4-8-120 SUBMITTAL REQUIREMENTS – SPECIFIC TO APPLICATION TYPE:

The following tables list the submittal requirements for each type of permit application or land use approval which must accompany the required application fees specified in RMC 4-1-140 through 4-1-200.

A. Table 4-8-120A – Public Works Permit Submittal Requirements.

B. Table 4-8-120B – Building Section Permit Submittal Requirements.

C. Table 4-8-120C – Land Use Permit Submittal Requirements.A

TABLE 4-8-120A

PUBLIC WORKS APPLICATIONS

 

 

 

 

 

SUBMITTAL REQUIREMENTS

TYPE OF
APPLICATION/PERMIT

Utility Construction
Permit (Sewer and/or
Water)

Stormwater
Construction Permit

Roadway Construction
Permit

Combined Permit
(includes Plats)

APA Operating Permit

APA Closure Permit

Biological Assessment/Critical Area Study

5(d)

5(d)

5(d)

5(d)

 

 

Closure Permit Application Form

 

 

 

 

 

1(b)

Construction Permit Application Form

1

1

1

2

 

 

Construction Mitigation Description

3

3

3

4

 

 

Drainage Plans

 

3

3

3

 

 

Drainage Report

 

2

2

2

 

 

Erosion Control Plan (Temporary)

3

3

3

3

 

 

Geotechnical Report

3

2

1

2

 

 

Grading Plans

 

3

3

4

 

 

Hazardous Materials Management Statement

1(b)

1(b)

1(b)

1(b)

 

 

Landscape Plan, Detailed

3

3

3

3

 

 

Neighborhood Detail Map

3

3

3

3

 

 

Operating Permit Application

 

 

 

 

1

 

Roadway Construction Plans

 

 

3

3

 

 

Source Statement, Fill Material

1(b)

1(b)

1(b)

1(b)

 

 

Stream or Lake Study

1(c)

1(c)

1(c)

1(c)

 

 

Street Lighting Plans

 

 

3

3

 

 

Topography Map

3

3

3

4

 

 

Tree Retention/Inventory/Land Clearing Plan – Approved

3

3

3

3

 

 

Utilities Plans – Engineered

3

3

3

4

 

 

Wetlands Assessment

1(a)

1(a)

1(a)

1(a)

 

 

Table 4-8-120A Legend:

The number of copies required (if any) is indicated for each type of application and each submittal requirement, unless waived by the Development Services Division Plan Review Supervisor. Waiver of aquifer permit submittal requirements may be granted by the Water Utility.

(a) Required when wetlands are present on-site.

(b) Required when project is located in Zones 1 or 2 of an aquifer protection area.

(c) A standard stream or lake study is required for any application proposal. A supplemental study is required if an unclassified stream is involved, or if there are proposed alterations of the water body or buffer.

(d) Only required when project is located in designated floodplain.

(Ord. 4587, 3-18-1996; Amd. Ord. 4851, 8-7-2000; Ord. 5137, 4-25-2005; Ord. 5304, 9-17-2007; Ord. 5528, 3-8-2010; Ord. 5675, 12-3-2012)

B.

TABLE 4-8-120B

BUILDING APPLICATIONS

 

 

 

 

 

 

 

 

 

SUBMITTAL REQUIREMENTS

TYPE OF
APPLICATION/PERMIT

Demolition

Grading/Fill

Manufactured Home in
Manufactured Home Park

Manufactured Home Outside
of Manufactured Home Park

Multi-Family/Commercial/
Industrial New or Additions

Commercial/Industrial
Interior Remodel

Pool/Spa

Sign

Single Family/Duplex New
or Additions

Single Family/Multi-Family
Interior Remodel

Applicant Agreement Statement (for wireless communications facilities only)

 

 

 

 

3

 

 

 

 

 

Application Form, Building Division

1

2

1

1

2

1

1

1

1

1

Application Form, Construction Permit

 

2

 

 

2

 

 

 

 

 

Architectural Elevations

 

 

 

 

5

 

 

 

2(q)

 

Architectural Plans, Commercial/Industrial/Attached Dwellings 3+ Units

 

 

 

 

4

3(n)

 

 

 

 

Architectural Plans, Detached and 2 Attached Dwellings

 

 

 

 

 

 

 

 

2

2

Biological Assessment/Critical Areas Study

5(s)

5(s)

5(s)

5(s)

5(s)

 

5(s)

 

5(s)

 

Blocking/Anchoring/Skirting Details

 

 

2

 

 

 

 

 

 

 

Construction Mitigation Description

 

1

 

 

2

 

 

 

 

 

Drainage Plans

 

2

 

 

5

 

 

 

2(h)

 

Drainage Report

 

 

 

 

2

 

 

 

 

 

Electrical Plans

 

 

 

 

2

2

1(g)

 

 

 

Energy Code Checklist, Nonresidential

 

 

 

 

1(m)

1

 

 

 

 

Energy Code Checklist, Residential

 

 

 

 

1(k)

 

 

 

1

1(a)

Foundation Plans

 

 

 

2

4

 

 

2

2

 

Geotechnical Report

 

 

 

2(b)

4

 

 

 

2(b)

 

Grading Plan

 

5

 

 

5

 

 

 

 

 

Grading Work Description

 

4

 

 

2

 

 

 

 

 

Hazardous Materials Management Statement

2(o)

2(o)

2(o)

2(o)

2(o)

 

2(o)

 

2(o)

 

Heat Loss Calculation

 

 

 

 

 

 

 

 

1(c)

1(c)

Installer Certification

 

 

1

 

 

 

 

 

 

 

Inventory of Existing Sites (for wireless communications facilities only)

 

 

 

 

3

 

 

 

 

 

Irrigation Sprinkler Plans

 

 

 

 

3

 

 

 

 

 

King County Health Department-Approved Plans

 

 

 

 

1(f)

1(f)

1(g)

 

 

 

Land Use Permit Conditions, Approved (if any)

2

2

 

 

2

1

 

 

 

 

Landscape Plan, Detailed

 

 

 

 

4

 

 

 

4(r)

 

Lease Agreement, Draft (for wireless communications facilities only)

 

 

 

 

3

 

 

 

 

 

Manufacturer’s Plans

 

 

 

2

 

 

 

 

 

 

Mechanical Plans

 

 

 

 

3

2

 

 

 

 

Plumbing Plans

 

 

 

 

2(m)

2

 

 

 

 

Project Information Sheet (includes legal description)

2

2

 

2

5

3(n)

2

 

2

2

Receipt for Construction (Utility) Permit Application

 

 

 

 

2

 

 

 

1(h)

 

Roadway Construction Plan

 

 

 

 

2

 

 

 

 

 

Screening Detail, Refuse/Recycling

 

 

 

 

3

 

 

 

 

 

Service Area Map (for wireless communications facilities only)

 

 

 

 

3

 

 

 

 

 

Side Sewer Capping Permit, Finaled

1

 

 

 

 

 

 

 

 

 

Sign Plan

 

 

 

 

 

 

 

3

 

 

Site Plan, Commercial, Industrial, Multi-Family

 

 

 

 

5

 

 

1

 

 

Site Plan, Sign

 

 

 

 

 

 

 

2

 

 

Site Plan, Single Family/Duplex

 

 

2

2

 

 

2(d)

 

2

 

Source Statement, Fill Material, Aquifer Protection Areas

2(p)

2(p)

2(p)

2(p)

2(p)

 

2(p)

 

2(p)

 

Structural Calculations

 

 

 

2

3

2(e)

2(g)

2

2(i)

 

Structural Plans

 

 

 

2

3

2(e)

2(g)

2

2(j)

 

Topography Map (may be combined with site plan or grading plan)

 

2

2

2

4

 

 

 

2

 

Tree Retention/Land Clearing Plan, Approved

 

2

 

 

3

 

2(d)

 

 

 

Utilities Construction Plans

 

 

 

 

6

1

 

 

 

 

Water/Sewer Availability Letter

 

 

 

 

1(j)(k)

 

 

 

1(j)

1(a)(j)

Water Service Disconnect Request (final)

1

 

 

 

 

 

 

 

 

 

WSEC Trade-Off Form

 

 

 

 

 

 

 

 

1(l)

 

Table 4-8-120B Legend:

 

 

a. Required for any alteration of exterior of (heated) building envelope.

b. When required for foundations or retaining walls by the IBC.

c. Required for installation of a new furnace or a replacement of greater size.

d. Not required for pools/spas/hot tubs to be installed within an existing building.

e. Required for structural changes only.

f. Required for food service establishments only.

g. Required only for public pools/spas/hot tubs (not required for single family or duplex pools/spas/hot tubs).

h. Required for duplexes only.

i. Required for other than conventional construction.

j. Required only if trade-off option is being used for compliance.

k. For multi-family, one per building.

l. Not required for additions.

m. Not required for multi-family projects.

n. For restaurants and any construction project involving work in the right-of-way, four (4) copies are required.

o. Required only when project is located in an Aquifer Protection Area and (1) construction vehicles will be refueled on site and/or (2) the quantity of hazardous materials that will be stored, dispensed, used, and handled on the construction site, exclusive of the quantity of hazardous materials contained in fuel or fluid reservoirs of construction vehicles, will exceed twenty (20) gallons. Weight of solid hazardous materials will be converted to volumes for purposes of determining whether de minimis amount is exceeded. Ten (10) pounds shall be considered equal to one gallon.

p. Required only when project is located in an Aquifer Protection Area.

q. For accessory dwelling units (detached) architectural elevations of the primary dwelling unit are also required.

r. For non-exempted projects: Trees only required for those properties where street trees in the right-of-way have not been planted, except for the RC and R-1 zones, where two trees shall be planted in the front yard.

s. Only required when project is located in designated floodplain.

(Ord. 4587, 3-18-1996; Amd. Ord. 4773, 3-22-1999; Ord. 4835, 3-27-2000; Ord. 4851, 8-7-2000; Ord. 4992, 12-9-2002; Ord. 5100, 11-1-2004; Ord. 5304, 9-17-2007; Ord. 5450, 3-2-2009; Ord. 5473, 7-13-2009; Ord. 5520, 12-14-2009; Ord. 5528, 3-8-2010; Ord. 5675, 12-3-2012)

The number of copies (if any) is indicated in each column unless waived by the Development Services Division.

C.  

TABLE 4-8-120C

LAND USE APPLICATIONS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SUBMITTAL REQUIREMENTS

TYPE OF APPLICATION/PERMIT

Additional Animals Permit

Annexation (10% Notice of Intent)

Annexation (60% Petition)

Appeal

Business License for Home Occupation1

Comp. Plan Map Amendment/Rezone

Comp. Plan Map Text Amendment

Conditional Use Permit (Administrative)

Conditional Use Permit (Hearing Examiner)

Critical Area Permit

Environmental Review

Environmental Review (Nonproject)

Grade and Fill Permit (Special)

Lot Line Adjustment

Master Site Plan (Overall)

Master Site Plan (Individual Phases)

Mobile Home Park, Preliminary

Mobile Home Park, Final

Modification/Alternate Request

Plat, Final

Plat, Preliminary/Binding Site Plan

PUD, Preliminary

PUD, Final

Rezone

Routine Vegetation Management Permit

Shoreline Exemption

Shoreline Substantial Development Permit

Shoreline Conditional Use Permit

Shoreline Variance

Short Plat, Preliminary

Short Plat, Final/Binding Site Plan

Site Plan

Special Permit

Temporary Use Permit9

Variance

Waiver

10% Notice of Intent to Annex

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

60% Petition to Annex

 

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Additional Animals Application Form

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Affidavit of Installation of Public Information Sign

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2

 

2

 

 

 

 

 

 

2

 

 

 

2

 

 

Applicant Agreement Statement (for wireless communication facilities)

 

 

 

 

 

 

 

510

5

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Applicant’s Confirmation of Condition Compliance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

5

 

 

5

 

 

 

 

 

 

 

5

 

 

 

 

 

Application Fee per the City of Renton Fee Schedule Brochure

x

 

 

x

x

x

x

x

x

 

x

x

x

x

x

 

x

x

 

x

x

x

x

x

x

 

x

x

x

x

 

x

x

x

x

 

Assessment Information

 

1

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Authorization for Abatement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

Binding Site Plan Map

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Biological Assessment/Critical Areas Study when project located in a designated floodplain

 

 

 

 

 

 

 

 

 

 

5

 

5

 

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

5

 

5

5

5

 

 

Business License Application for Home Occupation

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Calculations, Survey

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

3

 

 

3

 

 

 

 

 

 

 

3

 

 

 

 

 

Colored Display Maps

 

 

 

 

 

 

 

 

1

 

 

 

1

 

1

 

1

1

 

 

1

1

1

1

 

 

1

1

1

15

 

1

1

 

1

 

Construction Mitigation Description

 

 

 

 

 

 

 

5

5

5

5

 

5

 

 

 

5

 

 

 

5

5

 

 

5

 

5

5

5

5

 

5

5

5

 

 

Draft Deed for Any Proposed Dedication of Land for Public Purposes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

4

 

4

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

Draft Homeowners’ Association Documents, if applicable

 

 

 

 

 

 

 

4

4

 

 

 

 

 

 

 

 

4

 

4

 

 

4

 

 

 

 

 

 

 

4

4

 

 

 

 

Draft Restrictive Covenants, if any

 

 

 

 

 

 

 

4

4

 

4

 

4

 

 

 

 

4

 

4

 

 

4

4

 

 

 

 

 

 

4

4

 

 

 

 

Drainage Control Plan

 

 

 

 

 

 

 

5

5

5

5

 

5

4

5

 

5

 

 

 

5

5

 

 

 

 

5

5

 

5

 

5

 

 

 

 

Drainage Report

 

 

 

 

 

 

 

4

4

4

4

 

4

3

4

 

4

 

 

 

4

4

 

 

 

 

4

4

 

4

 

4

 

 

 

 

Elevations, Architectural

 

 

 

 

 

 

 

12

12

 

12

 

 

 

12

 

 

 

 

 

 

12

12

 

 

 

12

12

12

 

 

12

12

5

10

 

Elevations, Grading

 

 

 

 

 

 

 

4

4

4

4

 

4

 

 

 

4

4

 

 

4

4

 

 

 

 

4

4

 

 

4

4

4

 

 

 

Environmental Checklist

 

 

13

 

 

2

9

12

12

12

12

12

12

 

12

 

12

 

 

 

12

12

 

12

 

 

12

12

12

12

 

12

12

 

 

 

Existing Covenants (recorded copy)

 

 

 

 

 

2

 

5

5

5

5

 

5

5

5

 

5

 

 

 

5

5

 

5

 

 

5

5

5

5

 

5

5

 

5

 

Existing Easements (recorded copy)

 

 

 

 

 

2

 

5

5

5

5

 

5

5

5

 

5

 

 

 

5

5

 

5

 

 

5

5

5

5

 

5

5

 

5

 

Final Plat Plan

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Flood Hazard Data, if applicable

 

 

 

 

 

 

 

12

12

12

12

 

12

 

12

 

12

 

 

12

 

12

12

 

 

 

12

12

12

12

 

12

12

12

12

 

Floor Plans

 

 

 

 

 

 

 

5

5

5

5

 

 

 

 

 

 

 

 

5

 

5

5

 

 

 

5

5

5

 

 

5

5

5

5

 

Geotechnical Report

 

 

 

 

 

 

 

5

5

5

5

 

 

 

5

 

 

 

 

5

 

5

5

 

 

 

5

5

5

 

 

5

5

5

5

 

Grading Plan, Conceptual

 

 

 

 

 

 

 

123

123

 

12

 

 

 

12

 

12

 

 

 

12

12