Chapter 3.20
FEES AND CHARGES

Sections:

3.20.010    Schedule of fees and charges – Land use.

3.20.015    Schedule of fees and charges – Supplemental land use.

3.20.020    Schedule of fees and charges – Miscellaneous.

3.20.010 Schedule of fees and charges – Land use.

The Everson unified schedule of land use fees and charges is as follows:

Land Use Event/Action

Reference

Fee

Annexation

Application

EMC 1.28.010

$500.00

Administrative Interpretation

EMC 16.01.150

$100.00

Appeals, Nonjudicial

Filing fee

EMC 16.01.160(C)

$300.00

Pre-Application Conference

EMC 16.01.060

$50.00

Construction

Building Permit

Per UBC fee schedule

Manufactured Homes (inspection)

EMC 15.04.094

For unit up to (≤) 15 feet wide:

$75.00

For unit over (>) 15 feet wide:

$100.00

Additional inspections (each)

$35.00

Modular Homes (inspection)

EMC 15.04.092

For unit up to (≤) 15 feet wide:

$75.00

For unit over (>) 15 feet wide:

$100.00

Additional inspections (each)

$35.00

Moved Buildings (inspection)

EMC 15.04.090

Inspection inside City

$50.00

Inspection outside City

$50.00

(per hour, including travel time)

Mileage charge (per mile round trip)

Per IRS rate

Floodplain

Development permit application

EMC 15.10.031

$300.00

Elevation verification

EMC 15.10.031

$50.00

Variance application

EMC 15.10.034

$300.00

Administrative appeals

EMC 15.10.034

$300.00

Land Development

Impact identification costs

EMC 16.08.060(C)

See text

Grading plan review and permit

Per UBC fee schedule

Natural Resources (Critical Areas)

Critical areas review

EMC 16.12.040

$200.00

Critical areas variance

EMC 16.12.085

$500.00

Reasonable use exception application

EMC 16.12.087

$300.00

Park Impact Fee

Single-family residence (per unit)

$1,200.00

Multifamily dwelling (per residential unit)

$960.00

Shoreline Development

Substantial development permit

EMC 16.04.010

$500.00

Conditional use permit

EMC 16.04.010

$500.00

Variance

EMC 16.04.010

$300.00

Exemption

EMC 16.04.010

$50.00

State Environmental Policy Act (SEPA)

Checklist review

EMC 16.02.820(A)

$150.00

Determination

$50.00

EIS preparation costs

EMC 16.02.820(B)

See text

Public notice costs

EMC 16.02.820(C)

See text

Streets

Right-of-way permit – Mailbox

EMC 12.12.020

$nil

Right-of-way permit – Other

EMC 12.12.020

$50.00

State highway access permit

EMC 12.16.030

$50.00

Street or alley vacation

$150.00

Subdivisions

Variance from standards application

EMC 18.01.020

$200.00

Short subdivision

EMC 18.08.020

$500.00

plus per lot

$50.00

Short plat final approval (per lot)

$200.00

Long subdivision preliminary plat

EMC 18.12.020(L)

$1,300.00

plus per lot

$40.00

Final plat (per lot)

EMC 18.24.020(H)

$200.00

Binding site plan – preliminary

EMC 18.28.030

$1,300.00

plus per unit

$150.00

Binding site plan – final (per lot)

EMC 18.28.040

$200.00

Lot line adjustment (per adjusted lot)

$50.00

Utility plan review and inspection

$50.00 per hour

Zoning

Conditional use

EMC 19.11.040

$500.00

Variance

EMC 19.11.040

$300.00

Site-specific zone change

EMC 19.11.040

$500.00

Administrative appeal

EMC 16.01.160

$300.00

Sign permit

EMC 19.41.150

$25.00

Sign permit with design review

EMC 19.41.150

$100.00

Sign permit with City Council review

EMC 19.41.150

$300.00

Comprehensive Plan

Proposed amendment

EMC 19.04.050

$750.00

[Ord. 691 § 1, 2009; Ord. 655 § 1, 2006; Ord. 609 § 2, 2003; Ord. 597 § 6, 2002; Ord. 501 § 56, 1996.]

3.20.015 Schedule of fees and charges – Supplemental land use.

The Everson unified schedule of supplemental land use fees and charges is as follows:

A. Applicants for the following land use permits, applications and approvals shall be responsible for the payment of all costs incurred by the City related to public notice and public hearing, including publication, signage, and mailings as may be required by law or ordinance: annexations, sign permits requiring City Council approval and any Class III permit not identified under subsection B of this section.

B. Applicants for the following land use permits, applications and approvals shall be responsible for payment of all costs incurred by the City related to public notice, including publication, signage and mailings, all costs incurred by the City for third-party review, such as for engineering and environmental review and inspections, and the costs of a court reporter for a public hearing as determined to be necessary by the Mayor or City Attorney: floodplain variance, land development impact identification, grading permit, critical areas review, critical areas variance, reasonable use exception, shoreline substantial development, shoreline conditional use, shoreline variance, street or alley vacation, subdivision variance, short subdivision, preliminary plat, binding site plan, subdivision utility plan review and inspection, zoning conditional use, zoning variance, site-specific zone change, and comprehensive plan amendment. [Ord. 655 § 2, 2006.]

3.20.020 Schedule of fees and charges – Miscellaneous.

The Everson unified schedule of miscellaneous fees and charges is as follows:

License or Event

Fee

Business License

Fixed place of business (annual):

Initial license

EMC 5.02.040

$30.00

Renewals

EMC 5.02.040

$30.00

Nonfixed place of business (including door-to-door sales):

Annually

EMC 5.02.040

$30.00

Monthly

EMC 5.02.040

$15.00

Dog License

Spayed or neutered dog

EMC 6.08.050

$10.00

Any other dog

EMC 6.08.050

$20.00

Police Report Copies

EMC 9.05.260

$10.00

[Ord. 597 § 7, 2002.]