Chapter 13.12
INSPECTION

Sections:

13.12.010    Inspection required – When to be made.

Prior legislation: Ords. 227 and 281.

13.12.010 Inspection required – When to be made.

The applicant for the building or side sewer permit shall notify the building inspector when the building sewer is ready for inspection and shall notify the city engineer two working days before connecting to the public sewer. The sewer connection shall be made by a properly licensed and bonded contractor under the supervision of the city engineer or his/her representative. The connection shall not be made unless and until the building inspector has approved the building sewer. [Ord. 37-06 § 1, 2006; Ord. 16-03 § 1, 2003].