Chapter 4.04
ENGINEERING FEES Revised 1/22
4.04.000 Chapter Contents
Sections:
4.04.010 Assessment of fees. Revised 1/22
(Ord. 6333 §2; 2004 (reenacted section); Ord. 6333 §1, 2004 (repealed section).
4.04.010 Assessment of fees Revised 1/22
A. Commencing January 1, 2022, the following fee schedule shall be in full force and effect.
|
Application Type |
|
|---|---|
|
Plan Check Fees |
Engineering Fee Schedule |
|
Water Main Extension (For projects outside city limits, fees will increase by 25%) |
$452.00 + $0.50 per linear foot or part thereof |
|
Sewer Main Extension (For projects outside city limits, fees will increase by 25%) |
$452.00 + $0.50 per linear foot or part thereof |
|
Reclaimed Water Main or Service Extension |
$452.00 + $0.50 per linear foot or part thereof |
|
Streets |
$452.00 + $0.50 per linear foot or part thereof |
|
Curb and Sidewalk |
$452.00 + $0.50 per linear foot or part thereof |
|
Storm On-Site |
$600.00 + $37.00 per Acre Gross Parcel Area |
|
Storm Pipe |
$452.00 + $0.50 per linear foot or part thereof |
|
Street Lighting (For projects outside city limits, fees will increase by 25%) |
$452.00 + $0.50 per linear foot or part thereof |
|
Driveway: Commercial |
$678.00 each |
|
STEP Sewer System: Commercial |
$1,355.00 each |
|
Sewer Pump Station |
$1,555.00 each |
|
On-Site Community Septic System (For projects outside city limits, fees will increase by 25%) |
$1,355.00 each |
|
Traffic Signal |
$1,355.00 each |
|
Solid Waste Pad and/or enclosure |
$583.00 |
|
Landscape Plan Review |
$650.00 |
|
Resubmittal Fee |
50% of plan review fee starting with second resubmittal after the initial application |
|
Application Type |
|
|---|---|
|
Permit/Inspection Fees |
|
|
Single Family Residential Erosion Control Inspection (up to and including 5,000 sq ft) |
$205.00 each |
|
Single Family Residential Erosion Control Inspection (5,001 to 20,000 sq ft) |
$255.00 |
|
Residential Subdivision and Commercial Site fee |
|
|
Erosion Control and LID Inspection (based on lot size) (new building sites only) |
|
|
5,001 – 20,000 sq ft |
$255.00 |
|
20,001 – 40,000 sq ft |
$355.00 |
|
40,001 – 220,000 sq ft |
$455.00 |
|
Over 220,000 sq ft |
$575.00 |
|
*Note: Subdivision is based on total subdivision until all improvements are accepted by the City, then individual lot fees apply if a permit is being issued for work that disturbs ground or requires LID |
|
|
Streets and/or Alleys |
$2.30 per linear foot or part thereof |
|
Curb and/or sidewalk |
$2.30 per linear foot or part thereof |
|
Sidewalk Fee-in-lieu |
City Engineer’s estimate of actual cost |
|
Street lighting (For projects outside city limits, fees will increase by 25%) |
$1.60 per linear foot or part thereof |
|
Driveways: Residential |
$158.00 each |
|
Driveways: Commercial |
$788.00 each |
|
Sanitary Sewer Main (For projects outside city limits, fees will increase by 25%) |
$3.10 per linear foot or part thereof plus $1.50 per linear foot for Television Inspection |
|
STEP Sewer System: Residential (For projects outside city limits, fees will increase by 25%) |
$509.00 each |
|
STEP Sewer System: Commercial (For projects outside city limits, fees will increase by 25%) |
$1,019.00 each |
|
Sewer Pump Station |
$1,019.00 each |
|
On-Site Community Septic System (For projects outside city limits, fees will increase by 25%) |
$1,019.00 each |
|
Sewer Lateral Connection at Main |
$368.00 each |
|
Sewer Lateral Connection on Property |
$147.00 each |
|
Storm Sewer Main |
$3.10 per linear foot or part thereof plus $1.50 per linear foot for Television Inspection |
|
Storm On-Site System |
$677.00 each |
|
Water Main (For projects outside city limits, fees will increase by 25%) |
$3.10 per linear foot or part thereof |
|
Water Connection (New) |
$200.00 each |
|
Water Purity Sampling Test (Collected for second and subsequent tests for the same system) |
Actual Costs to be Assessed |
|
Water Main Shutdown (collected for second or subsequent request for the same system) |
Actual Costs to be Assessed |
|
Reclaimed Water Main or Service Connection |
$3.10 per linear foot or part thereof |
|
Reclaimed Water Connection (new) |
$200.00 each |
|
Reclaimed Water Sampling Test (Collected for second and subsequent tests for the same system) |
Actual Costs to be Assessed |
|
Reclaimed Water Main or Service Connection Shutdown (collected for second or subsequent request for the same system) |
Actual Costs to be Assessed |
|
Traffic Signal |
$1,575.00 each |
|
Solid Waste Pad and/or enclosure |
$250.00 |
|
Landscape |
$375.00 |
|
Bicycle Parking |
$315.00 |
|
Paving of Parking Lots (including re-paving) |
$0.06 per square foot or part thereof |
|
Right-of-Way Obstruction Permit (No Traffic Control Plan Required) |
$184.00 each |
|
Right-of-Way Obstruction Permit Right-of-Way Obstruction Permit (Traffic Control Plan Required, and on-site signage, cones, or flaggers needed) |
$562.00 each |
|
Right-of-Way Excavation/Restoration (Completion Bond Required before Issuance of a Permit equal to 125% value of the work) |
$184.00 each |
|
Right-of-Way Vacation Request |
$1,943.00 each |
|
Latecomer Reimbursement Contract |
$1,943.00 + 5% Administrative Fee (5% of the reimbursement amount shall be deducted by the city for administrative fees each time the city collects a latecomer fee from a property owner within the reimbursement area) |
|
UGA City Utility Availability Authorization |
$175.00 each |
|
Long Term Right-of-Way Use Authorization for Open Right-of-Way Use per Year |
$420.00 per year |
|
Street Closure Permit for Temporary Moving of Structures or Equipment |
$850.00 each |
|
Recording Fees for Bills of Sale, Easements, Deeds, Annexation Agreements |
$232.00 |
|
Recording Fees for Stormwater Maintenance Agreements |
$318.00 |
|
Private Utilities |
|
|
Private Utility (power, natural overhead, gas, telecommunications, CATV) (New development of systems): |
New Short Plat – (2-9 Lots) Plan Check: $225.00 Permit Fees: $80.00 |
|
|
New Long Plat – (10-25 Lots) Plan Check: $315.00 Permit Fees: $115.00 + $0.20 per linear foot or part thereof |
|
|
|
|
|
|
|
|
New Long Plat – (26+ Lots) Plan Check: $535.00 Permit Fees: $115.00 + $0.20 per linear foot or part thereof |
|
|
|
|
|
|
|
|
New Commercial: Plan Check: $315.00 Permit Fees: $100.00 |
|
|
|
|
|
|
|
|
New R-O-W Utilities (New or Extension) Plan Check: $263.00 + $1.00 per linear foot or part thereof Permit Fees: $95.00+$0.10 per linear foot or part thereof |
|
|
|
|
|
|
|
|
Repair/Replace Existing Plan Check: $263.00+ 1.00 per linear foot or part thereof Permit Fees: $95.00 +$0.10 per linear foot or part thereof New/Replace Pole: $95.00 per Each |
|
Resubmittal fees starting with second resubmittal after the initial application |
50% plan check fees |
|
Pavement Restoration Fee |
|
|
Base Fee |
$25.00 per square foot or part thereof |
|
Year 1 (new pavement) |
5X base fee |
|
Year 2 |
4X base fee |
|
Year 3 |
3X base fee |
|
Year 4 |
2X base fee |
|
Year 5 |
1X base fee |
|
Tree Protections and Replacement Ordinance Fee Schedule |
|
|
Tree Plan Review for New Commercial Development |
$875.00 each |
|
Tree Plan Review for New Multi-family Residential Development |
$945.00 each |
|
Tree Plan Review for New Subdivisions - 9 lots and less |
$725.00 each |
|
Tree Plan Review for New Subdivisions - 10 lots and more |
$945.00 + $26.00 per lot |
|
Tree Plan Field Inspection for New Commercial Development |
$875.00 each |
|
Tree Plan Field Inspection for New Multi-family Residential Development |
$945.00 each |
|
Tree Plan Field Inspection for New Subdivisions - 9 lots and less |
$725.00 each |
|
Tree Plan Review for New Subdivisions - 10 lots and more |
$945.00 +$26.00 per lot |
|
Tree Plan Review for Tree Trimming by Private Utility |
$345.00 + $0.10 per linear foot, or part thereof, of project |
|
Tree Plan Field Inspection for Tree Trimming by Private Utility |
$240.00+$0.10 per linear foot, or part thereof, of project |
|
Tree Conversion Option Harvest |
$150.00 per acre, or part thereof, to $3,000.00 maximum |
|
Technology Fee – applicable to all permits and plan review fees |
3.9% of permit/plan review fee |
(Ord. 7306 §1, 2021; Ord. 7219 §1, 2019; Ord. 7181 §1, 2019; Ord. 7164 §1, 2018; Ord. 7148 §1, 2018; Ord. 6890 §1, 2013; Ord. 6832 §1, 2012; Ord. 6790 §1, 2011; Ord. 6610 §1, 2008; Ord. 6447 §1, 2006; Ord. 6428 §1, 2006; Ord. 6333 §2; 2004 (reenacted section); Ord. 6333 §1, 2004 (repealed section); Ord. 6238 §1, 2002; Ord. 6183 §1; 2002; Ord. 6153 §1, 2001; Ord. 6059 §1, 2000; Ord. 5980 §1, 1999; Ord. 5862 §1, 1998; Ord. 5658 §1, 1996; Ord. 5577 §1, 1995; Ord. 5125 §1(part), 1990).