Chapter 16.24
FINAL PLAT REQUIREMENTS

Sections:

16.24.010    Form of final plat.

16.24.020    Intent of final plat.

16.24.030    Compliance with RCW and WAC.

16.24.040    Requirements.

16.24.010 Form of final plat.

The final plat shall be prepared by a land surveyor on mylar, 18 inches by 24 inches. More than one sheet may be required. (Ord. 603 § 1, 2009; Ord. 497 § 1, 2000)

16.24.020 Intent of final plat.

The final plat shall not deviate from the intent of the preliminary plat upon which tentative approval was granted. (Ord. 603 § 1, 2009; Ord. 497 § 1, 2000)

16.24.030 Compliance with RCW and WAC.

All final plats submitted to the town shall meet the requirements set out in Chapter 58.09 RCW, Chapter 332-130 WAC, and the requirements set out in YPMC 16.24.040. (Ord. 603 § 1, 2009; Ord. 497 § 1, 2000)

16.24.040 Requirements.

Each and every plat, or replat, of any property filed for record shall contain the following:

A. Statements, declarations, or dedications, and certifications of approval and recording as follows:

1. A declaration statement, or if there is to be a dedication of public right-of-way, a dedication statement, by the owner(s) of the property being subdivided declaring their intent to subdivide the property, including certification of the owner(s) signature by a notary public;

2. A statement of approval from the town staff;

3. A statement by the registered land surveyor certifying that the plat is based upon an actual survey;

4. If there is a dedication of public right-of-way, a statement by the town clerk/treasurer that there are no delinquent special assessments and all special assessments on any of the property to be dedicated are paid in full;

5. Certificates of approval by the planning commission, mayor, and council;

6. A recording certificate signed by the appropriate officials of the King County department of records and elections; and

7. A certification from the proper officer or officers in charge of tax collections that all taxes and delinquent assessments for which the property may be liable as of the date of certification have been duly paid, satisfied or discharged.

Samples of these statements and certificates can be obtained from the town clerk/treasurer.

B. Identification and Description. The following data shall be shown on the plat:

1. Name of subdivision and plat file number;

2. Location by section, township, and range and the notation “Town of Yarrow Point, Washington”;

3. The name, address, seal and signature of the land surveyor who prepared the plat drawing;

4. The name of the developer;

5. Scale, date, and the direction of north referenced to Washington Lambert Grid, north zone, or approved alternative;

6. The description of the property platted as shown on the plat certificate (see YPMC 16.12.030(I));

7. A complete survey of the plat and section, or sections, in which the plat is located, or as much as may be necessary to properly orient the plat within such section or sections;

8. True courses and distances to the nearest section corners which shall accurately establish the location of the subdivision;

9. The subdivision boundary lines with accurate distances and bearings referenced to Washington Lambert Grid, north zone, or approved alternative;

10. The name, location, width, bearings and distances of all easements within the subdivision;

11. Radii, internal angles, points of curvature, tangent bearings, and length of all arcs;

12. All lot numbers, and lot perimeter dimensions and bearings;

13. The location of survey monuments;

14. Accurate outlines of any areas to be dedicated or reserved for public use, with the purpose and the statement of dedication indicated thereon, and any area to be reserved by deed covenant for common uses of certain property owners. (Ord. 603 § 1, 2009; Ord. 497 § 1, 2000)