent chemicals which might inhibit biological activity.

(gg)    “Sewage” means human excrement and gray water (from household showers, toilets, kitchens, clothes and dish washing, and related domestic activities).

(hh)    Significant Industrial User (SIU). Except as provided in subsections (hh)(3) and (4) of this section, a significant industrial user is:

(1)    A user subject to categorical pretreatment standards; or

(2)    A user that:

(A)    Discharges an average of twenty-five thousand gpd or more of process wastewater to the POTW (excluding sanitary, noncontact cooling, and boiler blowdown wastewater);

(B)    Contributes a process wastestream which makes up five percent or more of the average dry weather hydraulic or organic capacity of the POTW treatment plant; or

(C)    Is designated as such by the city of Othello on the basis that it has a reasonable potential for adversely affecting the POTW’s operation or for violating any pretreatment standard or requirement;

(3)    The city of Othello may determine that a user subject to categorical pretreatment standards is a nonsignificant categorical industrial user rather than a significant industrial user on a finding that the user never discharges more than one hundred gallons per day (gpd) of total categorical wastewater (excluding sanitary, noncontact cooling and boiler blowdown wastewater, unless specifically included in the pretreatment standard) and the following conditions are met:

(A)    The user, prior to city of Othello’s finding, has consistently complied with all applicable categorical pretreatment standards and requirements;

(B)    The user annually submits the certification statement required in Section 12.26.440(b) (see 40 CFR 403.12(q)), together with any additional information necessary to support the certification statement; and

(C)    The user never discharges any untreated concentrated wastewater;

(4)    Upon a finding that a user meeting the criteria in subsection (hh)(2) of this section has no reasonable potential for adversely affecting the POTW’s operation or for violating any pretreatment standard or requirement, the city of Othello may at any time, on its own initiative or in response to a petition received from a user, and in accordance with procedures in 40 CFR 403.8(f)(6), determine that such user should not be considered a significant industrial user.

(ii)    “Slug load” or “slug discharge” means any discharge of a nonroutine, episodic nature, including but not limited to an accidental spill or a noncustomary batch discharge, which has a reasonable potential to cause interference or pass-through, or in any other way violate the POTW’s regulations, local limits or permit conditions. This includes discharges at a flow rate or concentration which could cause a violation of the prohibited discharge standards of Section 12.26.050.

(jj)    “Storm water” means any flow occurring during or following any form of natural precipitation, and resulting from such precipitation, including snow melt.

(kk)    “Public works director” means the person designated by the city of Othello to supervise the operation of the POTW, and who is charged with certain duties and responsibilities by this chapter. The term also means a duly authorized representative of the public works director.

(ll)    “Suspended solids” means the total suspended matter that floats on the surface of, or is suspended in, water, wastewater, or other liquid, and which is removable by laboratory filtering.

(mm)    “User” or “industrial user” means a source of indirect discharge.

(nn)    “Wastewater” means liquid- and water-carried industrial wastes and sewage from residential dwellings, commercial buildings, industrial and manufacturing facilities, and institutions, whether treated or untreated, which are contributed to the POTW.

(oo)    “Wastewater treatment plant” or “treatment plant” means that portion of the POTW which is designed to provide treatment of municipal sewage and industrial waste. (Ord. 1367 § 1 (part), 2012).

12.26.050 Prohibited discharge standards.

(a)    General Prohibitions. No user shall introduce or cause to be introduced into the POTW any pollutant or wastewater which causes pass-through or interference. These general prohibitions apply to all users of the POTW whether or not they are subject to categorical pretreatment standards or any other national, state, or local pretreatment standards or requirements.

(b)    Specific Prohibitions. No user shall introduce or cause to be introduced into the POTW the following pollutants, substances, or wastewater:

(1)    Pollutants which either alone or by interaction may create a fire or explosive hazard in the POTW, a public nuisance or hazard to life, or prevent entry into the sewers for their maintenance and repair or are in any way injurious to the operation of the system or operating personnel. This includes wastestreams with a closed cup flashpoint of less than one hundred forty degrees F (sixty degrees C) using the test methods specified in 40 CFR 261.21.

(2)    Wastewater having a pH less than 5.0 or more than 11.0, or otherwise having any other corrosive property capable of causing damage or hazard to structures, equipment, or personnel. Discharges outside this pH range may be authorized by a permit issued by the city of Othello pursuant to a finding that the system is specifically designed to accommodate a discharge of that pH.

(3)    Solid or viscous substances in amounts which may cause obstruction to the flow in the sewer or other interference with the operation of the system. In no case shall solids greater than one-quarter inch (0.64 cm) in any dimension be discharged.

(4)    Pollutants, including oxygen demanding pollutants (BOD, etc.), released in a discharge at a flow rate and/or pollutant concentration which, either singly or by interaction with other pollutants, will cause interference with the POTW.

(5)    Wastewater having a temperature which will interfere with the biological activity in the system, has detrimental effects on the collection system, or prevents entry into the sewer. In no case shall wastewater be discharged which causes the wastewater temperature at the treatment plant to exceed one hundred four degrees F (forty degrees C).

(6)    Petroleum oil, nonbiodegradable cutting oil, or products of mineral oil origin, in amounts that will cause interference or pass-through.

(7)    Pollutants which result in the presence of toxic gases, vapors, or fumes within the POTW in a quantity that may cause acute worker health and safety problems.

(8)    Trucked or hauled pollutants, except at discharge points designated by the public works director in accordance with Section 12.26.140.

(9)    The following are prohibited unless approved by the public works director under extraordinary circumstances, such as lack of direct discharge alternatives due to combined sewer service or need to augment sewage flows due to septic conditions (as required under WAC 173-216-060):

(A)    Noncontact cooling water in significant volumes.

(B)    Stormwater, or other direct inflow sources.

(C)    Wastewaters significantly affecting system hydraulic loading, which do not require treatment or would not be afforded a significant degree of treatment by the system.

(10)    Noxious or malodorous liquids, gases, solids, or other wastewater which, either singly or by interaction with other wastes, are sufficient to create a public nuisance or a hazard to life, or to prevent entry into the sewers for maintenance or repair.

(11)    Wastewater which imparts color which cannot be removed by the treatment process, such as, but not limited to, dye wastes and vegetable tanning solutions, which consequently imparts color to the treatment plant’s effluent, thereby violating the city of Othello’s NPDES permit.

(12)    Wastewater containing any radioactive wastes or isotopes except in compliance with applicable state or federal regulations.

(13)    Storm water, surface water, ground water, artesian well water, roof runoff, subsurface drainage, swimming pool drainage, condensate, deionized water, noncontact cooling water, and unpolluted wastewater, unless specifically authorized by the public works director.

(14)    Sludges, screenings, or other residues from the pretreatment of industrial wastes.

(15)    Medical wastes, except as specifically authorized by the public works director in a wastewater discharge permit.

(16)    Wastewater causing, alone or in conjunction with other sources, the treatment plant’s effluent to fail toxicity test.

(17)    Detergents, surface active agents, or other substances which may cause excessive foaming in the POTW.

(18)    Fats, oils, or greases of animal or vegetable origin in concentrations greater than three hundred mg/l, or total petroleum hydrocarbon concentrations of no more than one hundred mg/l.

(19)    Wastewater causing two readings on an explosion hazard meter at the point of discharge into the POTW, or at any point in the POTW, of more than ten percent or any single reading over twenty percent of the lower explosive limit based on an explosivity meter reading.

Pollutants, substances, or wastewater prohibited by this section shall not be processed or stored in such a manner that they could be discharged to the POTW. (Ord. 1400 § 9 (part), 2014: Ord. 1367 § 1 (part), 2012).

12.26.060 National categorical pretreatment standards.

The categorical pretreatment standards found at 40 CFR Chapter I, Subchapter N, Parts 405 through 471 are hereby incorporated.

(a)    Where a categorical pretreatment standard is expressed only in terms of either the mass or the concentration of a pollutant in wastewater, the public works director may impose equivalent concentration or mass limits in accordance with subsections (e) and (f) of this section (see 40 CFR 403.6(c)).

(b)    When categorical pretreatment standards are expressed in terms of a mass of pollutant which may be discharged per unit of production, the public works director may either impose limits based on mass or equivalent effluent concentrations. The user shall supply appropriate actual or projected long-term production rates for the unit of production specified in order to facilitate this process. (See 40 CFR 403.6(c)(2).)

(c)    The public works director may allow wastewater subject to a categorical pretreatment standard to be mixed with other wastewaters prior to treatment. In such cases, the user shall identify all categorical wastestreams and provide sufficient information on each noncategorical wastestream to determine whether it should be considered dilute for each pollutant. Absent information showing that noncategorical wastestreams contain the pollutant in question at levels above that of the supply water, such wastestreams shall be considered dilute. In such situations, the public works director shall apply the combined wastestream formula as found at 40 CFR 403.6(e) to determine appropriate limits.

(d)    A CIU may request an adjustment to a categorical standard to reflect the presence of pollutants in the industrial user’s intake water when its water source is from the same body of water that the POTW discharges into.

(1)    Any CIU wishing to obtain credit for intake pollutants shall include, in their permit application, sample data showing influent water pollutant levels which form the basis for the credit requested in their permit application.

(2)    Unless the categorical standard was written to be applied on a net basis, the information supplied by the CIU shall also demonstrate that the treatment system it proposes or uses to meet the categorical standards would, if properly installed and operated, meet the standards in the absence of pollutants in the intake waters.

(3)    In response to an acceptable application, the public works director may adjust the categorical standards to the extent necessary to meet the applicable categorical pretreatment standard(s), up to a maximum value equal to the influent pollutant concentration.

(4)    The public works director may waive the requirement for the intake water to be drawn from the same body of water the POTW discharges to if the public works director determines that no environmental degradation will result.

(e)    When a categorical pretreatment standard is expressed only in terms of pollutant concentrations, an industrial user may request that the city of Othello convert the limits to equivalent mass limits. The city of Othello may establish equivalent mass limits if the industrial user meets all of the conditions set forth below.

(1)    To be eligible for equivalent mass limits, the industrial user shall submit information with its permit application or permit modification request which:

(A)    Shows it has a pretreatment system which has consistently met all applicable pretreatment standards and maintained compliance without using dilution.

(B)    Describes the water conserving practices and technologies it employs, or will employ, to substantially reduce water use during the term of its permit.

(C)    Includes the facility’s actual average daily flow rate for all wastestreams from continuous effluent flow metering.

(D)    Determines an appropriate unit of production, and provides the present and long-term average production rates for this unit of production.

(E)    Shows that long-term average flow and production are representative of current operating conditions.

(F)    Shows that its daily flow rates, production levels, or pollutant levels do not vary so much that equivalent mass limits would be inappropriate.

(G)    Shows the daily and monthly average pollutant allocations currently provided based on the proposed unit of production.

(2)    An industrial user subject to equivalent mass limits shall:

(A)    Maintain and effectively operate control and treatment technologies adequate to achieve compliance with the equivalent mass limits.

(B)    Continue to record the facility’s flow by continuous effluent flow monitoring.

(C)    Continue to record the facility’s production rates.

(D)    Notify the public works director if production rates are expected to vary by more than twenty percent from the baseline production rates submitted according to subsection (e)(1)(D) of this section. The public works director may reassess and revise equivalent limits as necessary to reflect changed conditions.

(E)    Continue to employ the same or comparable water conservation methods and technologies as those implemented pursuant to subsection (e)(1)(B) of this section so long as it discharges under an equivalent mass limit.

(3)    Equivalent mass limits:

(A)    Will not exceed the product of the actual average daily flow from regulated process(es) of the user and the applicable concentration based daily maximum and monthly average standards (and the appropriate unit conversion factor);

(B)    May be reassessed and the permit revised upon notification of a revised production rate, as necessary to reflect changed conditions at the facility; and

(C)    May be retained in subsequent permits if the user’s production basis and other information submitted in subsection (e)(1) of this section is verified in their reapplication. The user shall also be in compliance with Section 12.26.700 regarding the prohibition of bypass.

(f)    The public works director may convert the mass limits of the categorical pretreatment standards of 40 CFR Parts 414 (organic chemicals), 419 (petroleum refining), and 455 (pesticide formulating, packaging and repackaging) to concentration limits in permits for such users. In such cases, the public works director will document the basis and the determination that dilution is not being substituted for treatment in the permit fact sheet.

(g)    The public works director is obliged under federal regulations to make the documentation of how any equivalent limits were derived (concentration to mass limits or vice versa) publicly available.

(h)    Once incorporated into its permit, the user shall comply with the equivalent limits in lieu of the categorical standards from which they were derived.

(i)    The same production and flow estimates shall be used in calculating equivalent limits for the monthly (or multiple day average) and the maximum day.

(j)    Users subject to permits with equivalent mass or concentration limits calculated from a production based standard shall notify the public works director if production will significantly change. This notification is required within two business days after the user has a reasonable basis to know that that production will significantly change in the next calendar month. Users who fail to notify the public works director of such anticipated changes shall meet the more stringent of the equivalent limits or the user’s prior limits. (Ord. 1367 § 1 (part), 2012).

12.26.070 State pretreatment standards.

Washington State pretreatment standards and requirements, located at Chapter 173-216 WAC, were developed under authority of the Water Pollution Control Act, Chapter 90.48 RCW and are hereby incorporated. The version incorporated is the version current as of the date of the latest revision or version of this chapter. All waste materials discharged from a commercial or industrial operation into the POTW shall satisfy the provisions of Chapter 173-216 WAC. In addition to some slightly more stringent prohibitions (merged with Section 12.26.050), the following provisions unique to Washington State are required by this chapter for discharges to a POTW:

(a)    Any person who constructs or modifies or proposes to construct or modify wastewater treatment facilities shall first comply with the regulations for submission of plans and reports for construction of wastewater facilities, Chapter 173-240 WAC. Unless and until the city of Othello is delegated the authority to review and approve such plans under RCW 90.48.110, sources of nondomestic discharges shall request approval for such plans through the Department of Ecology. To ensure conformance with this requirement, proof of the approval of such plans and one copy of each approved plan shall be provided to the public works director before commencing any such construction or modification.

(b)    Users shall apply to the public works director for a permit at least sixty days prior to the intended discharge of any pollutants other than domestic wastewater or wastewater which the public works director has determined is similar in character and strength to normal domestic wastewater with no potential to adversely affect the POTW (WAC 173-216-050(1)).

(c)    All significant industrial users shall apply for and obtain a permit prior to discharge.

(d)    All users shall apply all known, available, and reasonable methods to prevent and control waste discharges to the waters of the state (AKART) (WAC 173-216-050(3)).

(e)    Discharge restrictions of Chapter 173-303 WAC (Dangerous Waste) shall apply to all users. (Prohibited discharge standards have been merged with federal prohibitions in Section 12.26.050.)

(f)    Claims of confidentiality shall be submitted according to WAC 173-216-080. Information which may not be held confidential includes the: name and address of applicant, description of proposal, the proposed receiving water, receiving water quality, and effluent data. Claims shall be reviewed based on the standards of WAC 173-216-080, Chapter 42.17A and 42.56 RCW, Chapter 173-03 WAC, and RCW 43.21A.160.

(g)    Persons applying for a new permit or a permit renewal or modification which allows a new or increased pollutant loading shall publish notice for each application in the format provided by the city of Othello. Such notices shall fulfill the requirements of WAC 173-216-090. These requirements include publishing:

(1)    The name and address of the applicant and facility/activity to be permitted;

(2)    A brief description of the activities or operations which result in the discharge;

(3)    Whether any tentative determination which has been reached with respect to allowing the discharge;

(4)    The address and phone number of the office of the public works director where persons can obtain additional information;

(5)    The dates of the comment period (which shall be at least thirty days); and

(6)    How and where to submit comments or have any other input into the permitting process, including requesting a public hearing.

(h)    The public works director may require the applicant to also mail this notice to persons who have expressed an interest in being notified, to state agencies and local governments with a regulatory interest, and to post the notice on the premises. If the public works director determines there is sufficient public interest, the city of Othello shall hold a public meeting following the rules of WAC 173-216-100. The public works director may assume responsibility for public notice requirements for any person, and may waive this requirement for persons applying for a general permit, model permit, short-term discharge authorization, or is a food service establishment.

(i)    Permit terms shall include, wherever applicable, the requirement to apply all known, available, and reasonable methods of prevention, control, and treatment.

(j)    All required monitoring data shall be analyzed by a laboratory registered or accredited under the provisions of Chapter 173-50 WAC, except for flow, temperature, settleable solids, conductivity, pH, turbidity, and internal process control parameters. However, if the laboratory analyzing samples for conductivity, pH, and turbidity shall otherwise be accredited, it shall be accredited for these parameters as well. (Ord. 1400 § 9 (part), 2014: Ord. 1367 § 1 (part), 2012).

12.26.080 Local limits.

(a)    The public works director may establish local limits pursuant to 40 CFR 403.5(c).

(b)    The following pollutant limits are established to protect against pass-through and interference and reflect the application of reasonable treatment technology. No person shall discharge wastewater in excess of the following daily maximum limits if the total mass discharged would exceed that contained in one thousand gallons at the below limit.

(c)    The below limits apply at the point where the wastewater is discharged to the POTW. All concentrations for metallic substances are for total metal unless indicated otherwise. The public works director may impose mass limits in addition to concentration based limits.

(d)    Users discharging BOD, TSS, or ammonia in excess of the concentration limits by more than the threshold amount shall apply for a permit. For example, a user discharging two thousand gallons per day of BOD at four hundred fifty mg/l. The surchargeable concentration would be four hundred fifty, three hundred or one hundred fifty mg/l, which when multiplied by two thousand gpd (and 8.34 lb/g) yields 2.5 lb/d. Such users shall be subject to surcharges as established by the public works director under the authority of this chapter up to the “ceiling” loading limit established by permit.

(e)    Users shall be subject to “instantaneous limits” (as determined by a grab sample) of equal to twice the below “daily maximum” concentrations for any pollutant for which a composite sample is required in a permit. This provision is inapplicable to users without permits, or without the permit requirement to collect a composite sample for the analyte in question.

No user shall discharge nondomestic wastewater containing pollutants that exceed the following limitations:

Pollutant(1)

Daily Maximum Concentration (mg/L)

Arsenic (As)

0.48

Cadmium (Cd)

0.049

Chloroform

0.67

Chromium Total (Cr)

5.0

Chromium (VI)

0.43

Copper (Cu)

0.30

Lead (Pb)

0.19

Mercury (Hg)

0.002

Molybdenum (Mo)

1.14

Nickel (Ni)

2.0

Selenium (Se)

0.419

Silver (Ag)

0.06

Sulfide (liquid phase)

0.5

Zinc (Zn)

4.18

beta-BHC

0.01516

Endosulfan

0.06964

Endrin

0.00383

alpha-Chlordane

0.00716

gamma-Chlordane

0.00367

Chlorpyrifos

0.01298

Lindane

0.13324

Benzene

0.05 (3)

BTEX(2)

0.75 (3)

(1)    All pollutants are analyzed and reported as total mg/L.

(2)    BTEX is the sum of the measured concentrations of Benzene, Toluene, Ethylbenzene and Xylene.

(3)    These pollutants are based upon the installation of treatment technology (air stripping/carbon capture) and are developed for discharges from groundwater cleanup or remediation activities or other effluents containing Benzene and/or BTEX and requiring the installation of treatment.

Conventional Surcharge Pollutants

Daily Maximum Concentration (mg/L)

BOD5

300

Total Suspended Solids

300

Ammonia

60

Protection of Sewer Line Blockage

Daily Maximum Concentration (mg/L)

Oil and grease of animal or vegetable origin

300

Protection Against Corrosion, Pass-through, and Interference

Daily Maximum Concentration (mg/L)

Hydrocarbon based oil/grease

50

Sulfides (H2S vapor toxicity threshold)

0.5

Sulfates

50

Total Chloride

1,000

Total Dissolved Solids

5,000

Total Organic Solvents (including alcohols)

1,000

(f)    The public works director shall use the individual permit process to establish ceiling limits for compatible pollutants and appropriate discharge limits for all other pollutants not listed under this section. This includes pollutants subject to regulation under RCRA, volatile or semi-volatile organics, halogenated or brominated compounds, poly-aromatic hydrocarbons, polymers, surfactants, pesticide active ingredients, etc.

(g)    The public works director may establish and require best management practices for any category of user or type of industrial process which creates a nondomestic wastestream. Such requirements may be applied either in lieu of or in addition to the local limits of this section. BMPs may also include alternative limits which may be applied at the end of a specific process or treatment step instead of at the combined effluent. (Ord. 1367 § 1 (part), 2012).

12.26.090 City of Othello’s right of revision.

The city of Othello reserves the right to establish, by ordinance or in wastewater discharge permits, more stringent standards or requirements on discharges to the POTW. (Ord. 1367 § 1 (part), 2012).

12.26.100 Dilution.

No user shall ever increase the use of process water, or in any way attempt to dilute a discharge, as a partial or complete substitute for adequate treatment to achieve compliance with a discharge limit unless expressly authorized by an applicable pretreatment standard or requirement. The public works director may impose mass limitations on users where deemed appropriate to safeguard against the use of dilution to meet applicable pretreatment standards or requirements, or in other cases when the imposition of mass limitations is appropriate. (Ord. 1367 § 1 (part), 2012).

12.26.110 Pretreatment facilities.

Users shall provide wastewater treatment as necessary to comply with this chapter and shall achieve compliance with all categorical pretreatment standards, local limits, and the prohibitions set out in Section 12.26.050 within the time limitations specified by EPA, the state, or the public works director, whichever is more stringent. Any facilities necessary for compliance shall be provided, operated, and maintained at the user’s expense, and satisfy state requirements for review and approval of plans for wastewater facilities as described in Section 12.26.070. Such plans (engineering report, plans and specifications, and operation and maintenance manuals) shall be submitted as required by Chapter 173-240 WAC to either the public works director or the Department of Ecology for review and users shall obtain approval prior to construction. The review of such plans and operating procedures shall in no way relieve the user from the responsibility of modifying such facilities as necessary to produce a discharge acceptable to the city of Othello under the provisions of this chapter. (Ord. 1367 § 1 (part), 2012).

12.26.120 Additional pretreatment measures.

(a)    The public works director may immediately and effectively halt or prevent any discharge of pollutants to the POTW which reasonably appears to present an imminent endangerment to the health or welfare of persons. In such cases, the public works director will provide the user advance notice if possible, but shall not delay a response to imminent endangerment.

(b)    The public works director may halt or prevent any discharge to the POTW which presents or may present an endangerment to the environment or which threatens to interfere with the operation of the POTW (including the collection system and pump stations). In such cases, the public works director shall attempt to provide not only notice to the affected user(s), but the opportunity to respond.

(c)    Any user causing the public works director to exercise the emergency authorities provided for under subsections (a) and (b) of this section shall be responsible for reimbursement of all related costs to the city of Othello.

(d)    The public works director may require users to reduce or curtail certain discharges to the sewer, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and take all other measures to protect the POTW and determine the user’s compliance with the requirements of this chapter.

(e)    The public works director, based on the determination that such devices are necessary for implementation of pretreatment requirements, may require any user to install and maintain on their property and at their expense the following devices:

(1)    A sample taking facility accessible to the public works director;

(2)    A suitable storage and/or flow equalization tank;

(3)    Grease, oil, and/or grit interceptors; and

(4)    An approved combustible gas detection meter.

(f)    Users installing any of the above devices shall ensure they are of the type and capacity approved by the public works director, meet applicable building and plumbing codes, and conform to any separate requirements established by the city of Othello. Users shall locate units in areas easily accessible for cleaning and inspection by representatives of the public works director. Users shall be responsible for all periodic inspection, cleaning, and repair of such devices. (Ord. 1367 § 1 (part), 2012).

12.26.130 Accidental discharge—Slug discharge control plans.

The public works director may require any user to develop and implement an accidental discharge/slug discharge control plan and take other actions the public works director believes are necessary to control discharges which may be caused by spills or periodic nonroutine activities. Accidental discharge/slug discharge control plans shall include at least the following:

(a)    A description of all discharge practices, including any nonroutine batch discharges such as from cleaning, replenishment, or disposal;

(b)    A description of all stored chemicals, disclosing all ingredients in formulations which could violate a discharge prohibition if discharged to the sewer;

(c)    The procedures for immediately notifying the public works director of any accidental or slug discharge, as required by Section 12.26.360; and

(d)    The procedures that will be taken to prevent the occurrence or adverse impact from any accidental or slug discharge. Such procedures shall address the inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants (including solvents), and/or measures and equipment for emergency response. (Ord. 1367 § 1 (part), 2012).

12.26.140 Hauled wastewater.

(a)    Residential wastes meeting the definition of “septage” shall not be introduced into the POTW.

(b)    Industrial wastes shall not be introduced into the POTW. (Ord. 1367 § 1 (part), 2012).

12.26.150 Industrial user surveys.

The city of Othello is obligated under federal law to identify all users potentially subject to the pretreatment program, and the character and volume of pollutants discharged by such users. To satisfy this requirement, all sources of nondomestic discharges to the POTW shall, upon request of the public works director, periodically complete an industrial user survey form. Users shall fully disclose the information requested and sign the completed form in accordance with Section 12.26.210. Proper completion of survey requirements is a condition of initial and continued discharge to the public sewer system. Users failing to fully comply with survey requirements within thirty days shall be subject to all enforcement measures authorized under this chapter including termination of service. The public works director is authorized to prepare several forms for this purpose and require completion of the particular form which the public works director determines appropriate to provide the information needed to categorize each user. The public works director shall be authorized to categorize each user, provide written notice of a user’s categorization and what it means, and revise this categorization at any time. (Ord. 1367 § 1 (part), 2012).

12.26.160 Wastewater discharge permit requirement.

(a)    No user categorized by the public works director as a significant industrial user shall discharge wastewater into the POTW without first obtaining an individual wastewater discharge permit or, where applicable, a general permit from the public works director. A significant industrial user that has filed a timely application pursuant to Section 12.26.170 may continue to discharge unless and until notified otherwise by the public works director.

(b)    The public works director may require all other users to obtain wastewater discharge permits, or implement best management practices as necessary to carry out the purposes of this chapter. For example, a wastewater discharge permit may be required solely for flow equalization.

(c)    Any failure to complete the required survey form, apply for and obtain a required permit, or violate the terms and conditions of a wastewater discharge permit shall be deemed a violation of this chapter and subject the wastewater discharge permittee to the sanctions set out in Sections 12.26.490 through 12.26.670. Obtaining a wastewater discharge permit does not relieve a permittee of its obligation to comply with all federal and state pretreatment standards or requirements or with any other requirements of federal, state, and local law. (Ord. 1367 § 1 (part), 2012).

12.26.170 Wastewater discharge permitting—Existing connections.

Any user required to obtain a wastewater discharge permit who was discharging wastewater into the POTW prior to the effective date of the ordinance codified in this chapter and who wishes to continue such discharges shall, within thirty days after said date, apply to the public works director for a wastewater discharge permit in accordance with Section 12.26.190, and shall not cause or allow discharges to the POTW to continue after sixty days of the effective date of the ordinance codified in this chapter except in accordance with a wastewater discharge permit issued by the public works director. (Ord. 1367 § 1 (part), 2012).

12.26.180 Wastewater discharge permitting—New connections.

Persons wishing to discharge nondomestic wastewater shall first complete either a survey form (if they do not expect a permit is needed) or a permit application. Any user identified by the public works director through the survey as needing a permit shall file a permit application. Applications for wastewater discharge permits, in accordance with Section 12.26.190, shall be filed at least ninety days prior to the desired date of discharge, and the discharge permit obtained prior to commencing discharge. (Ord. 1367 § 1 (part), 2012).

12.26.190 Wastewater discharge permit application contents.

(a)    All users required to obtain a wastewater discharge permit shall apply using the form provided by the public works director. Users eligible for coverage under a general permit may request such coverage using an industry specific form if one has been developed (see Section 12.26.200). Users shall supply the public works director the following information as part of the permit application if relevant to the user’s operation unless waived by the public works director.

(1)    Identifying Information.

(A)    The name and physical address of the facility, the names of the operator/facility manager and owner, and the name and address of the point of contact; and

(B)    A description of activities, facilities, and plant production processes on the premises.

(2)    A list of any environmental control permits held by or for the facility.

(3)    A description of operations and facilities including:

(A)    A brief description of the operations, average rate of production, and industrial classification (SIC or NAICS codes) of the operation(s) conducted on site;

(B)    The number and type of employees, and proposed or actual hours of operation;

(C)    The type, amount, rate of production, and process used for each product produced;

(D)    The type and amount of raw materials used (average and maximum rates);

(E)    The raw materials and chemicals to be routinely stored at the facility (including products in rail cars and tank trucks located on site);

(F)    The types of wastes generated on a routine and periodic basis;

(G)    The times and durations when wastes will be discharged;

(H)    A schematic process diagram showing each process step, wastestream, treatment step, internal recycle, and point of discharge to the POTW. This diagram should identify which streams are subject to categorical standards;

(I)    Site plans, floor plans, mechanical and plumbing plans, and details to show all sewers, floor drains, and appurtenances by size, location, and elevation, and all points of discharge;

(J)    The sampling locations and provisions for monitoring discharges; and

(K)    Whether plans for wastewater facilities under Chapter 173-240 WAC have been developed, and their approval status (engineering report, plans and specifications, and an operations and maintenance manual).

(4)    Flow Data. The average daily and maximum daily flow, in gallons per day, to the POTW from each wastestream. Information shall be complete enough to allow use of the combined wastestream formula per Section 12.26.060(c) (and 40 CFR 403.6(e)) where applicable.

(5)    Pollutant Data.

(A)    The categorical pretreatment standards applicable to each regulated process;

(B)    The results of sampling and analysis identifying the nature and concentration (and mass where required by the standard or the public works director), of regulated pollutants in the discharge from each regulated process; and

(C)    The estimated peak instantaneous, daily maximum, and long-term average discharge concentrations (and mass) based on the sampling results.

(6)    Sampling data to show samples are:

(A)    Representative of daily operations;

(B)    Taken just downstream from pretreatment facilities if such exist, or just downstream of the regulated process(es) if no pretreatment exists;

(C)    Collected as required by Section 12.26.410; and

(D)    Analyzed according to Section 12.26.400.

(7)    Information Confirming BMPs. Where standards specify a BMP or pollution prevention alternative, the user shall include the information needed by the public works director or the applicable standard to determine whether BMPs are (or will be) implemented.

(8)    Any requests for a monitoring waiver (or a renewal of an approved monitoring waiver) for a pollutant neither present nor expected to be present in the discharge shall include new sampling showing (continued) absence of the pollutant in the raw wastewater and satisfying Section 12.26.340(b).

(9)    Any request to be covered by a general permit shall satisfy Section 12.26.200.

(10)    Any other information deemed necessary by the public works director to evaluate the situation and prepare a discharge permit.

(b)    Incomplete or inaccurate applications will not be processed and will be returned to the user for revision. The public works director shall be held harmless for delays caused by returned applications. (Ord. 1367 § 1 (part), 2012).

12.26.200 General permits.

(a)    The public works director may use general permits to control discharges to the POTW from all users. Significant users covered by a general permit will be those that the public works director finds:

(1)    Involve the same or substantially similar types of operations;

(2)    Discharge the same types of wastes;

(3)    Require the same effluent limitations;

(4)    Require the same or similar monitoring;

(5)    Are more appropriately controlled under a general permit; and

(6)    Are not subject to production based standards, mass limits, or require use of the combined wastestream formula to calculate limits.

(b)    To be covered by the general permit, the user shall file a written request for coverage. The request shall identify contact information, production processes, types of wastes generated, the general permit under which coverage is requested, and the basis for believing the general permit is applicable. The user shall also identify the location for monitoring all wastes covered by the general permit. If requesting a monitoring waiver, the application shall provide information showing Section 12.26.340(b) has been complied with. The user shall also provide any other information the public works director has requested to properly evaluate the situation. A monitoring waiver is not effective until the public works director has provided written notice granting the waiver.

(c)    The public works director will retain the following for three years after the expiration of the general permit:

(1)    A copy of the general permit;

(2)    The fact sheet;

(3)    Each user’s request for coverage; and

(4)    The POTW’s determination to extend coverage to each user. (Ord. 1367 § 1 (part), 2012).

12.26.210 Application signatories and certifications.

(a)    All survey forms, wastewater discharge permit applications, and user reports shall be signed by an authorized representative of the user and contain the certification statement in Section 12.26.440(a).

(b)    Users shall submit a new authorization if the designation of an authorized representative is no longer accurate. This includes when a different individual or position has responsibility for the overall operation of the facility, or overall responsibility for environmental matters for the company. The user shall submit the new authorization prior to or with any reports to be signed by the new authorized representative.

(c)    A facility determined to be a nonsignificant categorical industrial user by the public works director pursuant to Section 12.26.040(hh)(3) shall annually submit the signed certification statement found at Section 12.26.440(b). (Ord. 1367 § 1 (part), 2012).

12.26.220 Wastewater discharge permit decisions.

After receipt of a complete wastewater discharge permit application, the public works director will determine whether or not to issue a wastewater discharge permit. The public works director may deny any application for a wastewater discharge permit or require additional safeguards, reports (including plans under Chapter 173-240 WAC), or information. For users not meeting the criteria of significant industrial users, the public works director may also waive or defer a permit, or allow discharges in the interim while a permit is being prepared. (Ord. 1367 § 1 (part), 2012).

12.26.230 Wastewater discharge permit duration.

The public works director may issue a wastewater discharge permit for a period of up to five years from its effective date. Each wastewater discharge permit will indicate its expiration date. (Ord. 1367 § 1 (part), 2012).

12.26.240 Wastewater discharge permit contents.

Wastewater discharge permits will include conditions the public works director deems reasonably necessary to carry out the goals of the pretreatment program (Section 12.26.010), federal and state regulations, and the requirements of this chapter.

(a)    Wastewater discharge permits will contain:

(1)    The permit issuance date, expiration date, and effective date;

(2)    A statement that the wastewater discharge permit is nontransferable without prior notification to the city of Othello in accordance with Section 12.26.270, and provisions for furnishing the new owner or operator with a copy of the existing wastewater discharge permit;

(3)    Effluent limits, including best management practices, based on applicable pretreatment standards and requirements to apply AKART (see Section 12.26.070(i));

(4)    The pollutants to be monitored, and specific monitoring requirements. This includes the sampling location(s), sampling frequencies, and sample types consistent with federal, state, and local law. (See Section 12.26.070(j));

(5)    Requirements to submit certain reports (as reflected in Sections 12.26.310 through 12.26.440), provide various notifications, keep records, and implement best management practices;

(6)    The process to be used to request a waiver from monitoring for a pollutant neither present nor expected to be present in the discharge in accordance with Section 12.26.340(b), or a specific waived pollutant in the case of an individual permit;

(7)    A statement of applicable civil and criminal penalties for violation of pretreatment standards and requirements, and any applicable compliance schedule. Such schedule may not extend the time for compliance beyond that required by applicable federal, state, or local law;

(8)    Requirements to control slug discharges, including to develop, update, and implement slug discharge control plans (find required content in Section 12.26.130) where the public works director determines such plans are important to preventing accidental, unanticipated, or nonroutine discharges;

(9)    Any monitoring which has been conditionally waived by the public works director according to Section 12.26.340(b) but which automatically applies at any time the requirements of the conditional waiver are not met; and

(10)    Reapplication requirements.

(b)    Wastewater discharge permits may contain, but need not be limited to, the following conditions:

(1)    Pretreatment facilities and measures required by Sections 12.26.110 and 12.26.120;

(2)    Limits on the average and/or maximum rate of discharge, time of discharge, and/or requirements for flow regulation and equalization;

(3)    Requirements to install pretreatment technology, pollution controls, or to construct appropriate containment devices to reduce, eliminate, or prevent the introduction of pollutants into the treatment works, ground, or stormwater;

(4)    Requirements to develop and implement waste minimization plans to reduce the amount of pollutants discharged to the POTW;

(5)    Requirements to pay charges or fees for discharge to the POTW including high strength charges;

(6)    Requirements to install and maintain inspection and sampling facilities and equipment, including flow measurement devices;

(7)    Notice that compliance with the wastewater discharge permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the wastewater discharge permit; and

(8)    Other conditions as deemed appropriate by the public works director to ensure compliance with this chapter, and state and federal laws, rules, and regulations. (Ord. 1367 § 1 (part), 2012).

12.26.250 Permit issuance process.

(a)    Public Notice. Users shall follow the procedures for public notice found in Section 12.26.070(g) and (h). The public works director shall consider and respond to public input as appropriate prior to issuance of a permit. The public works director will arrange a public meeting if there is sufficient interest.

(b)    Permit Appeals. The public works director shall provide public notice of the issuance of a wastewater discharge permit. Any person, including the user, may petition the public works director to reconsider the terms of a wastewater discharge permit within thirty days of notice of its issuance.

(1)    Failure to submit a timely petition for review shall be deemed to be a waiver of the administrative appeal.

(2)    In its petition, the appealing party shall indicate the wastewater discharge permit provisions objected to, the reasons for this objection, and the alternative condition, if any, it seeks to place in the wastewater discharge permit.

(3)    The effectiveness of the wastewater discharge permit shall not be stayed pending the appeal.

(4)    If the public works director fails to act within thirty days, a request for reconsideration shall be deemed to be denied. Decisions not to reconsider a wastewater discharge permit, not to issue a wastewater discharge permit, or not to modify a wastewater discharge permit shall be considered final administrative actions for purposes of judicial review.

(5)    Aggrieved parties seeking judicial review of the final administrative wastewater discharge permit decision shall do so by filing a complaint with a court of competent jurisdiction in the manner and time frame prescribed by law. (Ord. 1367 § 1 (part), 2012).

12.26.260 Wastewater discharge permit modification.

The public works director may modify a wastewater discharge permit for good cause, including, but not limited to, the following reasons:

(a)    To incorporate any new or revised federal, state, or local pretreatment standards or requirements including new or revised local limits.

(b)    To address new or changed operations, processes, production rates, wastestreams, or changes in water volume or character.

(c)    To reflect conditions at the POTW requiring an authorized discharge to be reduced or curtailed. Such requirements may be either temporary or permanent.

(d)    Based on information indicating that a permitted discharge poses a threat to the city of Othello’s POTW or staff, the receiving waters, or to violate a prohibition of this chapter.

(e)    To address violations of any terms or conditions of the wastewater discharge permit.

(f)    To address misrepresentations or failure to fully disclose all relevant facts in the wastewater discharge permit application or in any required report.

(g)    To incorporate revisions based on a variance from categorical pretreatment standards approved pursuant to 40 CFR 403.13.

(h)    To correct typographical or other errors in the wastewater discharge permit.

(i)    To reflect a transfer of the facility ownership or operation to a new owner or operator as required under Section 12.26.270. (Ord. 1367 § 1 (part), 2012).

12.26.270 Wastewater discharge permit transfer.

Wastewater discharge permits may be transferred to a new owner or operator only if the permittee gives at least thirty days’ advance notice to the public works director and the public works director approves the wastewater discharge permit transfer. Failure to provide advance notice of a transfer renders the wastewater discharge permit void as of the date of facility transfer. The notice to the public works director shall include a written certification by the new owner or operator which:

(a)    States that the new owner and/or operator have no immediate intent to change the facility’s operations and processes.

(b)    Identifies the specific date on which the transfer is to occur.

(c)    Acknowledges full responsibility for complying with the existing wastewater discharge permit. (Ord. 1367 § 1 (part), 2012).

12.26.280 Wastewater discharge permit revocation.

The public works director may revoke a wastewater discharge permit for good cause, including, but not limited to, when a user has:

(a)    Failed to notify the public works director of significant changes to the wastewater prior to the changed discharge;

(b)    Failed to provide prior notification to the public works director of changed conditions pursuant to Section 12.26.350;

(c)    Misrepresented or failed to fully disclose all relevant facts in the wastewater discharge permit application;

(d)    Falsified self monitoring reports or tampered with monitoring equipment;

(e)    Refused to allow the public works director timely access to the facility premises and records;

(f)    Failed to meet effluent limitations or permit conditions;

(g)    Failed to pay applicable fines or sewer charges;

(h)    Failed to meet compliance schedule deadline dates;

(i)    Failed to complete a wastewater survey or wastewater discharge permit application;

(j)    Failed to provide advance notice of the transfer of business ownership;

(k)    Violated any pretreatment standard or requirement, or any terms of the wastewater discharge permit or this chapter;

(l)    Ceased operations; or

(m)    Transferred business ownership.

Wastewater discharge permits issued to a user are void upon the issuance of a new wastewater discharge permit to that user. (Ord. 1367 § 1 (part), 2012).

12.26.290 Wastewater discharge permit reissuance.

A user with an expiring wastewater discharge permit shall apply for wastewater discharge permit reissuance by submitting a complete permit application, in accordance with Section 12.26.190, a minimum of ninety days prior to the expiration of the user’s existing wastewater discharge permit. (Ord. 1367 § 1 (part), 2012).

12.26.300 Regulation of waste received from other jurisdictions.

(a)    Prior to allowing wastewater to be received for treatment from another municipality, or from a user located outside the municipal corporate boundaries of the city of Othello, the city of Othello shall be empowered and obliged to enter into an inter-municipal agreement with the contributing municipality (county, city, town, sewer district, or other municipal corporation recognized under state law). Such agreement shall affix responsibilities in an enforceable manner to ensure that the pretreatment program is fully and equitably administered in all contributing jurisdictions. Any such agreement or modification to such an agreement shall be reviewed by the city of Othello’s legal counsel and shall be submitted, together with the opinion that it is legally sufficient, to the approval authority (Department of Ecology) and processed as a minor program modification.

(b)    Prior to entering into an agreement required by subsection (a) of this section, the public works director shall request the following information from the contributing municipality:

(1)    A description of the quality and volume of wastewater discharged to the POTW by the contributing municipality;

(2)    An inventory of all users located within the contributing municipality that are discharging to the POTW; and

(3)    Such other information as the public works director may deem necessary.

(c)    An interlocal agreement, as required by subsection (a) of this section, shall contain the following provisions:

(1)    Requirements for contributing municipalities to adopt a sewer use ordinance which establishes pretreatment standards and requirements as stringent as in this chapter (Sections 12.26.050 through 12.26.100). The ordinance provisions and limits shall be revised to conform within a reasonable time frame (within nine months) to any future revisions of the city of Othello’s ordinance;

(2)    Requirements for the contributing municipality to submit a revised user inventory on at least an annual basis, and reinforce requirements to obtain a permit prior to discharge;

(3)    A clear division of responsibilities for implementing each pretreatment related activity under this chapter or in the city of Othello’s national pollutant discharge elimination system (NPDES) permit. Such tasks include reinforcing prohibitions, locating users, issuing wastewater discharge permits, conducting inspections, sampling, evaluating compliance, initiating enforcement, and reporting compliance. Any activities which will be conducted jointly by the contributing municipality and the public works director shall also be identified;

(4)    Requirements for the contributing municipality to provide the public works director access to all information that the contributing municipality obtains as part of its pretreatment activities;

(5)    The nature, quality (e.g., conventional and toxic pollutant concentrations), and volume (peak and average flow rates) the contributing municipality is allowed to discharge to the city of Othello. How and where compliance will be measured, how fees for service and surcharges will be established, and how additional loading capacity, if needed, will be negotiated;

(6)    Provisions ensuring the public works director may enter and inspect users located within the contributing municipality’s jurisdictional boundaries to confirm that the pretreatment program is being properly administered, users are properly categorized, etc.; and

(7)    Provisions for addressing any breach of the terms of the inter-municipal agreement. (Ord. 1367 § 1 (part), 2012).

12.26.310 Baseline monitoring reports.

(a)    When standards for an industry category are promulgated, users that perform that process and either currently discharge or are scheduled to discharge wastewater from the process to the POTW, shall submit a “baseline monitoring report” to the public works director. This report shall contain the information listed in subsection (c) of this section. The report is due within one hundred eighty days after the effective date of a categorical pretreatment standard, unless the final administrative decision on a category determination comes later (reference 40 CFR 403.6(a)(4) for details in that event).

(b)    Users that wish to begin discharging wastewater to the POTW from operations subject to categorical standards after EPA has published the standards (called new sources), shall also submit a “baseline monitoring report” to the public works director containing the information listed in subsection (c) of this section. However, for new sources, the report shall be provided at least ninety days before desiring to discharge. New sources shall describe the method of pretreatment they intend to use to meet applicable categorical standards. Because monitoring data will not be available for proposed facilities, new sources instead shall provide estimates of the anticipated flow rates and quantity of pollutants to be discharged.

(c)    The baseline monitoring report shall include the following information:

(1)    All information required in Section 12.26.190(a)(1) through (7).

(2)    Additional Conditions for Existing Sources Measuring Pollutants.

(A)    Users shall take a minimum of one representative sample to compile the data for the baseline monitoring report.

(B)    Users shall take samples immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If the user mixes other wastewaters with the regulated wastewater prior to pretreatment, the user shall provide the flows and concentrations necessary to apply the combined wastestream formula of Section 12.26.060(c) and 40 CFR 403.6(e). Where the user wants an alternate concentration or mass limit, and it is allowed by federal rules at § 403.6(e), the user shall propose the adjusted limit and provide supporting data to the control authority.

(C)    Sampling and analysis shall be performed in accordance with Sections 12.26.410 and 12.26.400.

(D)    The public works director may allow the report to use only historical data if the data is good enough to allow the evaluation of whether (and which) industrial pretreatment measures are needed.

(E)    The baseline report shall indicate the time, date, place of sampling, and methods of analysis. The user shall certify that the sampling and analysis presented is representative of normal work cycles and expected pollutant discharges to the POTW.

(3)    Compliance Certification. A statement, reviewed by the user’s authorized representative as defined in Section 12.26.040(c) and certified by a qualified professional, such as a professional engineer, indicating whether pretreatment standards are being met on a consistent basis, and, if not, whether additional operation and maintenance (O&M) and/or additional pretreatment steps are required to meet the pretreatment standards and requirements.

(4)    Compliance Schedule. While new sources shall install the treatment required to meet the pretreatment standards prior to operation, existing sources may be granted a compliance schedule where they shall provide additional pretreatment and/or O&M to meet the pretreatment standards. In such cases, the user shall propose the shortest schedule by which they can provide the additional pretreatment and/or O&M. The completion date which the user proposes in this schedule may not be later than the compliance date established for the applicable pretreatment standard. Any compliance schedule authorized pursuant to this section shall also meet the requirements set out in Section 12.26.320.

(5)    Signature and Report Certification. All baseline monitoring reports shall be certified in accordance with Section 12.26.440(a) and signed by an authorized representative as defined by Section 12.26.040(c). (Ord. 1367 § 1 (part), 2012).

12.26.320 Compliance schedule progress reports.

The following conditions shall apply to compliance schedules proposed by existing sources according to Section 12.26.310(c)(4) and incorporated into permits:

(a)    The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment required for the user to meet the applicable pretreatment standards (such events include, but are not limited to, hiring an engineer, completing preliminary and final plans, executing contracts for major components, commencing and completing construction, and beginning and conducting routine operation);

(b)    No increment referred to above shall exceed nine months;

(c)    The user shall submit a progress report to the public works director no later than fourteen days following each date in the schedule and the final date of compliance including, as a minimum, whether or not it complied with the increment of progress, the reason for any delay, and, if appropriate, the steps being taken by the user to return to the established schedule; and

(d)    In no event shall more than nine months elapse between such progress reports to the public works director. (Ord. 1367 § 1 (part), 2012).

12.26.330 Reports on compliance with categorical pretreatment standard deadline.

Both existing sources and new sources shall submit a report on whether compliance has been initially achieved. For existing sources, the report is due ninety days after the date applicable categorical standards give as the final compliance date. For a new source, the report is due ninety days after starting to discharge to the POTW.

In both cases, the report shall contain the information described in Sections 12.26.190(a)(3) through (6). For existing sources, it shall also contain the compliance certification of Section 12.26.310(c)(3) and, if needed, the compliance schedule described in Section 12.26.310(c)(4). Users subject to equivalent mass or concentration limits, as allowed by Section 12.26.060, shall include a reasonable measure of their long-term production rate. Other users subject to standards based on a unit of production (or other measure of operation) shall include their actual production during the sampling period. All compliance reports shall be signed and certified in accordance with Section 12.26.440(a). (Ord. 1367 § 1 (part), 2012).

12.26.340 Periodic compliance reports.

(a)    The public works director may specify the necessary minimum sampling and reporting frequencies and include applicable requirements in permits. Significant industrial users (SIUs), except those recognized as “middle tier” users under subsection (c) of this section, shall:

(1)    Report at least twice a year, in June and December, unless otherwise specified;

(2)    Report the flows and concentrations of regulated pollutants in all discharges subject to pretreatment standards;

(3)    Report average and maximum daily flows for the reporting period and identify where flow estimates are used; and

(4)    Include the documentation needed to show compliance with applicable BMPs, pollution prevention alternatives, maintenance, treatment, or record keeping requirements.

(b)    The public works director may authorize a CIU to forego sampling of a pollutant regulated by a categorical standard when it is not present in raw wastewater provided:

(1)    The CIU submits a request for the waiver with their permit application or reapplication (see Section 12.26.190(a)(8));

(2)    The CIU analyzes a sample (or samples) representative of all wastewater from all processes before any treatment and includes all results with the request;

(3)    The CIU demonstrates through source water and untreated process water sample results that the pollutant never exceeds intake water levels. (Pollutants simply reduced by treatment to background levels are ineligible for the waiver.);

(4)    The CIU shows, where nondetectable sample results are returned in subsection (b)(2) or (3) of this section, that they used the method from 40 CFR Part 136 with the lowest detection level;

(5)    The duly authorized representative of the CIU signs the request using the certification statement of Section 12.26.440(a);

(6)    The CIU includes, in routine monitoring reports, the statement in Section 12.26.440(c), certifying that there has been no increase in the pollutant in its wastestream due to activities of the industrial user; and

(7)    The CIU reports and immediately resumes the monitoring which would otherwise have been required upon discovering that a waived pollutant is present or expected to be present based on changes to the user’s operations.

The public works director will document the reasons supporting the waiver in the permit fact sheet, and keep any information submitted by the user and the fact sheet for three years after the waiver expires. Monitoring waivers are valid after being incorporated in a user’s permit. The waiver is in effect while the permit is effective, up to five years. The public works director may cancel a monitoring waiver at any time for any good reason.

(c)    The public works director may reduce the minimum periodic compliance reporting frequency for CIUs from twice a year (subsection (a) of this section) to once a year where the CIU:

(1)    Discharges wastewater subject to categorical standards at a rate less than one gallon per every ten thousand gallons of POTW design maximum monthly average flow capacity (per the city of Othello NPDES permit). The CIU shall measure their discharge using a continuous (or totalizing) effluent flow meter. If the CIU discharges in batches, the public works director will determine eligibility by dividing total flows in all batches which contain any proportion subject to categorical regulation by the number of days the CIU is in full operation in a given calendar month.

(2)    Discharges less than five thousand gallons of wastewater subject to categorical standards on the maximum day (including for batch dischargers).

(3)    Discharges categorical wastewater with less than one pound of BOD5 per each ten thousand pounds of POTW loading capacity. POTW loading capacity is the design maximum monthly average BOD5 loading capacity per the city of Othello’s NPDES permit (or if not included in the permit, in approved city of Othello plans).

(4)    Discharges less than 0.01 percent of the maximum allowable headworks loading for any pollutant regulated by both an applicable categorical standard and a local limit in Section 12.26.080.

(5)    Has not been in significant noncompliance as defined in this chapter during the prior two years.

(6)    Has daily flow rates, production levels, or pollutant levels that are consistent enough the public works director believes will allow representative data at the decreasing reporting interval.

(d)    Users shall sign and certify all periodic compliance reports in accordance with Section 12.26.440(a).

(e)    Users shall take wastewater samples which are representative of their range of discharge conditions and of any discharge not disclosed in their permit application. Users shall properly operate, clean, and maintain sampling and flow metering facilities and devices and ensure they function properly. The public works director may not allow user claims that sampling results are unrepresentative due to a user’s failure to meet this requirement.

(f)    Users subject to the reporting requirements in this section shall report any additional monitoring which might determine compliance with permit requirements. This includes any additional monitoring of regulated pollutant at their respective effluent monitoring locations using procedures prescribed in Section 12.26.410. In such cases, the results of this monitoring shall be included in periodic monitoring reports.

(g)    Users that send electronic (digital) documents to the city of Othello to satisfy the requirements of this section shall meet all state and federal electronic signature requirements: Electronic data shall be in the format required by the public works director. The public works director may also require reporting in both digital and traditional format. (Ord. 1367 § 1 (part), 2012).

12.26.350 Reports of changed conditions.

Each user shall notify the public works director of any significant changes to the user’s operations or system which might alter the nature, quality, or volume of its wastewater. This notification shall be made at least thirty days before the desired change and be sent to both the control authority (public works director) and the receiving POTW if they are different. In such cases:

(a)    The public works director may require the user to submit whatever information is needed to evaluate the changed condition. The public works director may also require a new or revised wastewater discharge permit application under Section 12.26.190.

(b)    The public works director may issue, reissue, or modify a wastewater discharge permit applying the procedures of Sections 12.26.250 through 12.26.290 in response to a user’s notice under this section. (Ord. 1367 § 1 (part), 2012).

12.26.360 Reports of potential problems.

(a)    Any user which has any unusual discharge that could cause problems to the POTW shall immediately notify the public works director by telephone of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user to control and curtail the discharge. Such discharges may include spills, slug loads, accidental discharges, or other discharges of a nonroutine, episodic nature. Problems to the POTW which require reporting under this section include violating pretreatment prohibitions, treatment standards, or other requirements of Sections 12.26.050 through 12.26.080 such as vapor toxicity and explosivity limits.

(b)    Within five days following such discharge, the user shall submit a detailed written report describing the cause(s) of the discharge and the measures to be taken by the user to prevent similar future occurrences. Such notification shall not relieve the user of any expense, loss, damage, or other liability which may be incurred as a result of damage to the POTW, natural resources, or any other damage to person or property; nor shall such notification relieve the user of any fines, penalties, or other liability which may be imposed pursuant to this chapter.

(c)    Regardless of whether the user has been required to submit a slug discharge control plan (per Section 12.26.130), all users shall post notice in a prominent location advising employees who to call at the POTW to inform the public works director of a potential problem discharge (subsection (a) of this section). Users shall ensure that all employees who may cause or witness such a discharge are advised of the emergency notification procedures.

(d)    All users shall immediately notify the public works director of any changes at their facility which might increase their potential for a slug discharge. This includes increasing the volume of materials stored or located on site which, if discharged to the POTW, would cause problems. Users required to prepare a slug discharge control plan under Section 12.26.130 shall also modify their plans to include the new conditions prior to, or immediately after making such changes. (Ord. 1367 § 1 (part), 2012).

12.26.370 Reports from unpermitted users.

All users not required to obtain a wastewater discharge permit or general permit shall provide appropriate reports to the public works director as the public works director may require. This includes periodically completing and signing industrial user surveys. (Ord. 1367 § 1 (part), 2012).

12.26.380 Notice of violation/repeat sampling and reporting.

If sampling performed by a user indicates a violation, the user shall notify the public works director within twenty-four hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the public works director within thirty days after becoming aware of the violation. The public works director may waive the repeat sampling requirement where the city of Othello has sampled the effluent for the pollutant in question prior to the user obtaining sampling results. (Ord. 1367 § 1 (part), 2012).

12.26.390 Notification of the discharge of hazardous waste.

(a)    Any user who discharges any substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR Part 261, or Chapter 173-303 WAC shall also comply with the following requirements:

(1)    Notify the public works director, the EPA regional waste management division director, and state hazardous waste authorities, in writing, of the discharge. Maintain a copy of this notification and include it in all subsequent permit application or re-applications under this chapter.

(2)    Include the following information in the notification:

(A)    The name of the hazardous waste as found in 40 CFR Part 261;

(B)    The EPA hazardous waste number; and

(C)    The type of discharge (continuous, batch, or other).

(3)    If the discharge totals more than two hundred twenty pounds in any month, also provide:

(A)    The hazardous constituents contained in the wastes;

(B)    An estimate of the mass and concentration of hazardous constituents in the wastestream discharged during that calendar month; and

(C)    An estimate of the mass of constituents in the wastestream expected to be discharged during the following twelve months.

(4)    This notice shall be repeated for new or increased discharges of substances subject to this reporting requirement.

(5)    All notifications shall take place prior to discharging a substance for which these reporting requirements apply. If this is not possible, the notice shall be provided as soon after discharge as practical and describe why prior notice was not possible.

(6)    Users shall provide notifications under this subsection only once to EPA and the state for each hazardous waste discharged. However, all of the information of these notices shall be repeated in each new permit application submitted under this chapter.

(7)    This requirement does not relieve the user from requirements to provide other notifications, such as of changed conditions under Section 12.26.350, or applicable permit conditions, permit application requirements, and prohibitions.

(8)    The notification requirements in this section do not apply to pollutants for which routine monitoring and reporting is required in a permit under this chapter.

(b)    Users shall report all discharges of more than thirty-three pounds per month of substances which, if otherwise disposed of, would be hazardous wastes. Users shall also report any discharge of acutely hazardous wastes as specified in 40 CFR 261.30(d) and 261.33(e). Subsequent months during which the user discharges more of a hazardous waste for which notice has already been provided do not require another notification to EPA or the state, but shall be reported to the public works director.

(c)    If new regulations under RCRA describe additional hazardous characteristics or substances as a hazardous waste, the user shall provide notifications under subsection (a) of this section, if required by subsection (b) of this section, within ninety days of the effective date of such regulations.

(d)    For any notification made under this section, the user shall certify that it has a program in place to reduce the volume and toxicity of hazardous wastes generated to the degree it has determined to be economically practical and shall describe that program and reductions obtained through its implementation.

(e)    This provision does not create a right to discharge any substance not otherwise permitted to be discharged by this chapter, a permit issued thereunder, or any applicable federal or state law. (Ord. 1367 § 1 (part), 2012).

12.26.400 Analytical requirements.

All pollutant sampling and analyses required under this chapter shall conform to the most current version of 40 CFR Part 136, unless otherwise specified in an applicable categorical pretreatment standard. If 40 CFR Part 136 does not contain sampling or analytical techniques for a pollutant, or the public works director determines that the 40 CFR Part 136 sampling and analytical techniques are inconsistent with the goal of the sampling, the public works director may specify an analytical method. If neither case applies, users shall use validated analytical methods or applicable sampling and analytical procedures approved by EPA. (Ord. 1367 § 1 (part), 2012).

12.26.410 Sample collection.

Users shall ensure all samples they collect to satisfy sampling requirements under this chapter are representative of the range of conditions occurring during the reporting period. Users shall also ensure that, when specified, samples are collected during the specific period.

(a)    Users shall use properly cleaned sample containers appropriate for the sample analysis and sample collection and preservation protocols specified in 40 CFR Part 136 and appropriate EPA guidance.

(b)    Users shall obtain samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds using grab collection techniques.

(c)    For certain pollutants, users may composite multiple grab samples taken over a twenty-four-hour period. Users may composite grab samples for cyanide, total phenols, and sulfides either in the laboratory or in the field, and may composite grab samples for volatile organics and oil and grease in the laboratory prior to analysis.

(d)    For all other pollutants, users shall employ twenty-four-hour flow proportional composite samplers unless the public works director authorizes or requires an alternative sample collection method.

(e)    The public works director may authorize composite samples for parameters unaffected by the compositing procedures, as appropriate.

(f)    The public works director may require grab samples either in lieu of or in addition to composite sampling to show compliance with instantaneous discharge limits.

(g)    In all cases, users shall take care to ensure the samples are representative of their wastewater discharges.

(h)    Users sampling to complete baseline monitoring and ninety-day compliance reports required by Sections 12.26.310 and 12.26.330, shall satisfy some specific requirements. These reports require at least four grab samples for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds. Users may composite samples prior to analysis if allowed in subsection (c) of this section. Where historical sampling data exists, the public works director may also authorize fewer samples.

(i)    For periodic monitoring reports (Section 12.26.340), the public works director may specify the number of grab samples necessary to assess and assure compliance with applicable pretreatment standards and requirements. (Ord. 1367 § 1 (part), 2012).

12.26.420 Date of receipt of reports.

The public works director will credit written reports as having been submitted on the date of the postmark when mailed through the United States Postal Service. Reports delivered in any other manner will be credited as having been submitted on the business day received. (Ord. 1367 § 1 (part), 2012).

12.26.430 Record keeping.

Users subject to reporting requirements of this chapter shall retain the below records for all monitoring required by this chapter and for any additional monitoring which could be used to satisfy minimum monitoring requirements. Users shall make these records available for inspection and copying at the location of the discharge. Users shall similarly maintain documentation associated with any best management practices required under authority of Section 12.26.080(g). Monitoring records shall include at least:

(a)    The time, date, and place of sampling;

(b)    The sampling and preservation methods used;

(c)    The person taking the sample, and persons with control of the sample prior to analysis;

(d)    The person performing the analysis and the date the analysis was completed;

(e)    The analytical techniques or methods used; and

(f)    The results of analysis.

Users are encouraged to retain quality control and quality assurance information provided by the laboratory and submit this information in routine reporting. This information also has value in the event that the sample data is called into question. For analytes for which Washington State requires use of a certified/accredited laboratory, users shall maintain the scope of accreditation for laboratories performing any analyses for them.

Users shall maintain the above records for at least three years, until any litigation concerning the user or the city of Othello is complete, or for longer periods when the user has been specifically notified of a longer retention period by the public works director. (Ord. 1367 § 1 (part), 2012).

12.26.440 Certification statements.

(a)    The following certification statement shall be signed by an authorized representative as defined by Section 12.26.040(c) and included when submitting:

(1)    A permit (re)application in accordance with Section 12.26.210;

(2)    A baseline monitoring report under Section 12.26.310(b);

(3)    A report on compliance with the categorical pretreatment standard deadlines under Section 12.26.330;

(4)    A periodic compliance report required by Section 12.26.340(a) through (d); or

(5)    An initial request to forego sampling of a pollutant based on Section 12.26.340(b)(4).

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

(b)    Annual Certification for Nonsignificant Categorical Industrial Users. A facility determined to be a nonsignificant categorical industrial user by the public works director pursuant to Sections 12.26.040(hh)(3) and 12.26.210(c) shall complete the below statement and submit it to the public works director annually. The statement shall be signed by an authorized representative (Section 12.26.040(c)):

Based on my inquiry of the person or persons directly responsible for managing compliance with the categorical Pretreatment Standards under 40 CFR ____, I certify that, to the best of my knowledge and belief that during the period from __________, ________ to ________, ________ [months, days, year]:

(a) The facility described as _______________________________ [facility name] met the definition of a non significant categorical Industrial User as described in Section 12.26.040(hh)(3) [40 CFR 403.3(v)(2)];

(b) the facility complied with all applicable Pretreatment Standards and requirements during this reporting period; and (c) the facility never discharged more than 100 gallons of total categorical wastewater on any given day during this reporting period.

This compliance certification is based upon the following information:

______________________________.

(c)    Certification of Pollutants Not Present. Users that have an approved monitoring waiver based on Section 12.26.340(b) shall also include the following certification statement in each report. This statement certifies that there has been no increase in the pollutant in its wastestream due to activities of the user:

Based on my inquiry of the person or persons directly responsible for managing compliance with the Pretreatment Standard for 40 CFR _______ [specify applicable National Pretreatment Standard part(s)], I certify that, to the best of my knowledge and belief, there has been no increase in the level of ______ [list pollutant(s)] in the wastewaters due to the activities at the facility since filing of the last periodic report under Section 12.26.340(a).

(Ord. 1367 § 1 (part), 2012).

12.26.450 Right of entry—Inspection and sampling.

The public works director shall have the right to enter the premises of any user to determine whether the user is complying with all requirements of this chapter and any wastewater discharge permit or order issued hereunder. Users shall allow the public works director ready access to all parts of the premises for the purposes of inspection, sampling, records examination and copying, and the performance of any additional duties.

(a)    Where a user has security measures in force which require proper identification and clearance before entry into its premises, the user shall make necessary arrangements with its security guards so that, upon presentation of suitable identification, the public works director will be permitted to enter without delay for the purposes of performing specific responsibilities.

(b)    The public works director shall have the right to set up on the user’s property, or require installation of, such devices as are necessary to conduct sampling and/or metering of the user’s operations.

(c)    Users shall provide full access to the public works director to use any monitoring facilities and utilities available or required in accordance with Sections 12.26.110 and 12.26.120(e) and (f) to confirm that the standards or treatment required for discharge to the sewer are being met.

(d)    Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the public works director and shall not be replaced. The costs of clearing such access shall be born by the user.

(e)    Any unreasonable delay in allowing the public works director full access to the user’s premises and wastewater operations shall be a violation of this chapter. (Ord. 1367 § 1 (part), 2012).

12.26.460 Search warrants.

The public works director may seek issuance of a search warrant from a judge of a competent jurisdiction. Such warrants may be secured when:

(a)    The public works director has been refused access or is unable to locate a representative who can authorize access to a building, structure, or property, or any part thereof, and has probable cause that a violation of this chapter is occurring on the premises;

(b)    The public works director has been denied access to inspect and/or sample as part of a routine inspection and sampling program of the city of Othello designed to verify compliance with this chapter or any permit or order issued hereunder; or

(c)    The public works director has cause to believe there is imminent endangerment of the overall public health, safety and welfare of the community by an activity on the premises. (Ord. 1367 § 1 (part), 2012).

12.26.470 Confidential information.

Generally, information submitted to demonstrate compliance with pretreatment standards and requirements will be freely available to the public. Users may have certain information, however, withheld as confidential if the following process is followed:

(a)    When a user submits information to the public works director, or provides information to inspectors, users may request that specific information be maintained as confidential. Users shall promptly identify the specific information in writing, and describe why the release would divulge information, processes, or methods of production entitled to protection as trade secrets or confidential business information under applicable state or federal laws.

(b)    The public works director shall review and approve or deny such requests. When approved, the information shall not be available as public records and shall be marked confidential.

(c)    All other information submitted to the public works director and obtained from the public works director’s oversight shall be available to the public subject to the city of Othello records review policy.

(d)    Information held as confidential may not be withheld from governmental agencies for uses related to the NPDES program or pretreatment program, or in enforcement proceedings involving the person furnishing the report.

(e)    Federal rules prevent wastewater constituents and characteristics and other effluent data, as defined by 40 CFR 2.302, from being recognized as confidential information. (Ord. 1367 § 1 (part), 2012).

12.26.480 Publication of users in significant noncompliance.

(a)    Publishing. The public works director shall annually publish a list of the users which, at any time during the previous twelve months, were in significant noncompliance with applicable pretreatment standards and requirements. The list will be published in a newspaper of general circulation that provides meaningful public notice within the jurisdictions served by the POTW.

(b)    Definition. The term “significant noncompliance” means:

(1)    Any violation of a pretreatment standard or requirement including numerical limits, narrative standards, and prohibitions, that the public works director determines has caused, alone or in combination with other discharges, interference or pass-through, including endangering the health of POTW personnel or the general public.

(2)    Any discharge of a pollutant that has caused imminent endangerment to the public or to the environment, or has resulted in the public works director’s exercise of his emergency authority to halt or prevent such a discharge.

(3)    Any violation(s), including of best management practices, which the public works director determines will adversely affect the operation or implementation of the local pretreatment program.

(4)    Chronic violations of wastewater discharge limits, defined here as those in which sixty-six percent or more of all of the measurements taken for the same pollutant parameter taken during a rolling six-month period exceed, by any magnitude, a numeric pretreatment standard or requirement, including instantaneous limits of Sections 12.26.050 through 12.26.100.

(5)    Technical review criteria (TRC) violations, defined here as those in which thirty-three percent or more of wastewater measurements taken for each pollutant parameter during a rolling six-month period equal or exceed the product of the numeric pretreatment standard or requirement (including instantaneous limits, as defined by Sections 12.26.050 through 12.26.100), multiplied by the applicable criteria. Applicable criteria are 1.4 for BOD, TSS, fats, oils and grease, and 1.2 for all other pollutants except pH.

(6)    Failure to meet, within ninety days of the scheduled date, a compliance schedule milestone contained in a wastewater discharge permit or enforcement order for starting construction, completing construction, or attaining final compliance.

(7)    Failure to provide any required report within forty-five calendar days after the due date. This includes initial and periodic monitoring reports, and reports on initial compliance and on meeting compliance schedules.

(8)    Failure to accurately report noncompliance.

(c)    Applicability. The criteria in subsections (b)(1) through (3) of this section are applicable to all users, whereas the criteria in subsections (b)(4) through (8) of this section are only applicable to SIUs. (Ord. 1367 § 1 (part), 2012).

12.26.490 Administrative enforcement remedies.

In administering the city of Othello pretreatment program, the public works director is obliged to follow the city of Othello pretreatment program’s approved procedures. In response to noncompliance with any requirement of this chapter, the public works director shall apply its enforcement response plan, which is a part of these approved procedures. This plan ensures that the application of remedies provided for in Sections 12.26.600 through 12.26.670 is appropriate to the violation, and consistent with the treatment of other users. Any person may review or obtain a copy (for a nominal charge) of the enforcement response plan by contacting the public works director. (Ord. 1367 § 1 (part), 2012).

12.26.500 Notification of violation.

The public works director may serve a written notice of violation on any user that the public works director finds has violated any provision of this chapter, including terms or requirements of a permit, order, or a pretreatment standard or requirement. In all cases in this chapter, a continuation of a violation of a provision of this chapter is a “violation.” Users shall, in response to a notice of violation, provide the public works director a written explanation of the violation, its cause, and a corrective action plan within thirty days of receiving this notice. Users submitting plans to correct noncompliance shall include the specific actions they will take to correct ongoing and prevent future violations at the soonest practicable date. The public works director’s acceptance of a plan does not relieve a user of liability for any violations. The public works director may also take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. (Ord. 1367 § 1 (part), 2012).

12.26.510 Consent orders.

The public works director may enter into a consent order or other voluntary agreement to memorialize agreements with users violating any requirement of this chapter. Such agreements shall include the specific action(s) required and date(s) they are to be completed to correct the noncompliance. Such documents shall be constructed in a judicially enforceable manner, and have the same force and effect as administrative orders issued pursuant Sections 12.26.530 and 12.26.540. (Ord. 1367 § 1 (part), 2012).

12.26.520 Show cause hearing.

The public works director may propose actions in response to a violation of any provision of this chapter, including a provision of a permit, order, or a pretreatment standard or requirement. The public works director may order a user in violation to appear at a date, time, and location set by the public works director to show why the proposed enforcement action should not be taken. The public works director will notify the user of the violation, the proposed action, the rationale, and the users rights and obligations to provide evidence why the proposed enforcement action should not be taken, and to provide its support for any alternative it proposes at this meeting. This notification shall be served personally or by registered or certified mail (return receipt requested) at least twenty days prior to the hearing. Such notice may be served on any authorized representative of the user as defined in Section 12.26.040(c). A show cause hearing shall not be a bar against, or prerequisite for, taking any other action against the user. (Ord. 1367 § 1 (part), 2012).

12.26.530 Compliance orders.

The public works director may issue a compliance order to any user which has violated any provision of this chapter including a requirement of a permit, order, or a pretreatment standard or requirement. The compliance order may direct that the user come into compliance within a specified time, install and properly operate adequate treatment facilities or devices, or take such measures as the public works director finds are reasonably necessary. These measures may include additional self monitoring and management practices designed to minimize the amount of pollutants discharged to the sewer. A compliance order may not extend the deadline for compliance established for a pretreatment standard or requirement, or relieve a user of liability for any violation, including a continuing violation. If the user does not come into compliance within the time provided, sewer service may be discontinued. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any other action against the user. (Ord. 1367 § 1 (part), 2012).

12.26.540 Cease and desist orders.

When the public works director finds that a user has violated, or continues to violate, any provision of this chapter, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, or that the user’s past violations are likely to recur, the public works director may issue an order to the user directing it to cease and desist all such violations and directing the user to:

(a)    Immediately comply with all requirements; and

(b)    Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. Issuance of a cease and desist order shall not be a bar against, or a prerequisite for, taking any other action against the user. (Ord. 1367 § 1 (part), 2012).

12.26.550 Administrative fines.

(a)    When the public works director finds that a user has violated, or continues to violate, any provision of this chapter, a wastewater discharge permit or order issued hereunder, or any other pretreatment standard or requirement, the public works director may fine such user in an amount not to exceed one thousand dollars. Such fines shall be assessed on a per violation, per day basis. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation.

(b)    The public works director may add the costs of any emergency response, additional monitoring, investigation, and administrative costs related to the noncompliance and the public works director’s response to the situation to the amount of the fine.

(c)    The public works director will consider the economic benefit enjoyed by a user as a result of the noncompliance in cases where there appears to have been a monetary benefit from not complying. In such cases, the public works director shall ensure that fines, to the maximum amounts allowable, exceed the benefit to the user from the noncompliance.

(d)    Unpaid charges, fines, and penalties shall, at thirty calendar days past the due date, be assessed an additional penalty of one percent of the unpaid balance, and interest shall accrue thereafter at a rate of one percent per month. After thirty days the city of Othello shall be authorized to file a lien against the user’s property for unpaid charges, fines, and penalties.

(e)    Users desiring to dispute such fines shall file a written request for the public works director to reconsider the fine along with full payment of the fine amount within fifteen working days of being notified of the fine. Where a request has merit, the public works director may convene a hearing on the matter. In the event the user’s appeal is successful, the public works director shall rebate the difference between the initial and final penalty amounts to the user.

(f)    Issuance of an administrative fine shall not be a bar against, or a prerequisite for, taking any other action against the user. (Ord. 1367 § 1 (part), 2012).

12.26.560 Emergency suspensions.

The public works director may immediately suspend a user’s discharge (or threatened discharge) when it reasonably appears to present a substantial danger to the health or welfare of the public. In such cases, the public works director will first provide informal notice to the user. The public works director may also immediately suspend a user’s discharge, after notice and opportunity to respond, that threatens to interfere with the operation of the POTW, or which presents, or may present, a danger to the environment.

(a)    Any user notified of a suspension of its discharge shall immediately stop or eliminate its contribution. If a user fails to immediately comply voluntarily with the suspension order, the public works director may take such steps as deemed necessary to protect the public and its interest in the sewer system. Remedies available to the public works director include immediately severing the sewer connection, at the user’s expense, turning off pump stations downstream of the user, and partnering with law enforcement. The public works director may not allow the user to recommence its discharge until the user has demonstrated to the satisfaction of the public works director that the situation warranting the suspension has been properly addressed and any proposed termination proceeding has been resolved.

(b)    A user that is responsible, in whole or in part, for any discharge presenting imminent endangerment shall submit a detailed written statement, describing the causes of the harmful contribution and the measures taken to prevent any future occurrence. Users shall submit this report to the public works director prior to the date of any show cause or termination hearing under Sections 12.26.520 and 12.26.570.

Nothing in this section shall be interpreted as requiring a hearing prior to any emergency suspension under this section. (Ord. 1367 § 1 (part), 2012).

12.26.570 Termination of discharge.

Any user who violates the following conditions is subject to having the privilege of discharging to the public sewer system withdrawn:

(a)    Discharge of nondomestic wastewater without a permit, including:

(1)    Where the appropriate permit has not been requested;

(2)    Where the appropriate permit has not yet been issued; or

(3)    Where the permit has been denied or revoked based on the provisions of Section 12.26.280.

(b)    Violation of permit terms and conditions including:

(1)    Exceeding any permit limit;

(2)    Failing to meet other pretreatment standards or requirements;

(3)    Violating any prohibition; or

(4)    Failing to properly monitor and report discharges or changed conditions.

(c)    Refusal of reasonable access to the user’s premises for the purpose of inspection, monitoring, or sampling (whether subject to a permit or not).

(d)    Violation of the pretreatment standards and requirements in Sections 12.26.050 through 12.26.100, including failure to satisfy industrial user survey requirements.

When the public works director determines this remedy is necessary and appropriate to fulfill the intentions of this chapter, such user will be notified of the proposed termination of its discharge and be offered an opportunity to show cause under Section 12.26.520 why the proposed action should not be taken. Exercise of this option by the public works director shall not be a bar to, or a prerequisite for, taking any other action against the user. (Ord. 1367 § 1 (part), 2012).

12.26.580 Injunctive relief.

When the public works director finds that a user has violated (or continues to violate) any provision of this chapter, a wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the public works director may petition the Adams County superior court through the city’s attorney for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the wastewater discharge permit, order, or other requirement imposed by this program on activities of the user. The city may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against a user. (Ord. 1367 § 1 (part), 2012).

12.26.590 Civil penalties.

(a)    A user which has violated, or continues to violate a provision of this chapter, including a pretreatment standard or requirement, or a permit or order issued hereunder shall be liable to the city of Othello for a maximum civil penalty of one thousand dollars per violation, per day. In the case of a monthly or other long-term average discharge limit, penalties shall accrue for each day during the period of the violation.

(b)    The public works director may recover reasonable attorney’s fees, court costs, and other expenses associated with any emergency response, enforcement activities, additional monitoring and oversight, and costs of any actual damages to the city of Othello.

(c)    In determining the amount of civil liability, the court shall take into account all relevant circumstances. The public works director shall provide the court a recommended civil penalty amount, and its basis. This basis will address, as available, the extent of harm caused, the magnitude and duration of the violation, any economic benefit gained, the timing of user’s actions and responses, corrective actions by the user, and the user’s compliance history. The public works director will provide the range of penalty amounts its enforcement response plan suggests if it addresses the situation and provides such guidance. The public works director will provide any other facts the court requests, or the public works director believes important for the court to have to render a just determination.

(d)    Filing a suit for civil penalties shall not be a bar against, or a prerequisite for, any other action the public works director may take to resolve noncompliance by a user. (Ord. 1367 § 1 (part), 2012).

12.26.600 Remedies nonexclusive.

The remedies provided for in this chapter are not exclusive. The public works director may take any, all, or any combination of these actions against a noncompliant user. Enforcement of pretreatment violations will generally be in accordance with the city of Othello’s enforcement response plan. However, the public works director may take other action against any user when the circumstances warrant. Further, the public works director is empowered to take more than one enforcement action against any noncompliant user. (Ord. 1367 § 1 (part), 2012).

12.26.610 Penalties for late reports.

The public works director may assess a penalty of one thousand dollars to any user for each day that a report required by this chapter, a permit or order issued hereunder is late. Penalties accrue beginning the fifth day after the report is due. The public works director’s actions to collect late reporting penalties shall not limit the public works director’s authority to initiate any other enforcement action. (Ord. 1367 § 1 (part), 2012).

12.26.620 Performance bonds.

The public works director may require a satisfactory bond, payable to the city of Othello, in a sum not to exceed a value determined by the public works director as necessary to assure the user will achieve consistent compliance with this chapter. The public works director may require this bond as an enforcement response or as a prerequisite to issue or reissue a wastewater discharge permit. Any user who has failed to comply with any provision of this chapter, a previous permit or order issued hereunder, or any other pretreatment standard or requirement may be subject to this requirement. This bond may also be required of any category of user which has led to public burdens in the past regardless of the compliance history of the particular user. The city may use this bond to pay any fees, costs, or penalties assessed to the user whenever the user’s account is in arrears for over thirty days. This includes the costs of cleanup of the site if the user goes out of business, sells the business to a person that does not first assume the bond, or goes bankrupt. Users may petition the public works director to convert their performance bond to a requirement to provide liability insurance, or to forego any such safeguard based on their performance. The user may petition no more frequently than once in any twelve-month period. (Ord. 1367 § 1 (part), 2012).

12.26.630 Liability insurance.

The public works director may require any user to provide insurance if they previously failed to comply with any provision of this chapter, a previous permit, or order issued hereunder, or any other pretreatment standard or requirement. The public works director may also require users in businesses which historically have left a public burden to clean up pollution to obtain this insurance, regardless of their compliance history. In such cases, users shall provide proof that the insurance is sufficient to cover any liabilities incurred under this chapter, including the cost of damages to the POTW and the environment caused by the user. The public works director may require users to provide the proof of such insurance either in response to noncompliance or prior to issuing or reissuing a wastewater discharge permit. (Ord. 1367 § 1 (part), 2012).

12.26.640 Payment of outstanding fees and penalties.

The public works director may decline to issue or reissue a wastewater discharge permit to any user who has failed to pay any outstanding fees, fines or penalties incurred as a result of any provision of this chapter, a previous permit or order issued hereunder. (Ord. 1367 § 1 (part), 2012).

12.26.650 Water supply severance.

The public works director may order water service to a user severed whenever a user has violated or continues to violate any provision of this chapter, a permit, or order issued hereunder, or any other pretreatment standard or requirement. Users wishing to restore their service shall first demonstrate their ability to comply with this chapter and pay the related costs of this action. (Ord. 1367 § 1 (part), 2012).

12.26.660 Public nuisances.

A violation of any provision of this chapter or a permit or order issued hereunder, or any other pretreatment standard or requirement, is hereby declared a public nuisance and shall be corrected or abated as directed by the public works director. Any person(s) creating a public nuisance shall be subject to the provisions of Chapter 8.26 governing such nuisances, including reimbursing the city of Othello for any costs incurred in removing, abating, or remedying said nuisance. (Ord. 1367 § 1 (part), 2012).

12.26.670 Contractor listing.

To the extent consistent with applicable state law, users that have not achieved compliance with applicable pretreatment standards and requirements are not eligible to receive a contractual award for the sale of goods or services to the city. Existing contracts for the sale of goods or services to the city held by a user found to be in significant noncompliance with pretreatment standards or requirements may, to the extent consistent with applicable state law, be terminated at the discretion of the city. (Ord. 1367 § 1 (part), 2012).

12.26.680 Upset.

(a)    For the purposes of this section, “upset” means an exceptional incident in which there is unintentional and temporary noncompliance with categorical pretreatment standards because of factors beyond the reasonable control of the user. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.

(b)    An upset shall constitute an affirmative defense to punitive actions in response to noncompliance with categorical pretreatment standards (Section 12.26.060), but not local limits (Section 12.26.080) when the requirements of subsection (c) of this section are met.

(c)    A user who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs, or other relevant evidence that:

(1)    An upset occurred and the user can identify the cause(s) of the upset.

(2)    The facility was at the time being operated in a prudent and workmanlike manner and was in compliance with applicable operation and maintenance procedures.

(3)    Where the upset involved reduction, loss, or failure of its treatment facility (e.g., a power failure), the user controlled production of all discharges to the extent necessary to maintain compliance with categorical pretreatment standards until the facility was restored or an alternative method of treatment was provided.

(4)    The user submitted the following information to the public works director within twenty-four hours of becoming aware of the upset. When initially provided orally, the user shall have provided a written report within five days:

(A)    A description of the indirect discharge and cause of noncompliance;

(B)    The period of noncompliance, including exact dates and times or, if not corrected, the anticipated time the noncompliance is expected to continue; and

(C)    Steps being taken and/or planned to reduce, eliminate, and prevent recurrence of the noncompliance.

(d)    In any enforcement proceeding, the user seeking to establish the occurrence of an upset shall have the burden of proof.

(e)    Users will have the opportunity for a judicial determination on any claim of upset only in an enforcement action brought for noncompliance with categorical pretreatment standards. (Ord. 1367 § 1 (part), 2012).

12.26.690 Prohibited discharge standards.

A user will have an affirmative defense to an enforcement action brought against it for noncompliance with the prohibitions in Section 12.26.050(a), and (b)(3) through (7) in certain cases. The user shall be able to prove that it did not know, or have reason to know, that its discharge, alone or in conjunction with discharges from other sources, would cause pass-through or interference and that either:

(a)    A local limit exists for each pollutant discharged and the user was in compliance with each limit directly prior to, and during, the pass-through or interference; or

(b)    No local limit exists, but the discharge did not change substantially in nature or constituents from the user’s prior discharge when the city of Othello was regularly in compliance with its NPDES permit, and in the case of interference, was in compliance with applicable sludge use or disposal requirements. (Ord. 1367 § 1 (part), 2012).

12.26.700 Bypass.

(a)    For the purposes of this section:

(1)    Bypass means the intentional diversion of wastestreams from any portion of a user’s treatment facility.

(2)    Severe property damage means substantial physical damage to property, damage to the treatment facilities which causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production.

(b)    A user may allow a bypass to occur if it does not cause pretreatment standards or requirements to be violated and is for essential maintenance to assure efficient operation.

(c)    Any other bypass shall meet the following requirements:

(1)    Users knowing in advance of the need for a bypass shall submit prior notice to the public works director, at least ten days before the bypass wherever possible.

(2)    Users shall inform the public works director of any unanticipated bypass that exceeds applicable pretreatment standards within twenty-four hours of becoming aware of the bypass. Users shall provide a written follow-up report within five days. The public works director may waive the written report if the oral report was timely and complete. Unless waived, the written report shall contain:

(A)    A description of the bypass (volume, pollutants, etc.);

(B)    What caused the bypass;

(C)    When, specifically, the bypass started and ended;

(D)    When the bypass is expected to stop (if ongoing); and

(E)    What steps the user has taken or plans to take to reduce, eliminate, and prevent the bypass from reoccurring.

(d)    Bypass.

(1)    Bypass is prohibited, and the public works director may take an enforcement action against a user for a bypass, unless:

(A)    Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;

(B)    There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate backup equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass which occurred during normal periods of equipment downtime or preventive maintenance; and

(C)    The user submitted notices as required under subsection (c) of this section.

(2)    The public works director may approve an anticipated bypass, after considering its adverse effects, if the public works director determines that it will meet the three conditions listed in subsection (d)(1) of this section. (Ord. 1367 § 1 (part), 2012).

12.26.710 Charges for strong waste.

It is the purpose of this section to provide for the payment of rates, charges and fees from dischargers to the city’s POTW; to compensate the city for the cost of administration of the program established within this chapter; and to pass on to the appropriate discharger those fees and charges for treatment and disposal at the city’s wastewater treatment plant.

Strong Waste. Should the concentration of any pollutant discharged to the POTW exceed the limits established in this chapter, including, but not limited to, biochemical oxygen demand (BOD) and suspended solids (SS) limits set forth below, the city shall levy a strong waste surcharge. The surcharge shall be calculated utilizing the national average values of pollutant concentrations typical to each classification under the standard industrial code or by actual concentrations verified by the city.

The surcharge shall be calculated as follows:

S

=

P x Pc x V x 8.34

where:

S

=

Surcharge for pollutants of excessive concentration (in dollars)

P

=

Concentration of a pollutant, greater than three hundred (in mg/l)

Pc

=

Strong waste charge to collect, treat and dispose of any pollutant (in dollars/pound)

V

=

Quantity of sewage flow (in million gallons/billing period)

8.34

=

Weight of one gallon of water (in pounds)

If a discharger disagrees with the national average values of pollutant concentration listed in the Standard Industrial Code, the discharger may request the city to perform sampling and testing to determine the values of pollutant concentrations in the discharger’s wastewater. The sampling and testing will be performed only by the city and sampling will be a composite sample taken during the time the discharger is discharging sewage. The samples shall be taken over a seven-day period. The discharger may specify which laboratory will provide the testing services for strength. Any laboratory selected must be certified by the Department of Ecology. The city will make all arrangements with the laboratory and the laboratory will send the test reports and their billing to the city. The city will furnish copies to the discharger.

The strong waste surcharge billed to the discharger will be based on the sampling and testing results, will be effective at the next billing period, and will continue until new sampling and testing is requested by the discharger or initiated by the city. The surcharge will not be retroactive.

The discharger shall pay all costs in connection with the sampling and testing when the work is requested by him.

The charges for discharger requested sampling and testing shall be composed of two parts:

City sampling costs (seven days)

$200.00

Laboratory testing charged

As billed by the laboratory

(Ord. 1367 § 1 (part), 2012).

12.26.720 Miscellaneous.

The fees and charges established herein may be amended from time to time by ordinance of the city council upon recommendation of the public works director. Any such amendments shall be based on changes in the city’s costs of collection, treating and/or disposing of industrial wastewater, to include, but not be limited to, any changes in the costs of providing sampling, laboratory, and miscellaneous services. In determining whether there have been changes in the costs of providing service, the city council may consider the city’s expenses associated with obtaining services from private laboratories and other third persons, as well as the city’s own administrative and other costs.

The public works director shall maintain a schedule of current rates, fees and charges, and shall post such schedule conspicuously, and make copies available to all interested persons. Upon request, the public works director shall prepare an estimate of annual rates, fees and charges for an industrial discharger. (Ord. 1367 § 1 (part), 2012).

12.26.730 Pretreatment charges and fees.

The city of Othello may adopt reasonable fees for reimbursement of costs of setting up and operating the city of Othello’s pretreatment program which may include:

(a)    Fees for wastewater discharge permit applications including the cost of processing such applications;

(b)    Fees for monitoring, inspection, and surveillance procedures including the cost of collection and analyzing a user’s discharge, and reviewing monitoring reports submitted by users;

(c)    Fees for reviewing and responding to accidental discharge procedures and construction;

(d)    Fees for filing appeals;

(e)    Fees to recover administrative and legal costs (not included in subsection (b) of this section) associated with the enforcement activity taken by the public works director to address IU noncompliance; and

(f)    Other fees as the city of Othello may deem necessary to carry out the requirements contained herein. These fees relate solely to the matters covered by this chapter and are separate from all other fees, fines, and penalties chargeable by the city of Othello. (Ord. 1367 § 1 (part), 2012).

12.26.740 Severability.

If any provision of this chapter is invalidated by any court of competent jurisdiction, the remaining provisions shall not be affected and shall continue in full force and effect. (Ord. 1367 § 1 (part), 2012).