Chapter 6.52
SKAGIT COUNTY SEWER DISTRICTS

Sections:

6.52.010    Joint Tatoosh Sewer District.

6.52.020    Sewer District No. 1.

6.52.030    Sewer District No. 2.

6.52.040    Sewer District No. 3.

6.52.010 Joint Tatoosh Sewer District.

Joint Tatoosh Sewer District in Snohomish and Skagit Counties, Washington, is declared to be duly organized.

The boundaries of said district are hereby established as follows:

The SW 1/4 together with the SE 1/4 of the NW 1/4 together with the S 1/2 of the SE 1/4, all in Section 26, Township 33 N, R 4 E.W.M., Skagit County, Washington.

The SE 1/4 of Section 27, Township 33 N, R 4 E.W.M., Skagit County, Washington.

All of Section 35, Township 33 N, R 4 E.W.M., Skagit County, Washington.

The SW 1/4 together with the S 1/2 of the NW 1/4 together with the W 1/2 of the SE 1/4, all in Section 36, Township 33 N, R 4 E.W.M., Skagit County, Washington. (Res. 6145, 1973; 40 CJ 748)

6.52.020 Sewer District No. 1.

Sewer District No. 1 is declared to be duly organized.

The boundaries of said district are hereby established as follows:

All of the platted and unplatted lands in Government Lot 4, Section 27, Township 34 N, R 2 E.W.M., and that portion of Lot 67, Plat of Snee-Oosh as recorded in Volume 4 of Plats, Page 50, Records of Skagit County, Washington, which lies in the NE 1/4 of the SW 1/4 of said Section 27, Township 34 N, R 2 E.W.M.

Said district being further described as:

The E 1/2 of the NE 1/4 of the SW 1/4 and the SW 1/4 of the SE 1/4 and the SE 1/4 of the SE 1/4 of Section 27, Township 34, R 2 E.W.M. (Res. 28, 1968)

Also described as:

That portion of Government Lot 3 and the W 1/2 of the NE 1/4 of the SW 1/4 of Section 27, Township 34 N, R 2 E.W.M., described as follows: Beginning at the NE corner of said Government Lot 3; thence S 1° 31′ 10″ W, along the E line of said Government Lot 3, a distance of 725.30 feet to the true point of beginning, said point being the NE corner of that certain tract conveyed to George N. McMillian and Joe B. McMillian by deed recorded February 16, 1931, in Volume 157 of Deeds, Page 20, under Auditor's File number 241135; thence N 89° 26′20″ W, along the N line of said McMillian tract, a distance of 406.35 feet to a point on the line of ordinary high tide of Skagit Bay; thence SE along said line of ordinary high tide to a point on the E line of said Government Lot 3 and the E line of said McMillian tract; thence N 1° 31′10″ E, a distance of 83.58 feet to the SW corner of said NE 1/4 of the SW 1/4; thence continuing N 1° 31′10″ E, a distance of 250.00 feet; thence S 88° 28′50″ E, a distance of 128.55 feet; thence N 31° 14′47″ E, a distance of 352.55 feet to a point on the W right-of-way line of the County Road; thence NW, along the W right-of-way line of the County Road an arc distance of 248.73 feet, and which arc is subtended by a chord bearing N 37° 01′34″ W, a chord distance of 248.03 feet; thence N 88° 28′ 50″ W, a distance of 120.23 feet, to a point on the E line of said Government Lot 3; thence S 1° 31′ 10″ W, along said E line of Government Lot 3, a distance of 72.61 feet to the true point of beginning. (Res. 271, 1967)

Also being further described as:

A tract of land in Lot 1, Section 34, Township 34 N, R 2 E.W.M.

Beginning at a point 177.22 feet N 88° 50′ W from Government Monument set as the NE corner of said Lot 1, said point being the intersection of the W margin of County Road and the N line of Lot 1, thence N 88° 50′ W along said N line 640 feet to the E margin of County Road, thence S 73° 47′ E 290 feet along said E margin, thence right on a curve 598 feet radius, 373.8 feet; thence S 37° 58′ E 191.6 feet; thence left on a curve of 548 feet radius, 354.1 feet; thence S 75° 00′ 228.2 feet, thence right on a curve of 741.25 feet radius, 130 feet to intersect the W margin of County Road; thence N 44° 01′ W along W margin of County Road 1000 feet to the point of beginning, containing 5.25 acres, more or less, said tract of land being more specifically described as follows:

A tract of land in Lot 1, Section 34, Township 34 N, R 2 E.W.M.

Beginning at a point 177.22 feet N 88° 50′ W from that Government Monument set as the SW corner of the SE 1/4 of the SE 1/4 of Section 27, Township 34 N, R 2 E.W.M. (erroneously referred to in the above description as being the NE corner of said Lot 1), said point being the intersection of the W margin of County road and the N line of Lot 1, thence N 88° 50′ W along said N line 640 feet to the E margin of county road, thence S 73° 47′ E 290 feet along said E margin, thence right on a curve 598 feet radius, 373.8 feet, thence S 37° 58′ E 191.6 feet; thence left on a curve of 548 feet radius, 354.1 feet thence S 75° 00′ E 228.2 feet; thence right on a curve of 741.25 feet radius, 130 feet to intersect the W margin of county road; thence N 44° 01′ W along W margin of county road 1000 feet to the point of beginning, containing 5.25 acres, more or less. (As per Res. 29 and letter dated June 1, 1968)

6.52.030 Sewer District No. 2.

Sewer District No. 2 is declared to be duly organized.

The boundaries of said district are hereby established as follows:

Beginning at a point on the S line of the NE 1/4 of the NE 1/4 of Section 7, Township 33 N, R 5 E.W.M., where it intersects with the W right-of-way line of State Highway 9; thence N along said right-of-way line to a point of intersection with the centerline of Section 6, Township 33 N, R 5 E.W.M.; thence N along the centerline of said Section to the N line of said section; thence W along said N line to the E right-of-way line of State Highway 9; thence N along said E line to the N line of Government Lot 7, Section 36, Township 34 N, R 4 E.W.M.; thence E along said N line 500 feet; thence N parallel to and 500 feet from the E right-of-way line of State Highway 9 to the N line of Tax 28, Section 36, Township 34 N, R 4 E.W.M.; thence W along said N line to the E right-of-way line of State Highway 9; thence N along said E right-of-way line to the W right-of-way line of the Northern Pacific Railroad; thence N along said W right-of-way line 250 feet; thence W to the W right-of-way line of State Highway 9; thence N along said W right-of-way line to a point 500 feet N of the N right-of-way line of West Big Lake Boulevard; thence W 250 feet; thence S parallel to and 250 feet from State Highway 9 to a point 250 feet from West Big Lake Boulevard; thence W and S parallel to and 250 feet from the W right-of-way line of West Big Lake Boulevard to a point 250 feet N from the Little Mountain Road; thence SW parallel to and 250 feet from the N right-of-way line of the Little Mountain Road to a point 200 feet S of the S line of the NE 1/4 of the SE 1/4 of Section 35, Township 34 N, R 4 E.W.M.; thence E to a point 250 feet W of the W right-of-way line of West Big Lake Boulevard; thence S parallel to and 250 feet from the W right-of-way line of West Big Lake Boulevard to the N line of the SW 1/4 of Section 1, Township 33 N, R 4 E.W.M.; thence E along said line to the E right-of-way line of West Big Lake Boulevard; thence S along said line to a point of intersection on the W right-of-way line of State Highway 9; thence N along said line to the point of beginning. (Res. 5609, 1971; 38 CJ 673)

6.52.040 Sewer District No. 3.

Sewer District No. 3 is declared to be duly organized.

The boundaries of said district are hereby established as follows:

Commencing at the center of Section 6, Township 34 N, R 2 E.W.M., thence S along the N-S centerline of Sections 6 and 7 to the Shoreline of Lake Campbell, thence following the shoreline of Lake Campbell S and W to the N-S centerline of Section 13, Township 34 N, R 1, thence S along the N-S centerline of Sections 13 and 24 to the N line of the State Highway 20, (Deception Pass Highway) thence W following the N line of the State Highway 20, (Deception Pass Highway) to the W line of Section 24, Township 34, R 1, thence S along the Section line to the shoreline of Deception Pass, thence E and N along the shoreline of Deception Pass and Similk Bay to the intersection of the N-S centerline of Section 9, Township 34 N, R 2; thence N along said centerline of Section 9 (Thompson Road) to its intersection with the S line of S March's Point Road, thence W along the S line of said road and State Highway 20 to its intersection with the centerline of State Highway 20 W (Deception Pass Highway), thence S along centerline of said Highway to its intersection with the E -W centerline of Section 5, Township 34 N, R 2, thence W along the centerline of Sections 5 and 6 to the point of beginning. (Res. 6316, 1974; 41 CJ 608)